hit counter script

Replace The Power Supply; Captive Installation Screws; Caution; Step 1 Power Down The Router - Cisco 7200 VXR Quick Start Manual

Cisco 7200 vxr routers
Hide thumbs Also See for 7200 VXR:
Table of Contents

Advertisement

Replace the Power Supply

Figure 27
Replacing the Power Supply
2
4
1
1
Power switch
2
PWR OK LED
3
AC/DC power input connection

Caution

Do not mix power supplies in Cisco 7200 VXR routers. In dual power supply configurations, both power supplies
must be of the same type (two AC-input power supplies or two DC-input power supplies).
Caution
To ensure adequate airflow across the router power supplies, a power supply or a power supply filler plate must be
installed in each power supply bay. Figure 18 shows a Cisco 7206VXR with an installed power supply filler plate.
Caution
The DC return connection to this system is to remain isolated from the system frame and chassis (DC-I).

Step 1

Power down the router.
Step 2
Disconnect the router from the power source (3).
Step 3
Unscrew the captive installation screws (4).
Step 4
Grasp the handle (5) and pull the power supply out of the chassis.
Step 5
Insert a new power supply of the same type that you removed and tighten the captive installation screws.
Step 6
Connect the power supply to the power source and power up the router.
Note
When powering off the router, wait 30 seconds before powering it on again.
3
5
2
4
1
4

Captive installation screws

5
Handle
3
5
44

Advertisement

Table of Contents
loading

Table of Contents