hit counter script
Table of Contents

Advertisement

Quick Links

Power Systems
Installing the IBM Power System S824
(8286-42A)
IBM
GI11-9905-06

Advertisement

Table of Contents
loading

Summary of Contents for IBM Power System S824

  • Page 1 Power Systems Installing the IBM Power System S824 (8286-42A) GI11-9905-06...
  • Page 3 Power Systems Installing the IBM Power System S824 (8286-42A) GI11-9905-06...
  • Page 4 Note Before using this information and the product it supports, read the information in “Safety notices” on page v, “Notices” on page 35, the IBM Systems Safety Notices manual, G229-9054, and the IBM Environmental Notices and User Guide, Z125–5823. ™...
  • Page 5: Table Of Contents

    Safety notices ....... . . v Installing the IBM Power System S824 (8286-42A)....1 Determining the installation type Installing a rack-mounted server.
  • Page 6 Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 7: Safety Notices

    Electrical voltage and current from power, telephone, and communication cables are hazardous. To avoid a shock hazard: v If IBM supplied the power cord(s), connect power to this unit only with the IBM provided power cord. Do not use the IBM provided power cord for any other product.
  • Page 8 Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top of rack-mounted devices. In addition, do not lean on rack mounted devices and do not use them to stabilize your body position (for example, when working from a ladder). Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 9 v Each rack cabinet might have more than one power cord. – For AC powered racks, be sure to disconnect all power cords in the rack cabinet when directed to disconnect power during servicing. – For racks with a DC power distribution panel (PDP), turn off the circuit breaker that controls the power to the system unit(s), or disconnect the customer’s DC power source, when directed to disconnect power during servicing.
  • Page 10 DANGER: Hazardous voltage, current, or energy levels are present inside any component that has this label attached. Do not open any cover or barrier that contains this label. (L001) (L002) viii Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 11 DANGER: Rack-mounted devices are not to be used as shelves or work spaces. (L002) (L003) Safety notices...
  • Page 12 DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) (L007) CAUTION: A hot surface nearby. (L007) (L008) Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 13 Exchange only with the IBM-approved part. Recycle or discard the battery as instructed by local regulations. In the United States, IBM has a process for the collection of this battery. For information, call 1-800-426-4333. Have the IBM part number for the battery unit available when you call. (C003)
  • Page 14 (C048) Power and cabling information for NEBS (Network Equipment-Building System) GR-1089-CORE The following comments apply to the IBM servers that have been designated as conforming to NEBS (Network Equipment-Building System) GR-1089-CORE: Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 15 The equipment is suitable for installation in the following: v Network telecommunications facilities v Locations where the NEC (National Electrical Code) applies The intrabuilding ports of this equipment are suitable for connection to intrabuilding or unexposed wiring or cabling only. The intrabuilding ports of this equipment must not be metallically connected to the interfaces that connect to the OSP (outside plant) or its wiring.
  • Page 16 Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 17: Installing The Ibm Power System S824 (8286-42A)

    Use the information to understand the prerequisites that are required for installing the server. You might need to read the following documents before you install the server: v The latest version of this document is maintained online, see Installing the IBM Power System S824 (8286-42A) (http://www.ibm.com/support/knowledgecenter/POWER8/p8egg/ p8egg_840_kickoff.htm).
  • Page 18: Completing Inventory For Your Server

    If you have incorrect, missing, or damaged parts, consult any of the following resources: v Your IBM reseller. v IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States only). v The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your location to view the service and support contact information.
  • Page 19 8. On the right side, find the EIA unit that corresponds to the bottom EIA unit marked on the front of the rack. 9. Place a self-adhesive dot at the bottom EIA unit. 10. Mark the corresponding holes on the left side of the rack. Installing the IBM Power System S824 (8286-42A)
  • Page 20: Attaching The Mounting Hardware To The Rack

    Do not install mismatched hardware by using washers or spacers. If you do not have the correct rails and fittings for your rack, contact your IBM reseller. To install the rack-mounting hardware into the rack, complete the following steps: 1.
  • Page 21 EIA unit that were previously marked. Lower the slide rail down (1) to engage the hook feature on the middle pin. For details, see Figure 5. Figure 5. Pins that are seated on the front rail of the rack Installing the IBM Power System S824 (8286-42A)
  • Page 22: Installing The 8286-42A System Into The Rack

    (4) until the other nail heads slip into the other slots on the slide rails. Ensure that the front latch (5) slides over the nail heads. Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 23: Installing The Cable-Management Arm

    Use the procedure to install the cable-management arm. To install the cable-management arm, complete the following steps: 1. Ensure that you have the following parts. Item Description Support arm Cable-management stop bracket Mounting bracket Cable-management arm Extension bracket Installing the IBM Power System S824 (8286-42A)
  • Page 24 Insert the tab into the hole (1) and turn the bracket (2) to secure it to the support arm. For details, see Figure 11 on page 9. Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 25 Figure 12. Extending the pin, and installing the bracket into the slide rail 5. Slide the extension bracket (E) into the right slide rail until the spring-loaded pin snaps into place. For details, see Figure 13 on page 10. Installing the IBM Power System S824 (8286-42A)
  • Page 26 Slide the other cable-management arm tab into the extension bracket (E) on the outside of the right slide rail (2). Push the tab until the spring-loaded latch snaps into place. For details, see Figure 15 on page 11 and Figure 16 on page 11. Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 27: Cabling The Server And Setting Up A Console

    Your console, monitor, or interface choices are guided by whether you create logical partitions, which operating system you install in your primary partition, and whether you install a Virtual I/O Server (VIOS) in one of your logical partitions. Installing the IBM Power System S824 (8286-42A)
  • Page 28: Determining Which Console To Use

    3) If your system uses two PDUs for redundancy, complete the following steps: v If your system has two power supplies, attach one power supply to each of the two PDUs. Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 29: Cabling The Server To The Hmc

    1. If you want to directly attach your HMC to the managed system, connect Ethernet Connector 1 on the HMC to the HMC1 port on the managed system. See Figure 17 on page 14. Installing the IBM Power System S824 (8286-42A)
  • Page 30: Cabling The Server And Accessing The Ivm

    1. Connect a serial cable from a PC or ASCII terminal to a system port on the server. For details, see Accessing the ASMI using a web browser. 2. Complete the following steps: a. Verify that you have access to the Advanced System Management Interface (ASMI) by using the web interface. Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 31: Cabling The Server With Keyboard, Video, And Mouse

    3) Select Boot to SMS menu in the AIX or Linux partition mode by boot field. ® 4) If you are installing the Integrated Virtualization Manager on an IBM System i model, select AIX or Linux in the Default partition environment field.
  • Page 32: Cabling The Server And Connecting Expansion Units

    To complete the server setup by using an HMC, complete the following steps: 1. Attach the server to the rack using the shipping screws (A) that were provided with your system. Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 33 Select Actions > View all actions > Operations > Change system Password. For more information about setting passwords for the managed system by using the HMC Classic or HMC Enhanced interface, see Setting passwords for the managed system (http://www.ibm.com/ support/knowledgecenter/POWER8/p8hai/setpasswordsforthemanagedsystem.htm). For more information about setting passwords for the managed system by using the HMC Enhanced interface, see Setting passwords for the managed system (http://www.ibm.com/support/knowledgecenter/...
  • Page 34 Select the server for which you want to view system information. c. In the menu pod, expand System Actions and then expand Updates. d. Select View System Information. e. Select a LIC repository from the list and click OK. Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 35 If you are using system plans or you did not log in to the HMC by using the HMC Enhanced or HMC Enhanced+ login option, you can create partitions or deploy system plans. v For instructions about creating partitions, see Partitioning with the HMC (http://www.ibm.com/ support/knowledgecenter/POWER8/p8hat/p8hat_lparwithhmcp6.htm).
  • Page 36: Completing The Server Setup Without Using An Hmc

    3. To start a system, complete the following steps: a. Open the front door of the managed system. b. Press the power button on the control panel. The power-on light begins to flash faster. Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 37: Setting Up A Preinstalled Server

    Setting up a preinstalled server Learn how to set up a IBM Power System S824 (8286-42A) that is preinstalled in the rack. Note: The terracotta shipping brackets on the right and left of the rear of the server do not interfere with the installation or operation of the system.
  • Page 38: Completing Inventory For Your Preinstalled Server

    If you have incorrect, missing, or damaged parts, consult any of the following resources: v Your IBM reseller. v IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States only). v The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your location to view the service and support contact information.
  • Page 39 Store the shipping bracket if you want to move your system at a later date. 2. Cable the server. a. Plug the top two power cords into the power supply and attach the cables to the handles on the power supply with cable ties or hook-and-loop fasteners. Installing the IBM Power System S824 (8286-42A)
  • Page 40: Cabling The Server And Setting Up A Console

    “Cabling the server Management Console cross-over cable) to the HMC” on page (HMC) Integrated AIX or Linux Serial cable “Cabling the server Virtualization and accessing the Manager for VIOS IVM” on page 27 Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 41: Cabling The Server With An Ascii Terminal

    6. Press Enter until the server information appears. You have completed the setup for an ASCII terminal, and have started the ASMI. 7. Continue with “Completing the server setup without using an HMC” on page 31. Installing the IBM Power System S824 (8286-42A)
  • Page 42: Cabling The Server To The Hmc

    HMC network connections (http://www.ibm.com/support/knowledgecenter/POWER8/ p8hai/netconhmc.htm). Notes: v You can also have multiple systems that are attached to a switch that is then connected to the HMC. For instructions, see HMC network connections (http://www.ibm.com/support/ knowledgecenter/POWER8/p8hai/netconhmc.htm). Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 43: Cabling The Server And Accessing The Ivm

    3) Select Boot to SMS menu in the AIX or Linux partition mode by boot field. 4) If you are installing the Integrated Virtualization Manager on an IBM System i model, select AIX or Linux in the Default partition environment field.
  • Page 44: Cabling The Server With Keyboard, Video, And Mouse

    To manage POWER8 processor-based systems, the HMC must be at version 8 release 8.4.0 or later. To complete the server setup by using an HMC, complete the following steps: Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 45 Select Actions > View all actions > Operations > Change system Password. For more information about setting passwords for the managed system by using the HMC Classic or HMC Enhanced interface, see Setting passwords for the managed system (http://www.ibm.com/ support/knowledgecenter/POWER8/p8hai/setpasswordsforthemanagedsystem.htm). For more information about setting passwords for the managed system by using the HMC Enhanced interface, see Setting passwords for the managed system (http://www.ibm.com/support/knowledgecenter/...
  • Page 46 7. Create partitions using templates, if you logged in to the HMC by using the Enhanced or HMC Enhanced+ login option. v If you are creating new partitions, you can use the templates that are on your HMC. For more information, see Accessing the template library (http://www.ibm.com/support/knowledgecenter/ POWER8/p8efc/p8efc_accessing_template_library.htm). Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 47: Completing The Server Setup Without Using An Hmc

    If you are using system plans or you did not log in to the HMC by using the HMC Enhanced or HMC Enhanced+ login option, you can create partitions or deploy system plans. v For instructions about creating partitions, see Partitioning with the HMC (http://www.ibm.com/ support/knowledgecenter/POWER8/p8hat/p8hat_lparwithhmcp6.htm).
  • Page 48: Completing The Server Setup Without Using An Hmc

    The power-on light on the control panel stops flashing and remains on, indicating that the system is powered on. For instructions, see Starting a system that is not managed by an HMC (http://www.ibm.com/ support/knowledgecenter/POWER8/p8haj/startsysnohmc.htm). 3. Install an operating system and update the operating system.
  • Page 49 The power-on light on the control panel stops flashing and remains on, indicating that the system is powered on. For instructions, see Starting a system that is not managed by an HMC (http://www.ibm.com/ support/knowledgecenter/POWER8/p8haj/startsysnohmc.htm). 3. Install an operating system and update the operating system.
  • Page 50 Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 51: Notices

    Consult your local IBM representative for information on the products and services currently available in your area. Any reference to an IBM product, program, or service is not intended to state or imply that only that IBM product, program, or service may be used. Any functionally equivalent product, program, or service that does not infringe any IBM intellectual property right may be used instead.
  • Page 52: Accessibility Features For Ibm Power Systems Servers

    All IBM prices shown are IBM's suggested retail prices, are current and are subject to change without notice. Dealer prices may vary. This information is for planning purposes only. The information herein is subject to change before the products described become available.
  • Page 53: Privacy Policy Considerations

    This product uses standard navigation keys. Interface information The IBM Power Systems servers user interfaces do not have content that flashes 2 - 55 times per second. The IBM Power Systems servers web user interface relies on cascading style sheets to render content properly and to provide a usable experience.
  • Page 54: Trademarks

    IBM, the IBM logo, and ibm.com are trademarks or registered trademarks of International Business Machines Corp., registered in many jurisdictions worldwide. Other product and service names might be trademarks of IBM or other companies. A current list of IBM trademarks is available on the web at Copyright and trademark information at www.ibm.com/legal/copytrade.shtml.
  • Page 55 Warning: This is a Class A product. In a domestic environment, this product may cause radio interference, in which case the user may be required to take adequate measures. VCCI Statement - Japan The following is a summary of the VCCI Japanese statement in the box above: This is a Class A product based on the standard of the VCCI Council.
  • Page 56 Warning: This is a Class A product. In a domestic environment this product may cause radio interference in which case the user will be required to take adequate measures. IBM Taiwan Contact Information: Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 57 Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
  • Page 58: Class B Notices

    Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. Proper cables and connectors are available from IBM-authorized dealers. IBM is not responsible for any radio or television interference caused by unauthorized changes or modifications to this equipment.
  • Page 59 European Community contact: IBM Deutschland GmbH Technical Regulations, Abteilung M456 IBM-Allee 1, 71139 Ehningen, Germany Tel: +49 800 225 5426 email: halloibm@de.ibm.com VCCI Statement - Japan Japan Electronics and Information Technology Industries Association Statement This statement explains the Japan JIS C 61000-3-2 product wattage compliance.
  • Page 60 Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
  • Page 61: Terms And Conditions

    Permissions for the use of these publications are granted subject to the following terms and conditions. Applicability: These terms and conditions are in addition to any terms of use for the IBM website. Personal Use: You may reproduce these publications for your personal, noncommercial use provided that all proprietary notices are preserved.
  • Page 62 Power Systems: Installing the IBM Power System S824 (8286-42A)
  • Page 64 IBM® Part Number: 01LK523 Printed in USA GI11-9905-06...

This manual is also suitable for:

8286-42a

Table of Contents