hit counter script
Download Print this page

Testing The Gear Unit - Siemens SIMOTICS GP Compact Operating Instructions

Low-voltage motors

Advertisement

6.0 - TESTING THE GEAR UNIT

The gear unit has been factory tested by the Manufacturer.
Before starting the unit, check that:
The machine incorporating the gear unit complies with the provisions of the "Machinery Directive"
98/37/EC and any other applicable safety legislation.
The gear unit's mounting position in the installation corresponds to that prescribed and indicated on the
nameplate.
The electrical power supply and control systems are suitable and operational as stipulated in standard EN
60204-1, and grounded as per standard EN 50014.
The motor power supply corresponds to that prescribed and is within ± 5% of the rated value.
The oil level is as prescribed and that there are no leaks from the caps or gaskets.
The unit does not run noisily or with excessive vibration.
Before starting up the unit, check and ensure that:
Assembly is not carried out in a potentially explosive atmosphere (oil, acid, gas, vapour or ra-
diation) and that there is no dust deposits thicker than 5 mm on the gear unit.
During service the gear unit is sufficiently ventilated and that it is not subject to radiation from
external heat sources.
During service the cooling air does not exceed 40 °C.
The oil level, drain and vent plugs are all easily accessible.
All accessories of any type mounted onto the gear unit are ATEX compliant.
Gear units with hollow shafts, with or without shrink disk, have been correctly mounted.
The gear unit is thoroughly cleaned after installation.
All guards installed to prevent accidental contact between operators and the gear unit's moving
parts or seals, are effective.
17

Advertisement

Chapters

loading