hit counter script
Download Print this page

Safety Recommendations; Included Material - Cisco ONS 15454 Unpacking And Installing

Four-shelf and zero-shelf bay assembly
Hide thumbs Also See for ONS 15454:

Advertisement

Safety Recommendations

Safety Recommendations
The following guidelines will help to ensure your safety and protect the equipment. This list does not
include every potentially hazardous situation.

Included Material

The zero-shelf and four-shelf bay assemblies ship with the following materials:
In addition to the list above the four-shelf bay assembly also ships with the following materials:
Unpacking and Installing the Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assembly
4
Never attempt to lift an object that might be too heavy for you to lift by yourself.
Always disconnect the power source and unplug all power cables before installing or removing the
bay assembly.
Carefully examine your work area for possible hazards such as moist floors, ungrounded power
extension cables, and missing power grounds.
When using equipment such as a forklift or pallet jack to move the bay assembly to another location,
use only moving equipment that is capable of preventing the bay assembly from tipping.
Do not wear loose clothing, jewelry (including rings and chains), or other items that could get caught
in the bay assembly.
Do not work alone if potentially hazardous conditions exist.
TPA fuse
Electrical tape
Anti-oxidant compound
Lacing twine
Tubing
Emery cloth
Tags
Fishe-paper
Floor cutout template
ESD wrist strap
Unpacking and installation documentation
Hex screws
Allen tool
Plastic rear cover
Rear cover support
Right and left fiber channels
Phillips head custom screws
Touch up paint
Quick installation and configuration documentation
78-15720-04

Advertisement

loading