Preparing for Installation
This chapter describes the general equipment, safety, and site preparation requirements for installing the
VPN Acceleration Module 2+ (SA-VAM2+). This chapter includes the following sections:
•
•
•
•
•
Required Tools and Equipment
You need the following tools and parts to install a SA-VAM2+. If you need additional equipment, contact
a service representative for ordering information.
•
•
•
•
•
•
•
Hardware and Software Requirements
This section describes the minimum software and hardware requirements for the SA-VAM2+:
•
•
•
OL-5979-03
Required Tools and Equipment, page 2-1
Hardware and Software Requirements, page 2-1
Restrictions, page 2-3
Safety Guidelines, page 2-3
Compliance with U.S. Export Laws and Regulations Regarding Encryption, page 2-5
SA-VAM2+
Number 2 Phillips screwdriver
Your own electrostatic discharge (ESD)-prevention equipment or the disposable grounding wrist
strap included with all upgrade kits, field-replaceable units (FRUs), and spares
Antistatic mat
Antistatic container
Grounding wrist strap
(Optional) Port Adapter Jacket Card for installation of a port adapter in the I/O controller slot of
Cisco 7200VXR routers with an NPE-G1 or NPE-G2 processor
Software Requirements, page 2-2
Hardware Requirements, page 2-2
Restrictions, page 2-3
C H A P T E R
VPN Acceleration Module 2+ (VAM2+) Installation and Configuration Guide
2
2-1