Sign In
Upload
Manuals
Brands
ABB Manuals
Touch terminals
REB 551-C3*2.5
ABB REB 551-C3*2.5 Manuals
Manuals and User Guides for ABB REB 551-C3*2.5. We have
1
ABB REB 551-C3*2.5 manual available for free PDF download: Installation And Commissioning Manual
ABB REB 551-C3*2.5 Installation And Commissioning Manual (148 pages)
Breaker protection and control terminal
Brand:
ABB
| Category:
Touch terminals
| Size: 3.2 MB
Table of Contents
Table of Contents
4
Chapter 1 Introduction
10
Introduction to the Installation and Commissioning Manual
11
About the Complete Set of Manuals for a Terminal
11
About the Installation and Commissioning Manual
11
Intended Audience
12
General
12
Requirements
12
Related Documents
13
Revision Notes
13
Acronyms and Abbreviations
13
Chapter 2 Safety Information
22
Warning Signs
23
Caution Signs
25
Note Signs
26
Chapter 3 Overview
28
Commissioning and Installation Overview
29
Chapter 4 Unpacking and Checking the Terminal
30
Receiving, Unpacking and Checking
31
Chapter 5 Installing the Terminal
32
Overview
33
Mounting the Terminal
34
Mounting in a 19-Inch Rack
35
Mounting in a 19-Inch Rack with an Additional Box Type RHGS
36
Mounting in a Flush or Semi-Flush Installation
37
Mounting on a Wall
39
Mounting the Terminal on a Wall
40
Preparing a Wall Mounted Terminal for Electrical Installation
41
Making the Electrical Connections
42
Connecting the CT Circuits
42
Connecting the Auxiliary Power, VT and Signal Connectors
42
Connecting to Protective Earth
44
Making the Screen Connection
44
Installing the Optical Fibres
45
Installing the Serial Communication Cable for RS485 SPA/IEC
46
RS485 Serial Communication Module
46
Informative Excerpt from EIA Standard RS-485
48
Data on RS485 Serial Communication Module Cable
50
Installing the 56/64 Kbit Data Communication Cables
51
Chapter 6 Checking the External Circuitry
54
Overview
55
Checking the CT and VT Circuits
56
Checking the Power Supply
57
Checking the Binary I/O Circuits
58
Binary Input Circuits
58
Binary Output Circuits
58
Chapter 7 Energising the Terminal
60
Overview
61
Energising the Terminal
62
Checking the Self Supervision Signals
64
Reconfiguring the Terminal
64
Setting the Terminal Time
64
Checking the Self Supervision Function
64
Navigating the Menus
64
Self Supervision HMI Data
65
Configuring the 56/64 Kbit Data Communication Modules
66
Calculation of Optical Power Budget
67
Chapter 8 Configuring the 56/64 Kbit Data Communication Modules
67
Fault Tracing
68
Comfail Function
68
Explanation of Contents in Column 2 of Table 42
69
Chapter 9 Setting and Configuring the Terminal
72
Overview
73
Entering Settings through the Local HMI
74
Configuring the Setting Restriction of HMI Function
75
Activating the Restriction of Setting
76
Local HMI
76
Serial Communication, Change of Active Group
76
Serial Communication, Setting
76
Downloading Settings and Configuration from a PC
77
Establishing Front Port Communication
77
Establishing Rear Port Communication
77
Using the SPA/IEC Rear Port
77
Using LON Rear Port
78
Downloading the Configuration and Setting Files
78
Chapter 10 Requirement of Trig Condition for Disturbance Report
80
Requirement of Trig Condition for Disturbance Report
81
Chapter 11 Establishing Connection and Verifying the SPA/IEC-Communication
82
Entering Settings
83
Entering SPA Settings
83
Entering IEC Settings
83
Verifying the Communication
85
Verifying SPA Communication
85
Verifying IEC Communication
85
Optical Budget Calculation for Serial Communication with SPA/IEC
86
Chapter 12 Establishing Connection and Verifying the LON Communication
88
Reference
89
Verification of the Optical Budget
89
Optical Budget Calculation for Serial Communication with LON
89
Chapter 13 Verifying Settings by Secondary Injection
90
Overview
91
Preparing for Test
93
Overview
93
Preparing the Connection to the Test Equipment
93
Setting the Terminal in Test Mode
94
Connecting Test Equipment to the Terminal
94
Verifying the Connection and the Analog Inputs
95
Releasing the Function(S) to be Tested
96
Checking the Disturbance Report Settings
96
Identifying the Function to Test in the Technical Reference Manual
97
Autorecloser (AR)
98
Preparing
99
Checking the AR Functionality
100
Checking the Reclosing Condition
100
Checking the Inhibit Signal
100
Checking the Breaker Not Ready
101
Checking the Closing Onto a Fault
101
Testing the Multi-Breaker Arrangement
101
Completing the Test
101
Breaker Failure Protection (BFP)
102
Verifying the Settings
102
Verifying the Retrip Setting
102
Checking the Retrip Function with Current Check
102
Checking the Retrip Function with Retrip Set to off
102
Checking the Retrip Function Without Current Check
103
Completing the Test
103
Dead Line Detection (DLD)
104
Event Function (EV)
105
Event Recorder (ER)
106
Fuse Failure Supervision (FUSE)
107
Checking that the Binary Inputs and Outputs Operate as Expected
107
Measuring the Operate Value for the Negative Sequence Function
108
Measuring the Operate Value for the Zero Sequence Function
108
Checking the Operation of the Du/Dt, DI/Dt Based Function
109
Completing the Test
110
Supervision of AC Input Quantities (DA)
111
Verifying the Settings
111
Completing the Test
111
Setting Lockout (HMI)
112
Verifying the Settings
112
Completing the Test
112
Four Parameter Setting Groups (GRP)
113
Verifying the Settings
113
Synchrocheck and Energizing Check (SYN)
114
Testing the Phasing Function
116
Testing the Frequency Difference
117
Testing the Synchrocheck
117
Testing the Voltage Difference
118
Testing the Phase Difference
119
Testing the Frequency Difference
122
Testing the Reference Voltage
122
Testing the Energizing Check
123
Testing the Dead Line Live Bus (DLLB)
123
Testing the Dead Bus Live Line (DBLL)
124
Testing both Directions (DLLB or DBLL)
125
Testing the Dead Bus Dead Line (DBDL)
125
Testing the Voltage Selection
126
Testing the Voltage Selection for Single CB Arrangements
126
Testing the Voltage Selection for 1 1/2 Circuit Breaker Diameter
127
Completing the Test
128
Tripping Logic (TR)
129
3Ph Operating Mode
129
1Ph/3Ph Operating Mode
129
1Ph/2Ph/3Ph Operating Mode
130
Completing the Test
131
Chapter 14 Verifying the Internal Configuration
132
Overview
133
Testing the Interaction of the Distance Protection
134
Chapter 15 Testing the Protection System
136
Overview
137
Testing the Interaction of the Distance Protection
138
Chapter 16 Fault Tracing and Repair
140
Fault Tracing
141
Using Information on the Local HMI
141
Using Front-Connected PC or SMS
142
Repair Instruction
144
Repair Support
146
Advertisement
Advertisement
Related Products
ABB REB 551-C4 2.5 Series
ABB REF 545
ABB REM 545
ABB RET 543
ABB REM 543
ABB REF 54 Series
ABB RET 54 Series
ABB REM 54
ABB RE 54
ABB REL 551-C1 2.3 Series
ABB Categories
Industrial Equipment
Controller
Measuring Instruments
Battery Charger
DC Drives
More ABB Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL