hit counter script

Replace The I/O Controller - Cisco 7200 VXR Quick Start Manual

Cisco 7200 vxr routers
Hide thumbs Also See for 7200 VXR:
Table of Contents

Advertisement

Note
If you have difficulty installing a processing engine or I/O controller in the lowest slot of a Cisco 7200 VXR
router that is rack-mounted, remove the port adapters, processing engine and I/O controller from the chassis
and reinstall them. Install the processing engine and I/O controller in the lowest slots first, then populate the
slots above them, in a bottom-to-top order.
Step 5
Grasp the handle and pull the NPE or NSE from the chassis.
Step 6
Insert the NPE or NSE and tighten the captive installation screws.
Step 7
If you are replacing an NPE-G1, install the cable-management brackets and cables. See Figure 6 and Figure 9.
Step 8
Connect the router to the power source and power up the router.
See the Network Processing Engine or Network Services Engine Installation and Configuration publication at
http://www.cisco.com/en/US/products/hw/routers/ps341/products_installation_guide_book09186a0080551c34.html.

Replace the I/O Controller

Figure 19
Replacing the I/O Controller
Cisco 7200
Series
2
1
I/O controller
Note
Before powering down the router, use the copy running-config tftp command to save the router's running configuration
to a TFTP file server.
Step 1
Power off the router.
Step 2
Disconnect the router from the power source.
Step 3
Remove any I/O controller cables.
Step 4
On the I/O controller (1), unscrew the captive installation screws (2), grasp the handle, and pull the I/O controller from
the chassis.
ETHERNET 10BT
1
TOKEN RING
ETHERNET-10BFL
FAST ETHERNET INPUT/OUTPUT CONTROLLER
2
2
Captive installation screws
37

Advertisement

Table of Contents
loading

Table of Contents