hit counter script

Cisco OSR-7609 Upgrade Manual page 6

Cisco systems switch/router upgrage manual
Hide thumbs Also See for OSR-7609:
Table of Contents

Advertisement

Replacing the Panel Safety Cover
Figure 1
On the new panel safety cover, grasp the panel handle and press the panel into place, starting at the
Step 3
bottom of the chassis and working up. Be careful not to damage the EMI gasket.
Use a number 1 Phillips-head screwdriver to install the 8 panel screws, 4 each located along the top and
Step 4
bottom of the chassis. (See
Proceed to the
Step 5
Catalyst 6509-NEB Switch and Cisco OSR-7609 Router Upgrade Note
6
Removing the Panel Safety Cover
Figure
2.)
"Replacing the Fan Tray" section on page 7
Panel
handle
to replace the fan tray.
78-16162-02

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6509-nebWs-c6509

Table of Contents

Save PDF