hit counter script

Installing The Control Box; Installing The Air Unit And The Valve Assembly - Brother RH-9800 Instruction Manual

Electronic eyelet button holer
Hide thumbs Also See for RH-9800:
Table of Contents

Advertisement

3-7. Installing the control box

3-8. Installing the air unit and the valve assembly

Refer to the work table processing diagram on page 3 for the installation position.
12-pin connector
No.6 (black)
Black cable
No.4 (black)
Black cable
12-pin connector
1. Install the air unit (1) to the underside of the work table with the two screws (2).
2. Install the valve assembly (3) with the two screws (4).
3. Connect air hose No. 15 to the intermediate joint (5) of the air unit (1) and to the joint (6) of the valve assembly (3), and
connect air hose No. 16 to joints (7) and (8).
Connecting the knife valve cables
Connect the two black knife valve cables to terminal No.4 and No.6 of the 12-pin connector of the air harness.
(5)
(2)
(3)
(4)
(1)
1102Q
(6)
(3)
(8)
(7)
No. 15
RH-9800
1. Align the four bolt holes in the control box (1) with the
four holes in the work table.
2. Install the control box (1) with the four bolts (2), spring
washers (3) and flat washers (4)
3. Push the four caps (5) in over the top of the bolts (2).
(4)
(2)
No. 16
3.INSTALLATION
(5)
(1)
1103Q
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dh4-b980

Table of Contents

Save PDF