hit counter script

Applying Power And Verifying The Installation - Cisco ASR 5000 Series Installation Manual

Hide thumbs Also See for ASR 5000 Series:
Table of Contents

Advertisement

Chapter 12

Applying Power and Verifying the Installation

This chapter provides information and instructions for understanding the boot process, applying power to the chassis,
and verifying that the installation was successful.
Important:
cards have been physically installed. The system has also been cabled to interoperate with management and traffic
networks.
This chapter includes the following sections:
Understanding the System Boot Process
Applying Power to the Chassis
Verifying the Installation
Completing Initial System Configuration
This chapter assumes that the ASR 5000 chassis, its sub-components, as well as application and line
ASR 5000 Installation Guide ▄
153

Advertisement

Table of Contents
loading

Table of Contents