hit counter script

Cisco Nexus 9508 Hardware Installation Manual page 22

Hide thumbs Also See for Nexus 9508:
Table of Contents

Advertisement

Clearance Requirements
4
Air intake from the cold aisle for all modules
and power supplies
5
Air exhaust to the hot aisle for all modules and
power supplies
6
No left side clearance required (no airflow on
left side)
7
Chassis width
8
No right side clearance required (no airflow on
right side)
Cisco Nexus 9508 Switch Site Preparation and Hardware Installation Guide
12
12
Clearance required between the front of the
chassis and the inside of the cabinet (if used) or
the edge of the cold aisle (if no cabinet) for cable
management and ejector handles on I/O modules
13
Front service clearance required for installing
the chassis and replacing the modules on the front
of the chassis
14
Width of the chassis plus vertical mounting
brackets on each side
15
Side clearance required by the front of the chassis
for rotation of I/O module handles (keep this area
clear of rack, cable management, and other
components that can prevent full rotation of the
ejector levers)
Preparing the Site
OL-30837-01

Advertisement

Table of Contents
loading

Table of Contents

Save PDF