hit counter script

Cisco ASR 1013 Quick Start Manual page 18

Hide thumbs Also See for ASR 1013:
Table of Contents

Advertisement

Figure 10
Cisco ASR 1013 Router DC Power Supply Ground Stud and Cable Installation
1
5
DC power supply grounding stud with wire
1
Grounding screws
2
DC Power supply earth ground symbol
3
Shielded cables must be used to connect to the DB-25 alarm connector on both the AC and DC power supplies in
Note
order to comply with FCC/EN55022/CISPR22 Class A emissions requirements.
Attach the other end of the cable to the site's ground connection.
Step 4
Remove the plastic cover from the terminal block.
Step 5
Before you continue to install the terminal block ground wires, stop and perform Step 6. To prevent any contact
Caution
with metal lead on the ground wire and the plastic cover.
You must wrap the positive and negative lead cables with sleeving. Take each lead wire and cover the area from the lug
Step 6
to the wire with heavy shrink sleeving (see
appropriate grounding point at your site.
18
2
4
4
5
Figure 11
-4 8 /- 6 0 V
4 0 A
T h is u n it
m ig h t h a
v e m o re
th a n o n e
p o w e r s u
p p ly c o n
3
Flat washer
Kepnut screw
, callout #3
). Ground the other end of the grounding wires to an

Advertisement

Table of Contents
loading

Table of Contents