hit counter script

Cisco ASR 907 Hardware Installation Manual page 129

Hide thumbs Also See for ASR 907:
Table of Contents

Advertisement

Installing the Cisco ASR 907 Router
Figure 72: Patch Panel Grounding - Dual
Step 3
Position the patch panel in the rack as follows:
• If the front of the patch panel is at the front of the rack, insert the rear of the chassis between the mounting
posts.
• If the rear of the patch panel is at the front of the rack, insert the front of the chassis between the mounting
posts.
Step 4
Align the mounting holes in the bracket with the mounting holes in the equipment rack.
Cisco ASR 907 Router Hardware Installation Guide
Install Rack Brackets
119

Advertisement

Table of Contents
loading

Table of Contents