hit counter script

Cisco WS-C1924-A - Catalyst 1900 24 Ports 10MB Switch Hardware Installation Manual page 58

1900 series integrated services router
Table of Contents

Advertisement

Installing the Chassis Ground Connection
To install the ground connection for a Cisco 1900 series router, follow these steps.
Procedure
Step 1
Strip one end of the ground wire to expose approximately 0.75 in. (20 mm) of conductor.
Crimp the 14 AWG green ground wire to a UL Listed/CSA certified ring terminal that is suitably sized
Step 2
for the number 6 ground screw provided on the rear panel of the router. The crimping tool should be one
that is recommended by the ring lug terminal manufacturer.
Step 3
Attach the ring terminal to the chassis. The attachment points are shown in
Use a number 2 Phillips screwdriver and the screw supplied with the ground lug. Tighten the screw to a
torque of 8 to 10 in-lb. (0.9 to 1.1 N-m).
Figure 4-10
Figure 4-11
Cisco 1900 Series Hardware Installation
4-10
Chassis Ground Connection on the Cisco 1905 and Cisco 1921 Routers
AU X
S
GE 0/1
L
PO E
BA U D
CO NS OL
E
S
GE 0/0
R ES ET
L
48 VD C
1. 67 A
Chassis Ground Connection on the Cisco 1941 Router
S
G
E
0
/
0
EN
EN
1
US B
CO NS OL
E
0
GE 0/ 1
C is c o 1
9 0 5
10 0- 24 0
V~ 50 -6
0 H z 1A
L
Chapter 4
Installing and Connecting the Router
Figure 4-10
and
Figure
4-11.
OL-19084-02

Advertisement

Table of Contents
loading

Table of Contents