hit counter script

Design Information; Models Available; Product Dimensions And Clearances; Tools Required - GE Built-In Compactors GCG1500 BB Installation Instructions Manual

15” built-in compactors
Hide thumbs Also See for Built-In Compactors GCG1500 BB:
Table of Contents

Advertisement

Available languages

Available languages

MODELS AVAILABLE

GCG1580 SS
GCG1500 BB
GCG1500 WW
GCG1700 II*
ZCGS150 SS
ZCGP150 II*

PRODUCT DIMENSIONS AND CLEARANCES

24" (61 cm)
15-1/8"
min
(38.4 cm)
min
Locate the outlet 18" (45.7 cm) min
from the floor, 3" (7.6 cm) min from
either side

TOOLS REQUIRED

• Level
• Phillips Screwdriver
• Pliers
• Gloves
• Measuring Tape

Design Information

34" (86.4 cm)
to
35" (88.9 cm)
23" (58.4 cm)
*For ZCGP150 II and GCG1700 II, also refer
to the instructions provided on the template
packed with those models.
33-3/4"
(85.8 cm)
min.
to
35" (88.9 cm)
max.
14-7/8" (37.8 cm)

PARTS SUPPLIED

• 6 mounting screws (located in the literature package)
• 2 countertop retaining brackets
• 2 side mounting clips
3
• Allow 23" (58.4 cm)
clearance at the front for
a full drawer opening.
• Allow 6" (15.2 cm)
clearance on the right
side to the nearest
vertical wall or cabinet
for bag removal.
• Note: This compactor is
designed for built-in
applications only.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF