hit counter script
AEG AS-M 7-S Series Installation Manual
AEG AS-M 7-S Series Installation Manual

AEG AS-M 7-S Series Installation Manual

Glass-backsheet (standard) module series

Advertisement

Quick Links

AEG SOLAR MODULES
INSTALLATION
MANUAL
GLASS-BACKSHEET (STANDARD)
MODULE SERIES:
AS-MXXX2 / AS-MXXX3 / AS-MXXX7-S /
AS-MXXX8 / AS-PXXX8 / AS-MXXX9 / AS-PXXX9
AEG STANDARD MODULE INSTALLATION MANUAL
VERSION:
GD202104 V1-21

Advertisement

Table of Contents
loading

Summary of Contents for AEG AS-M 7-S Series

  • Page 1 AEG SOLAR MODULES INSTALLATION MANUAL GLASS-BACKSHEET (STANDARD) MODULE SERIES: AS-MXXX2 / AS-MXXX3 / AS-MXXX7-S / AS-MXXX8 / AS-PXXX8 / AS-MXXX9 / AS-PXXX9 AEG STANDARD MODULE INSTALLATION MANUAL VERSION: GD202104 V1-21...
  • Page 2: Table Of Contents

    SOLAR MODULES INSTALLATION 1.2 Product Identification MANUAL 2. Safety 2. 1 General safety Thank you for choosing the reliability of AEG solar 2.2 Handling safety modules. 2.3 Installation safety 2.4 Fire safety This installation manual is intended for dealers and 3.
  • Page 3: Product Identification

    2.1 General safety EN 50380 Directives it provides information about the main parameters of the module: Product Type, All AEG PV modules should be installed according to Maximum Power, Current at Maximum Power, Voltage all local and national applicable standards, codes and at Maximum power, Open Circuit Voltage, Short Circuit regulations.
  • Page 4: Installation Safety

    PV output. Do not disconnect modules under load to avoid electrical arcs. AEG STANDARD MODULE INSTALLATION MANUAL GD202104 V1-21...
  • Page 5: Fire Safety

    AS-Mxxx3 20 A AS-Mxxx8 / AS-Pxxx8 20 A AEG PV modules must be installed and stored in the following conditions: AS-Mxxx7-S / 15 A AS-MXXX9 / AS-Pxxx9 Operating temperature From -40°C to +85°C 2.4 Fire safety...
  • Page 6: Bolting

    Do not dismount, drill or modify the frame or any other part of the PV module, as this will void the AEG PV modules can be installed with: warranty. Please contact our Technical Service should •...
  • Page 7: Insertion Systems

    2400 Pa information, and for a compatibility assessment of the *=add in case of extreme environmental conditions insertion system you wish to use, contact the AEG service team (see Section 6 „Contact“). 3.2.4 Loading capacity The PV module‘s load resistance is rated as: Wind load: 2400 Pa / Snow load: 5400 Pa.
  • Page 8: Electrical Installation And Grounding

    National Electrical Codes or applicable National Regulations. 3.3.2 Electrical installation To avoid mismatch, power loss or damage to the PV system, do not use different module types within the same circuit. AEG STANDARD MODULE INSTALLATION MANUAL GD202104 V1-21...
  • Page 9: Grounding

    Connectors are Multi-Contact (MC4) or Multi-Contact grounding of racking system and/or module frames. compatible (MC4-compatible). Cables and connectors AEG PV Modules use an anodic oxidized aluminum must not be removed or cut off. frame; modules should hence be connected to the...
  • Page 10: Maintenance

    Dirt and dust can accumulate on the glass surface of Additional third-party grounding devices: the PV module over time, particularly in installations AEG solar modules can be grounded using third-party with low inclination. This can cause a general decrease grounding devices. It is required that these devices are...
  • Page 11: Disclaimer Of Liability

    6. CONTACT Solar Solutions GmbH Brückenstrasse 94 60594 Frankfurt am Main, Germany www.aeg-industrialsolar.de Mail: service@aeg-industrialsolar.de Tel: +49 (0)69400500810 AEG is a registered trademark used under license from AB Electrolux (publ). AEG STANDARD MODULE INSTALLATION MANUAL GD202104 V1-21...

Table of Contents