hit counter script

Cisco Catalyst 3560-CX User Manual page 43

Hide thumbs Also See for Catalyst 3560-CX:
Table of Contents

Advertisement

Switch Installation
To prevent airflow restriction, allow clearance around the ventilation openings to be at least: 3 in. (7.6 cm)
Statement 1076
Step 1
Position the switch directly in front of the DIN rail, making sure that the top of the DIN rail mount clip hooks over the
top of the DIN rail.
Figure 26: Mounting the Switch on a DIN Rail
Step 2
Rotate the switch down toward the DIN rail until the release tabs on the DIN rail mount clicks.
Step 3
Lift lightly on the bottom of the switch to ensure that it is firmly locked in place.
Catalyst 3560-CX and 2960-CX Switch Hardware Installation Guide
On a DIN Rail
33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 2960-cx

Table of Contents

Save PDF