Chapter 2
Switch Installation
Note
Catalyst 3560CPD-8PT-S
•
•
Note
All models (except the Catalyst 2960CPD-8PT-L, 2960CPD-8TT-L, and 3560CPD-8PT-S)
•
Verifying Switch Operation
As the switch powers on, it begins the POST, a series of tests that runs automatically to ensure that the
switch functions properly. LEDs blink during the test, which lasts approximately 1 minute. When the
switch begins POST, the System, Status, Duplex, and Speed LEDs turn green. The System LED blinks
green, and the other LEDs remain green.
When the POST completes successfully, the System LED turns green. The other LEDs turn off and then
reflect the switch operating status. If a switch fails POST, the System LED turns amber.
POST failures are usually fatal. Call Cisco technical support representative if your switch fails POST.
After a successful POST, unplug the power cord from the switch. Mount the switch in a rack on a desk
or shelf, under a desk or shelf, or on a wall, as described in the
page
Mounting the Switch
•
•
•
•
•
OL-23803-02
You can use both the uplink port and the auxiliary power adapter. However, the auxiliary power
input takes precedence.
Connect a 10/100/1000 uplink port to a PoE+ switch, such as a Catalyst 3750-X.
Or
Plug the auxiliary power adapter cord into the switch AUX power connector and into an AC power
outlet.
You can use both the uplink port and the auxiliary power adapter. However, the auxiliary power
input takes precedence.
Plug the AC power cord to the switch AC power connector and into an AC power outlet.
2-5.
On a Desk or Shelf (without Mounting Screws)
Desk, Shelf, or Wall (with Mounting Screws)
With a Mounting Tray
In a Rack
On a DIN Rail
"Mounting the Switch" section on
Catalyst 3560-C and 2960-C Switch Hardware Installation Guide
Verifying Switch Operation
2-5