hit counter script

Operation; First-Time Operation; Fill Engine Oil; Breaking In Engine - Yamaha F50 Owner's Manual

Hide thumbs Also See for F50:
Table of Contents

Advertisement

Operation

EMU36381

First-time operation

EMU36391

Fill engine oil

The engine is shipped from the factory with-
out engine oil. If your dealer did not fill the oil,
you must fill it before starting the engine.
NOTICE: Check that the engine is filled
with oil before first-time operation to
avoid severe engine damage.
The engine is shipped with the following
sticker, which should be removed after en-
gine oil is filled for the first time. For more in-
formation on checking the engine oil level,
see page 56.
EMU30174

Breaking in engine

Your new engine requires a period of break-
in to allow mating surfaces of moving parts to
wear in evenly. Correct break-in will help en-
sure proper performance and longer engine
life. NOTICE: Failure to follow the break-in
procedure could result in reduced engine
life or even severe engine damage.
EMU27085
Procedure for 4-stroke models
Your new engine requires a period of 10
hours break-in to allow mating surfaces of
moving parts to wear in evenly.
TIP:
Run the engine in the water, under load (in
gear with a propeller installed) as follows.
54
For 10 hours for breaking in engine avoid ex-
tended idling, rough water and crowded ar-
eas.
1.
2.
[ECM01781]
3.
4.
EMU36400

Getting to know your boat

Different boats handle differently. Operate
cautiously while you learn how your boat
handles under different conditions and with
different trim angles (see page 70).
EMU36413
ZMU01710

Checks before starting engine

EWM01921
If any item in "Checks before starting en-
gine" is not working properly, have it in-
spected and repaired before operating
the outboard motor. Otherwise, an acci-
dent could occur.
[ECM00801]
ECM00120
NOTICE
Do not start the engine out of water. Over-
heating and serious engine damage can
occur.
EMU36421

Fuel level

Be sure you have plenty of fuel for your trip.
For the first hour of operation:
Run the engine at varying speeds up to
2000 r/min or approximately half throttle.
For the second hour of operation:
Increase engine speed as much as nec-
essary to put the boat on plane (but
avoid full-throttle operation), then back
off on the throttle while keeping the boat
at a planing speed.
Remaining 8 hours:
Run the engine at any speed. However,
avoid operating at full throttle for more
than 5 minutes at a time.
After the first 10 hours:
Operate the engine normally.
WARNING

Advertisement

Table of Contents
loading

This manual is also suitable for:

T50F70T60F60

Table of Contents

Save PDF