Installing the Cisco ASR 920 Series Router
Figure 19: Patch Panel Front iew with Brackets
Figure 20: Patch Panel Rear View with Brackets
Step 3
Secure the brackets to the patch panel with the screws removed when performing Step 3. The recommended
maximum torque is 28 in.-lb (3.16 N-m).
Step 4
Position the cable management guides against the mounting brackets on the patch panel, see the figure below.
Installing the Cisco ASR 920 Series Router
Installing Patch Panel
23