3. INSTALLATION
3-2. Installing the control box
Operator
3-3. Installing the oil pan
4
BAS-300G-484, BAS-300G-484 SF
Remove the eight screws (1), and then
remove the control box cover (2).
(3) Control box
(4) Bolts [4 pcs.]
(5) Plain washers [4 pcs.]
(6) Spring washers [4 pcs.]
(7) Nuts [8 pcs.]
1840B
(8) Power switch
(9) Wood screws [2 pcs.]
(10) Staples [4 pcs.]
1841B
(1) Oil pan
(2) Nails [7 pcs.]
(3) Rubber cushions [4 pcs.]
(4) Waste oil tank
2142B