hit counter script

Site Preparation And Maintenance Records - Cisco Nexus 9396PX Hardware Installation Manual

Aci-mode switch
Table of Contents

Advertisement

Site Preparation and Maintenance Records

Site Preparation Checklist
Planning the location and layout of your equipment rack or cabinet is essential for successful switch operation,
ventilation, and accessibility.
The following table lists the site planning tasks that we recommend that you complete before you install the
switch. Your completion of each task ensures a successful switch installation.
Planning Activity
Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Physical access
Maintenance access
Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Airflow
Site Preparation Checklist, on page 63
Contact and Site Information, on page 64
Chassis and Module Information, on page 65
Verification Time and Date
A P P E N D I X
Cisco Nexus 9396PX ACI-Mode Switch Hardware Installation Guide
E
63

Advertisement

Table of Contents
loading

This manual is also suitable for:

N9k-c9396px

Table of Contents