hit counter script
Download Print this page
Siemens ER326AB90L Assembly Instructions Manual

Siemens ER326AB90L Assembly Instructions Manual

Hide thumbs Also See for ER326AB90L:

Advertisement

Quick Links

en
hz
西門子石油氣爐 安裝指引 請保留此指引
型號: 單頭: ER326AB90L , 雙頭: ER326BB90L
1
.
-
.
~
43 53
~44
~62

Advertisement

loading

Summary of Contents for Siemens ER326AB90L

  • Page 1 西門子石油氣爐 安裝指引 請保留此指引 型號: 單頭: ER326AB90L , 雙頭: ER326BB90L 43 53...
  • Page 5 10 a "Z" mbar Qn (kW) m3/h Qr (kW) (mm) 2,80 0,60 2,80 0,60 1,90 0,40 1,90 0,40 0,30 11 5 0,30 G30/29 G31/37 G30/29 G31/37...
  • Page 6: Safety Instructions

    An oven must have a power cooling fan The manufacturer is not liable for any to install a hob above it. connection leaking, after being handled. Electric connection (fig. 5) Check the oven's dimensions in its Read the appliance's instructions before installation manual.
  • Page 7: Adjustment Of The Taps

    - Loosen the clamp screw to release the 爐具旁邊的器具必須用非易 bushing by moving it backwards to 燃物材料製成。分層蓋及粘接膠 access the main nozzle easily. Fig. a1. - Remove the outer flame nozzle by 水必須防熱。 安裝和使用前請細閱爐具說 turning it towards the left. Fig. a2-a3. 明書。 - Screw in the new outer flame nozzle.
  • Page 8 供氣接駁(圖 4) 更換噴嘴 (圖 9b): 更換供氣種類 - 從有螺紋的M2部分鬆開M3部 注意: 涉及安裝、調校氣體 若國家的規例許可,本爐具 分的螺絲。操作時按相反方向固 等之所有操作,必須由獲註冊氣 可接至其他種類的供氣(見規範 定有螺紋的部件。 體承辦商所雇用之註冊氣體安裝 銘牌)。所需組件在本公司技術 - 從M2部分拆除管子,見圖 b2。 技工遵照供氣及供電商之適用規 支援服務部所提供的更換包內 例、 標準和規範進行 。 並使用“機 - 從M1部分拆開M2部分總成, 見 (因型號而異)。應采取以下步 圖b3-b4。 電工程署批准EMSD Approval 驟: GTXXXX” 字樣) 之膠喉及供應 - 從M2部分拆除內火圈噴嘴M4, A) 更換爐架上的快速、 半快速及 管道式石油氣使用的溢流掣或瓶...

This manual is also suitable for:

Er326bb90l