hit counter script
Huawei SUN2000 Series Quick Manual

Huawei SUN2000 Series Quick Manual

Hide thumbs Also See for SUN2000 Series:

Advertisement

Quick Links

SUN2000-(12KTL, 15KTL, 17KTL, 20KTL)-M0
Quick Guide
Issue: 05
Part Number: 31509519
Date: 2019-10-28
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei SUN2000 Series

  • Page 1 SUN2000-(12KTL, 15KTL, 17KTL, 20KTL)-M0 Quick Guide Issue: 05 Part Number: 31509519 Date: 2019-10-28 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2: Product Description

    5. Use insulating tools when installing the device. For personal safety, wear proper personal protective equipment (PPE). 6. Huawei shall not be liable for any consequences caused by the violation of the storage, transportation, installation, and operation regulations specified in this document and the user manual.
  • Page 3: Installing The Equipment

    Installing the Equipment Installation Requirements Tilt and Space Moving an Inverter Dimensions Two M6 screw holes are reserved on both left and right sides of the inverter for installing an awning.
  • Page 4: Installing The Inverter

    Installing the Inverter When drilling holes, avoid the water pipes and power cables buried in the wall. 1. Install the mounting bracket. • M6x60 expansion bolts are delivered with the inverter. If the length and number of the bolts do not meet installation requirements, prepare M6 stainless steel expansion bolts by yourself.
  • Page 5: Installing The Pe Cable

    • Connect cables in accordance with the local installation laws and regulations. • Before connecting cables, ensure that the DC switch on the inverter and all the switches connecting to the inverter are set to OFF. Otherwise, the high voltage of the inverter may result in electric shocks.
  • Page 6: Installing The Ac Output Power Cable

    Installing the AC Output Power Cable • Ensure that the protection layer of the AC output power cable is inside the connector, the core wires are totally inserted into the cable hole, and the cable is connected securely. Failing to do so may cause device malfunction or damage.
  • Page 7 Four-Core Cable (L1, L2, L3, and PE) Click Four-Core Cable (L1, L2, L3, and N) Click Five-Core Cable (L1, L2, L3, N, and PE) Click...
  • Page 8: Installing The Dc Input Power Cable

    2. Connect the AC connector to the AC output port. AC output port (AC) 3. Check the route of the AC output power cable. Installing the DC Input Power Cable 1. Use the Amphenol Helios H4 PV connectors supplied with the inverter. If the PV connectors are lost or damaged, purchase the connectors of the same model.
  • Page 9 Positive connector Positive metal terminal Negative Click connector Negative metal terminal Ensure that the cable cannot be pulled out after being crimped. Ensure that the cables are correctly connected. (The DC voltage of a multimeter should Ensure that the locking nut not be less than 1100 V).
  • Page 10 Smart Dongle port (GPRS/4G/WLAN-FE) 4G Smart Dongle When reinstalling the cover of the Smart Dongle, ensure that the buckle springs back in place. WLAN-FE Smart Dongle (WLAN Communication) Inverter USB port WLAN-FE Smart Dongle (FE Communication) You are advised to use a CAT 5E outdoor shielded network cable (outer diameter < 9 mm; internal resistance ≤...
  • Page 11 There are two types of Smart Dongle involved in this document: • WLAN-FE Smart Dongle: SDongleA-05 • 4G Smart Dongle: SDongleA-03 For details, see the quick guide that is delivered with the Smart Dongle. You can scan the QR code to obtain it.
  • Page 12 In the Smart Dongle networking scenario, the SmartLogger1000A cannot be connected. • The Smart Power Sensor is necessary for export limitation. Only the DTSU666-H Smart Power Sensor (provided by Huawei) can be used. SmartLogger1000A Networking Scenario • In the SmartLogger1000A networking scenario, the Smart Dongle cannot be connected.
  • Page 13 (Optional) Installing the RS485 Communications Cable (Inverter Cascading) 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the communication port. Communications port (COM)
  • Page 14 (Optional) Installing the Smart Power Sensor Signal Cable 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the Communication port. Communications port (COM)
  • Page 15 (Optional) Installing the Grid Scheduling Dry Contact Signal Cable 1. Connect the signal cable to the signal cable connector. 2. Connect the signal cable connector to the Communication port. Communications port (COM)
  • Page 16: Verifying Installation

    Verifying Installation Acceptance Criteria The inverter is installed correctly and securely. Cables are routed properly as required by the customer. The Smart Dongle is installed correctly and securely. Cable ties are evenly distributed and no burr exists. The PE cable is connected correctly, securely, and reliably. The DC switch and all the switches connected to the inverter are set to the OFF position.
  • Page 17 Category Status Meaning Running indicator Steady green Steady green The inverter is operating in grid-tied mode. Blinking The DC is on and the AC is off. green at long intervals Blinking Blinking green Both the DC and AC are on, and the inverter is green at long at long intervals not exporting power to the power grid.
  • Page 18 FusionSolar app as an example to describe the commissioning method. For the SUN2000 app, perform operations as required. • Search for "SUN2000" in Huawei AppGallery, download the latest installation package, and install the SUN2000 app by following the instructions. The SUN2000 app version should be 3.2.00.002 (Android) or later.
  • Page 19 2. (Optional) Installer Account Registration If you have an installer account, skip this step. Creating the first installer account will generate a domain named after the company. To create multiple installer accounts for the same company, log in to the FusionSolar app and tap New User.
  • Page 20 App Quick Guide. You can scan the QR code to obtain it. Scenario 2: SmartLogger1000A Networking Scenario See the Distributed PV Plants Connecting to Huawei Hosting Cloud Quick Guide (Distributed Inverters + SmartLogger1000A + RS485 Networking). You can scan the QR code to obtain it.
  • Page 21 2. Connect to the inverter WLAN. Log in as installer, and perform Quick settings. • The initial password for connecting the inverter WLAN is Changeme • The initial password of the installer is 00000a • Use the initial password upon first power-on and change it immediately after login.
  • Page 22: Customer Service Contact

    Customer Service Contact Region Country Phone Service Support Email France Germany Spain eu_inverter_support@huawei.com 0080033888888 Europe Italy Netherlands Other countries For details, see solar.huawei.com. Australia au_inverter_support@huawei.com 1800046639 Turkey tr_inverter_support@huawei.com 0080021686868 Malaysia /1800220036 Asia (+66) 26542662 (charged by apsupport@huawei.com Pacific local call)
  • Page 23 Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang, Shenzhen 518129, People's Republic of China solar.huawei.com...

Table of Contents