hit counter script

Powering Up The System - Cisco OSR-7609 Upgrade Manual

Cisco systems switch/router upgrage manual
Hide thumbs Also See for OSR-7609:
Table of Contents

Advertisement

Figure 17
RTN -48VDC GND
WS-C 6500- NEB- FAN2

Powering Up the System

This section describes how to power up the system.
AC-Input Systems
To power up your AC-input system, follow these steps:
Plug the power cord into the power supply, and tighten the screw on the cable retention device.
Step 1
Connect the other end of the power cord to an AC-input power source.
Step 2
In a system with dual power supplies, connect each power supply to a separate input source. In case of
Caution
a power source failure, the second source will most likely still be available.
Step 3
Turn the power switch to the On (|) position on the power supply. Switching the power switch to On also
engages a pawl that locks the power supply in the bay.
78-16162-02
Ejector Lever Closure in the Chassis
48V INPUT 1
HIGH SPE ED FAN
INPOUT POWER
GOOD
All ejector levers flush
with module faceplate
AC-Input Systems, page 21
DC-Input Systems, page 22
48V INPUT 2
FAN FAIL
INPOUT POWER
GOOD
RTN -48VDC GND
Catalyst 6509-NEB Switch and Cisco OSR-7609 Router Upgrade Note
Powering Up the System
21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 6509-nebWs-c6509

Table of Contents

Save PDF