hit counter script
Table of Contents

Advertisement

• 2 rubber spacers
1. Attach the T-rail clips to the T-rail by rotating them and snapping them into place as shown. The black foam
pads should be compressed slightly after installation.
2. Using the dashed lines on the mount cradle template as a guide, set the proper spacing of the T-rail clips on
the T-rail.
3. Tighten the set screws on the T-rail clips to secure the clips using a 5/64"(2 mm) hex key.
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Meraki mr45

Table of Contents