hit counter script

Two-Post Rack Installation - Cisco 7201 Quick Start Manual

Cisco 7201: quick start
Table of Contents

Advertisement

Two-Post Rack Installation

Inner clearance (the width between the inner sides of the two posts or rails) must be at least 19 inches (48.26 cm). The
Note
height of the chassis is 1.73 inches (4.39 cm). Airflow through the chassis is from front to back.
Figure 4
Installing the Cisco 7201 Router in a Two-Post Rack
ATM
Cis co 720
1
RJ45 EN
LINK/ ACTV
SFP
RJ45
PA
SLOT 1
GE 0/0
2
Two-post rack
1
Screw hole for the cable-management bracket
2
Make sure that the port adapter lever is in the locked position.
Step 1
Make sure the rack brakes are locked or the rack is stabilized.
Step 2
Position the router so the front is closest to you and lift it carefully into the rack. To prevent injury, avoid any sudden
Step 3
twists or moves.
Slide the chassis into the rack, pushing it back until the brackets meet the mounting strips or posts on both sides of the
Step 4
rack.
Step 5
Keeping the brackets flush against the posts or mounting strips, align the holes in the brackets with the holes on the
rack or mounting strip.
For each bracket, insert and tighten two 10-32 or 12-24 screws to the rack.
Step 6
This completes the procedure for installing the chassis in the rack. Proceed to the
section on page 10
to continue the installation.
8
1
CONS OLE
EN
LINK/ ACTV
LINK/ ACTV
TX
SFP
RX
SFP
LINK/ ACTV
TX
SFP
RX
MNGM NT
USE ONLY
GE 0/1
GE 0/2
ALAR M
GE 0/3
AUX
PWR OK
FE 0/0
0
FE
LINK
STAT US
COM PAC T
FLA SH
CF
ACTV
3
3
Four 10-32 or 12-24 screws
"Chassis Ground Connection Installation"

Advertisement

Table of Contents
loading

Table of Contents