hit counter script

Installing The Weight Transfer Kit - Toro 30568 Operator's Manual

52 rear discharge mower
Table of Contents

Advertisement

3
4
Figure 8
1. PTO shaft
2. Bolts and locknuts
4. Lower the carrier frame and install 4 clevis pins through
the desired height-of-cut bracket holes and frame
brackets. Secure all 4 pins with hairpin cotters (Fig. 9).
2
1
4
3
5
6
Figure 9
1. 1 in. (25 mm)
2. 1-1/2 in. (38 mm)
3. 2 in. (51 mm)
Installing the Weight Transfer
Kit
1. Fully raise the cutting deck, set the parking brake, rotate
the ignition key to Off, and remove the ignition key.
2. Move the lift lock lever to the lock position.
Note: Lift lock lever is located on the right front corner of
the seat frame.
1
2
3. Gear case shaft
4. Roll pin
2
1
4
3
6
5
4. 2-1/2 in. (64 mm)
5. 3 in. (76 mm)
6. 3-1/2 in. (89 mm)
11
3. Place blocks under the cutting deck to prevent it from
falling during assembly.
Note: The mounting brackets for the weight transfer kit
must be installed in different locations depending on the
cutting deck. Refer to Figure 10 for mounting location.
3
2
Figure 10
1. 52 side discharge deck
2. 52 deck w/bagger
4. To install the mounting brackets, insert 2 flange head
capscrews (3/8 x 1 in.) through the slotted bracket
holes. Thread the screws into the captivated frame nuts
and torque them to 45–50 ft.-lb. (61–68 N m) (Fig. 11).
2
1
Figure 11
1. Flange head capscrew
2. Slotted hole
5. Thread the top extension spring coil into the top spring
end holes and the bottom extension spring coil into the
bottom spring end holes (Fig. 12).
1
4
3
3. 62 and 72 decks
4. 52 rear discharge deck
3
3. Frame

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 200 series

Table of Contents