Page 1
Power Systems Installing the IBM Power System S812L (8247-21L) GI11-9907-06...
Page 3
Power Systems Installing the IBM Power System S812L (8247-21L) GI11-9907-06...
Page 4
Note Before using this information and the product it supports, read the information in “Safety notices” on page v, “Notices” on page 45, the IBM Systems Safety Notices manual, G229-9054, and the IBM Environmental Notices and User Guide, Z125–5823. ™...
Safety notices ....... . . v Installing the IBM Power System S812L (8247-21L) ....1 Determining your server type Installing a rack-based server .
Page 6
Privacy policy considerations . 47 Trademarks . . 48 Electronic emission notices . . 48 Class A Notices . . 48 Class B Notices . . 52 Terms and conditions . . 55 Power Systems: Installing the IBM Power System S812L (8247-21L)
Electrical voltage and current from power, telephone, and communication cables are hazardous. To avoid a shock hazard: v If IBM supplied the power cord(s), connect power to this unit only with the IBM provided power cord. Do not use the IBM provided power cord for any other product.
Page 8
Rack-mounted devices are not to be used as shelves or work spaces. Do not place objects on top of rack-mounted devices. In addition, do not lean on rack mounted devices and do not use them to stabilize your body position (for example, when working from a ladder). Power Systems: Installing the IBM Power System S812L (8247-21L)
Page 9
v Each rack cabinet might have more than one power cord. – For AC powered racks, be sure to disconnect all power cords in the rack cabinet when directed to disconnect power during servicing. – For racks with a DC power distribution panel (PDP), turn off the circuit breaker that controls the power to the system unit(s), or disconnect the customer’s DC power source, when directed to disconnect power during servicing.
Page 10
DANGER: Hazardous voltage, current, or energy levels are present inside any component that has this label attached. Do not open any cover or barrier that contains this label. (L001) (L002) viii Power Systems: Installing the IBM Power System S812L (8247-21L)
Page 11
DANGER: Rack-mounted devices are not to be used as shelves or work spaces. (L002) (L003) Safety notices...
Page 12
DANGER: Multiple power cords. The product might be equipped with multiple AC power cords or multiple DC power cables. To remove all hazardous voltages, disconnect all power cords and power cables. (L003) (L007) CAUTION: A hot surface nearby. (L007) (L008) Power Systems: Installing the IBM Power System S812L (8247-21L)
Page 13
Exchange only with the IBM-approved part. Recycle or discard the battery as instructed by local regulations. In the United States, IBM has a process for the collection of this battery. For information, call 1-800-426-4333. Have the IBM part number for the battery unit available when you call. (C003)
Page 14
(C048) Power and cabling information for NEBS (Network Equipment-Building System) GR-1089-CORE The following comments apply to the IBM servers that have been designated as conforming to NEBS (Network Equipment-Building System) GR-1089-CORE: Power Systems: Installing the IBM Power System S812L (8247-21L)
Page 15
The equipment is suitable for installation in the following: v Network telecommunications facilities v Locations where the NEC (National Electrical Code) applies The intrabuilding ports of this equipment are suitable for connection to intrabuilding or unexposed wiring or cabling only. The intrabuilding ports of this equipment must not be metallically connected to the interfaces that connect to the OSP (outside plant) or its wiring.
Page 16
Power Systems: Installing the IBM Power System S812L (8247-21L)
Use the information to understand the prerequisites that are required for installing the server. You might need to read the following documents before you install the server: v The latest version of this document is maintained online. See Installing the IBM Power System S812L (8247-21L) (http://publib.boulder.ibm.com/infocenter/systems/scope/hw/topic/p8egi/ p8egi_roadmap.htm).
If you have incorrect, missing, or damaged parts, consult any of the following resources: v Your IBM reseller. v IBM Rochester manufacturing automated information line at 1-800-300-8751 (United States only). v The Directory of worldwide contacts website http://www.ibm.com/planetwide. Select your location to view the service and support contact information.
Page 19
8. On the right side, find the EIA unit that corresponds to the bottom EIA unit marked on the front of the rack. 9. Place a self-adhesive dot at the bottom EIA unit. 10. Mark the corresponding holes on the left side of the rack. Installing the IBM Power System S812L (8247-21L)
Do not install mismatched hardware by using washers or spacers. If you do not have the correct rails and fittings for your rack, contact your IBM reseller. To install the rack-mounting hardware into the rack, complete the following steps: 1.
Page 21
EIA unit that were previously marked. Lower the slide rail down (1) to engage the hook feature on the middle pin. For details, see Figure 5. Figure 5. Pins that are seated on the front rail of the rack Installing the IBM Power System S812L (8247-21L)
(4) until the other nail heads slip into the other slots on the slide rails. Ensure that the front latch (5) slides over the nail heads. Power Systems: Installing the IBM Power System S812L (8247-21L)
Use the procedure to install the cable-management arm. To install the cable-management arm, complete the following steps: 1. Ensure that you have the following parts. Item Description Support arm Cable-management stop bracket Mounting bracket Cable-management arm Extension bracket Installing the IBM Power System S812L (8247-21L)
Page 24
Insert the tab into the hole (1) and turn the bracket (2) to secure it to the support arm. For details, see Figure 11 on page 9. Power Systems: Installing the IBM Power System S812L (8247-21L)
Page 25
Figure 12. Extending the pin, and installing the bracket into the slide rail 5. Slide the extension bracket (E) into the right slide rail until the spring-loaded pin snaps into place. For details, see Figure 13 on page 10. Installing the IBM Power System S812L (8247-21L)
Page 26
Slide the other cable-management arm tab into the extension bracket (E) on the outside of the right slide rail (2). Push the tab until the spring-loaded latch snaps into place. For details, see Figure 15 on page 11 and Figure 16 on page 11. Power Systems: Installing the IBM Power System S812L (8247-21L)
Your console, monitor, or interface choices are guided by whether you create logical partitions, which operating system you install in your primary partition, and whether you install a Virtual I/O Server (VIOS) in one of your logical partitions. Installing the IBM Power System S812L (8247-21L)
This helps you achieve superior resource usage, flexibility, and agility, resulting in cost reduction through economies of scale. To get started using PowerKVM virtualization technology on your system, see IBM PowerKVM. Go to the instructions for the applicable console, interface, or terminal in the following table.
Using service applications, the HMC can also communicate with managed systems to detect, consolidate, and forward information to IBM service for analysis. Installing the IBM Power System S812L (8247-21L)
Page 30
Autodetection. For information about how to set media speeds, see Setting the media speed (http://www.ibm.com/support/knowledgecenter/POWER8/p8hai/lanmediaspeed.htm). 3. If you are connecting a second HMC to your managed server, connect it to the Ethernet port that is labeled HMC2 on the managed server. Power Systems: Installing the IBM Power System S812L (8247-21L)
3) Select Boot to SMS menu in the AIX or Linux partition mode by boot field. ® 4) If you are installing the Integrated Virtualization Manager on an IBM System i model, select AIX or Linux in the Default partition environment field.
(http://www.ibm.com/support/knowledgecenter/POWER8/p8ham/p8ham_kickoff.htm). Completing the server setup Learn about the tasks you must complete to set up your managed system. ® One of the tasks you can perform to complete your server setup is to virtualize your server. IBM ™ ® PowerKVM...
This helps you achieve superior resource usage, flexibility, and agility, resulting in cost reduction through economies of scale. To get started using PowerKVM virtualization technology on your system, see Quick start guide for IBM PowerKVM (http://www.ibm.com/support/knowledgecenter/linuxonibm/liabq/liabqquick.htm). Completing the server setup without using an HMC: If you do not have an Hardware Management Console (HMC), use this procedure to complete the server setup.
Use the information to understand the prerequisites that are required for installing the server. You might need to read the following documents before you install the server: v The latest version of this document is maintained online, see (http://www.ibm.com/support/ knowledgecenter/POWER8/p8egi/p8egi_roadmap.htm).
5. If necessary, remove the filler panels to allow access to the inside of the rack enclosure where you plan to place the unit, as shown in For details, see Figure 18 on page 20 Installing the IBM Power System S812L (8247-21L)
Page 36
10. On the right side, find the EIA unit that corresponds to the bottom EIA unit marked on the front of the rack. 11. Place a self-adhesive dot at the bottom EIA unit. 12. Mark the corresponding holes on the left side of the rack. Power Systems: Installing the IBM Power System S812L (8247-21L)
Do not install mismatched hardware by using washers or spacers. If you do not have the correct rails and fittings for your rack, contact your IBM reseller. To install the rack-mounting hardware into the rack, complete the following steps: 1.
Page 38
EIA unit that were previously marked. Lower the slide rail down (1) to engage the hook feature on the middle pin. For details, see Figure 22. Figure 22. Pins that are seated on the front rail of the rack Power Systems: Installing the IBM Power System S812L (8247-21L)
Use the procedure to install the cable-management arm. To install the cable-management arm, complete the following steps: 1. Ensure that you have the following parts. Item Description Support arm Cable-management stop bracket Mounting bracket Cable-management arm Extension bracket Installing the IBM Power System S812L (8247-21L)
Page 40
Insert the tab into the hole (1) and turn the bracket (2) to secure it to the support arm. For details, see Figure 11 on page 9. Power Systems: Installing the IBM Power System S812L (8247-21L)
Page 41
Figure 27. Extending the pin, and installing the bracket into the slide rail 5. Slide the extension bracket (E) into the right slide rail until the spring-loaded pin snaps into place. For details, see Figure 13 on page 10. Installing the IBM Power System S812L (8247-21L)
Page 42
Slide the other cable-management arm tab into the extension bracket (E) on the outside of the right slide rail (2). Push the tab until the spring-loaded latch snaps into place. For details, see Figure 15 on page 11 and Figure 16 on page 11. Power Systems: Installing the IBM Power System S812L (8247-21L)
Installing the water-cooled 8247-21L system into the rack Use the procedure to install the water-cooled 8247-21L system into the rack. CAUTION: This system requires three people to install the system into the rack. Installing the IBM Power System S812L (8247-21L)
Page 44
Figure 32. Extending slide rails and aligning server nail heads with the slots on the rail 3. Lift the blue release latches (1) on the slide rails and push the server (2) all the way into the rack until it clicks into place. Power Systems: Installing the IBM Power System S812L (8247-21L)
Press the hose end of the quick connect onto the manifold end, until it clicks into place. Figure 34. Installing the quick connects to the supply and return hoses Note: Any hose can be plugged into plugged any quick connect, on the manifold side. Installing the IBM Power System S812L (8247-21L)
This helps you achieve superior resource usage, flexibility, and agility, resulting in cost reduction through economies of scale. To get started using PowerKVM virtualization technology on your system, see IBM PowerKVM. Go to the instructions for the applicable console, interface, or terminal in the following table.
4. Ensure that your ASCII terminal is set to the following general attributes. These attributes are the default settings for the diagnostic programs. Be sure that your terminal is set according to these attributes before proceeding to the next step. Installing the IBM Power System S812L (8247-21L)
1. If you want to directly attach your HMC to the managed system, connect Ethernet Connector 1 on the HMC to the HMC1 port on the managed system. See Figure 17 on page 14. Power Systems: Installing the IBM Power System S812L (8247-21L)
Notes: v You can also have multiple systems that are attached to a switch that is then connected to the HMC. For instructions, see HMC network connections (http://www.ibm.com/support/ knowledgecenter/POWER8/p8hai/netconhmc.htm). v If you are using a switch, ensure that the speed in the switch is set to Autodetection. If the server is directly attached to the HMC, ensure the Ethernet adapter speed on the HMC is set to Autodetection.
3) Select Boot to SMS menu in the AIX or Linux partition mode by boot field. 4) If you are installing the Integrated Virtualization Manager on an IBM System i model, select AIX or Linux in the Default partition environment field.
(http://www.ibm.com/support/knowledgecenter/POWER8/p8ham/p8ham_kickoff.htm). Completing the server setup Learn about the tasks you must complete to set up your managed system. ® One of the tasks you can perform to complete your server setup is to virtualize your server. IBM ™ ® PowerKVM...
6. You have now completed the steps to install your server. Setting up a preinstalled server Use this information to learn about setting up a IBM Power System S812L (8247-21L) server that is preinstalled in the rack. Note: The terracotta shipping brackets on the right and left of the rear of the server do not interfere with the installation or operation of the system.
To plan your server installation, see Planning for the system (http://www.ibm.com/support/ knowledgecenter/POWER8/p8had/p8had_8xx_kickoff.htm). v If you are using a Hardware Management Console (HMC), see Obtaining and applying machine code updates for the HMC with an Internet connection (http://www.ibm.com/support/knowledgecenter/ POWER8/p8hai/area3fixeshmc.htm). Consider the following prerequisites before you install the server: 1.
Page 54
Ensure that the two power cords are fully seated in the power supplies (A) and attach the cables to the handles on the power supply with cable ties or hook-and-loop fasteners (B). Power Systems: Installing the IBM Power System S812L (8247-21L)
“Cabling the server Management Console cross-over cable) to the HMC” on page (HMC) Integrated AIX or Linux Serial cable “Cabling the server Virtualization and accessing the Manager for VIOS IVM” on page 42 Installing the IBM Power System S812L (8247-21L)
6. Press Enter until the server information appears. You have completed the setup for an ASCII terminal, and have started the ASMI. 7. Continue with “Completing the server setup without using an HMC” on page 44. Power Systems: Installing the IBM Power System S812L (8247-21L)
Notes: v You can also have multiple systems that are attached to a switch that is then connected to the HMC. For instructions, see HMC network connections (http://www.ibm.com/support/ knowledgecenter/POWER8/p8hai/netconhmc.htm). v If you are using a switch, ensure that the speed in the switch is set to Autodetection. If the server...
3) Select Boot to SMS menu in the AIX or Linux partition mode by boot field. 4) If you are installing the Integrated Virtualization Manager on an IBM System i model, select AIX or Linux in the Default partition environment field.
3. Continue with “Completing the server setup.” Completing the server setup Learn about the tasks you must complete to set up your managed system. ® One of the tasks you can perform to complete your server setup is to virtualize your server. IBM ™ ® PowerKVM...
The power-on light on the control panel stops flashing and remains on, indicating that the system is powered on. For instructions, see Starting a system that is not managed by an HMC (http://www.ibm.com/ support/knowledgecenter/POWER8/p8haj/startsysnohmc.htm). 3. Install an operating system and update the operating system.
Consult your local IBM representative for information on the products and services currently available in your area. Any reference to an IBM product, program, or service is not intended to state or imply that only that IBM product, program, or service may be used. Any functionally equivalent product, program, or service that does not infringe any IBM intellectual property right may be used instead.
All IBM prices shown are IBM's suggested retail prices, are current and are subject to change without notice. Dealer prices may vary. This information is for planning purposes only. The information herein is subject to change before the products described become available.
This product uses standard navigation keys. Interface information The IBM Power Systems servers user interfaces do not have content that flashes 2 - 55 times per second. The IBM Power Systems servers web user interface relies on cascading style sheets to render content properly and to provide a usable experience.
IBM, the IBM logo, and ibm.com are trademarks or registered trademarks of International Business Machines Corp., registered in many jurisdictions worldwide. Other product and service names might be trademarks of IBM or other companies. A current list of IBM trademarks is available on the web at Copyright and trademark information at www.ibm.com/legal/copytrade.shtml.
Page 65
Warning: This is a Class A product. In a domestic environment, this product may cause radio interference, in which case the user may be required to take adequate measures. VCCI Statement - Japan The following is a summary of the VCCI Japanese statement in the box above: This is a Class A product based on the standard of the VCCI Council.
Page 66
Warning: This is a Class A product. In a domestic environment this product may cause radio interference in which case the user will be required to take adequate measures. IBM Taiwan Contact Information: Power Systems: Installing the IBM Power System S812L (8247-21L)
Page 67
Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
Properly shielded and grounded cables and connectors must be used in order to meet FCC emission limits. Proper cables and connectors are available from IBM-authorized dealers. IBM is not responsible for any radio or television interference caused by unauthorized changes or modifications to this equipment.
Page 69
European Community contact: IBM Deutschland GmbH Technical Regulations, Abteilung M456 IBM-Allee 1, 71139 Ehningen, Germany Tel: +49 800 225 5426 email: halloibm@de.ibm.com VCCI Statement - Japan Japan Electronics and Information Technology Industries Association Statement This statement explains the Japan JIS C 61000-3-2 product wattage compliance.
Page 70
Um dieses sicherzustellen, sind die Geräte wie in den Handbüchern beschrieben zu installieren und zu betreiben. Des Weiteren dürfen auch nur von der IBM empfohlene Kabel angeschlossen werden. IBM übernimmt keine Verantwortung für die Einhaltung der Schutzanforderungen, wenn das Produkt ohne Zustimmung von IBM verändert bzw.
Permissions for the use of these publications are granted subject to the following terms and conditions. Applicability: These terms and conditions are in addition to any terms of use for the IBM website. Personal Use: You may reproduce these publications for your personal, noncommercial use provided that all proprietary notices are preserved.
Page 72
Power Systems: Installing the IBM Power System S812L (8247-21L)
Page 74
IBM® Part Number: 01LK525 Printed in USA GI11-9907-06...