hit counter script

Introduction; Ce Marking; System Design And Planing; Personnel - Honeywell NFS Supra Installation And Operating Manual

Conventional fire alarm control panel
Table of Contents

Advertisement

NFS Supra

1 Introduction

The purpose of this manual is to provide the user with all recommended procedure descriptions and full technical details for the successful installation and
commissioning of the extinguishing control panel which is referred to.
Procedures described in this manual include appropriate warnings and cautions to guide the user towards adopting safe and methodical work practices during the
installation and commissioning phases.

1.1 CE Marking

This panel is CE Marked to show that it conforms to the requirements of the following European Community Directives:
• Electromagnetic Compatibility Directive 89/336/EEC (and the amendment of the Directives 92/31/EEC, 93/68/EEC).
• Dir Low Voltage Directive 73/23/EEC (and the amendment of the Directive 93/68/EEC).
• The Constructive Products Directive by the application of the following standards:
• UNE-EN 54-2: Fire detection and fire alarm systems - Control and indicating equipment.
• UNE-EN 54-4/A2:2006: Fire detection and fire alarm systems - Power supply equipment..
1.2 System design and Planning
It is assumed that the system, of which this control panel is a part, has been designed by a competent fire alarm system designer in accordance with the
requirements of EN54 Part 14 (UNE 23007/14) and other applicable local standards.
The equipment connected to this system must be compatible, must comply with the standards and requirements concerning them and must be properly
registered and certified for compliance with the whole system.
The design drawings should clearly show the positions of all the control panel and field devices.
NFS Supra control panels are manufactured in compliance with national and local standards and meet the requirements of UNE-EN 12094-1:2004, UNE-EN 54-
2 and UNE-EN 54-4/A2:2006.
However, some installation and configuration practices may not meet the standards. Contact the proper authorities to confirm the requirements.

1.3 Personnel

Only suitably qualified electrical engineers must carry out the installation of this product
Read carefully the commissioning and configuration procedures of this manual. It is recommended by the manufacturer to check the wiring lines before making
any connection to the panel or equipment. Do not carry out any configuration functions without fully understanding of their operation.
HLS-MN-025 v.04
www.honeywelllifesafety.es
www.hoeywelllifesafety.es
.
Introduction
Installation and Operating Manual
Page 4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ess-2plusVsn-2plus

Table of Contents