Power Up and Initial Configuration
• show configuration—Helps verify if you have configured the correct hostname and password.
After you have completed and verified the initial configuration, the specific features and functions are ready
to be configured. See the Cisco ASR 1000 Series Aggregation Services Routers Software Configuration Guide.
Powering Off the Router Safely
Before You Begin
We recommend that before turning off all power to the chassis, you issue the reload command. This ensures
that the operating system cleans up all the file systems.
Procedure
Step 1
Slip on the ESD-preventive wrist strap included in the accessory kit.
Step 2
Enter the reload command.
Step 3
Confirm the reload command:
Router# reload
Proceed with reload? [confirm]
Apr 21 03:42:45.619 EDT: %SYS-5-RELOAD: Reload requested by console. Reload Reason:
Reload Command.Apr 21 03:42:59.920 R0/0: %PMAN-5-EXITACTION: Process manager is
exiting: process exit with reload chassis code
Step 4
After confirming the reload command, wait until the system bootstrap message is displayed before powering
off the system:
System Bootstrap, Version 15.4(2r)S, RELEASE SOFTWARE (fc1)
Copyright (c) 1994-2014
Current image running: Boot ROM0
Last reset cause: LocalSoft
ASR1002-HX platform with 16777216 Kbytes of main memory
rommon 1 >
Step 5
Move the chassis power switch to the Standby position.
Note
Note
Environmental Monitoring and Reporting Functions
Environmental monitoring and reporting functions allow you to maintain normal system operation by identifying
and resolving adverse conditions prior to loss of operation.
by cisco Systems, Inc.
The fans in the power supply modules will continue to run even if the chassis power switch is in the
Standby position.
After powering off the router, wait for a minimum of 30 seconds before powering it on
again.
Cisco ASR 1001-HX Router and Cisco ASR 1002-HX Router Hardware Installation Guide
Powering Off the Router Safely
85