Huawei PDU8000 Quick Installation Manual
Huawei PDU8000 Quick Installation Manual

Huawei PDU8000 Quick Installation Manual

Transformer power distribution cabinet-t
Hide thumbs Also See for PDU8000:

Advertisement

Quick Links

NOTE / 说明
1. Power cables routed inside the cabinet need to be secured using cable ties.
各电源线缆在柜内走线时,需要用扎带绑扎。
2. The following table lists the colors of the power cables for your reference. The local cable color standards prevail.
各电源线缆对应的颜色如下表所示。图中线缆颜色仅供参考,请以当地电源线缆标准为准。
Color / 颜色
Connection / 接线说明
Yellow / 黄色
To L1 / 接L1
Green / 绿色
To L2 / 接L2
Red / 红色
To L3 / 接L3
Yellow and green / 黄绿色
To PE copper bar (ground cable) / 接PE排(地线)
Blue / 蓝色
To N copper bar / 接N排
Red / 红色
To BAT+ / 接电池正
Black / 黑色
To BAT- / 接电池负
Connecting signal cables / 信号线接线
NOTE / 说明
For the definitions of wiring terminal blocks from the RS485 port to the management system, see the Schematic
Diagram delivered with the product.
RS485接口至管理系统的接线端子排定义参见随机附带的原理图。
Checking After Installation / 安装后检查
After the installation is completed, verify the items in the following tables before power-on.
安装完成后,在上电前,请根据下表内容进行检查。检查合格后方可进行上电操作。
Electrical connection checklist / 电气连接检查
No. /
Check That / 检查项
编号
All cables are correctly connected based on the Schematic Diagram.
1
参考原理图,检查所有接线是否正确。
Ground cables are securely connected.
2
检查地线是否已连接牢靠。
Redundant parts of the ground cables and power cables are cut off instead of coiled.
3
电源线、地线的余长应被剪除,不能盘绕。
Phase cables are connected properly.
4
各相位连线正确。
Power cables and ground cables are routed and bundled separately from other types of cables.
5
电源线、地线在布放时应与其他电缆分开绑扎。
All circuit breakers are OFF.
6
所有空开处于"OFF"状态。
Hardware installation checklist / 硬件安装检查
No. /
Check That / 检查项
编号
The cabinet is clean, without dust or sundries.
1
机柜清洁干净,无灰尘、污物,柜内无杂物。
The paint on the cabinet exterior is intact. If paint flakes off, repaint that area immediately to avoid corrosion.
2
外部漆饰应完好,如有掉漆,立即补漆,以防止腐蚀。
The cabinet door and lock work properly.
3
柜门开闭灵活,门锁正常。
All labels are correct, clear, and complete.
4
各种安全警告标识正确、清晰、齐全。
The surrounding area of the cabinet contains no waste tape, cable ties, paper, or packing materials.
5
机柜周围不得有胶带、扎带线头、纸屑和包装袋等施工遗留物。
5
5
Cable installation checklist / 线缆安装检查
No. /
Check That / 检查项
编号
All bolts are tightened, especially the bolts used for electrical connection. Flat washers and spring washers are
1
installed properly in the correct sequence.
所有螺栓都要拧紧(尤其要注意电气连接部分),平垫、弹垫要齐全,且不能装反。
Cables are bundled neatly, and cable ties are secured evenly and properly in the same direction.
2
电缆绑扎应整齐美观,线扣间距均匀,松紧适度,朝向一致。
Cables are routed for ease of future maintenance and expansion.
3
电缆布放应便于维护和将来扩容。
There is no unnecessary adhesive tape or cable tie on the cables.
4
线缆上无多余胶带、扎带等遗留。
Exposed parts near the wiring terminals and lugs are wrapped in PVC insulation tape or heat shrinking tubing.
5
接线端子处的裸线及线鼻柄应用绝缘胶带缠紧,或套热缩套管,不得外露。
The power and signal cables are routed in accordance with the weak- and strong-current cable routing
6
specifications and the cable routing plan.
电源线走线和监控线走线满足强弱电走线要求,符合系统走线规划。
Powering On and Commissioning / 上电调测
Switch on the upper-level circuit breaker and the input circuit breaker to power on the cabinet. The indicators turn on.
合上前级电源空开和配电柜输入空开使机柜通电,机柜电源指示灯点亮。
Switch on SPD circuit breakers and the input circuit breakers.
闭合防雷空开,合上输入空开。
Check that parameters displayed on the PDC LCD are normal. Then switch on all output circuit breakers in sequence
and check that the voltage of each output branch is normal by using a multimeter.
检查配电柜显示屏显示是否正常。若正常,逐一合上所有输出空开,用万用表检查输出支路电压是否正常。
After the check, switch off all circuit breakers in sequence, and disconnect the power supply.
确认参数正常后,依次断开所有空开,再断开电源。
This guide is for reference only. The actual product prevails.
本指南仅供参考,内容如有改动,请以实物为准。
HUAWEI TECHNOLOGIES CO., LTD.
Huawei Industrial Base Bantian Longgang
6
PDU8000 Transformer Power Distribution Cabinet-T
Quick Installation Guide
PDU8000 变压器配电柜-T
快速安装指南
Issue: 01
文档版本:01
PDC Code:02403787
配电柜编码:02403787
Date: 2017-03-31
发布日期:2017-03-31
Precautions / 安全注意事项
Safety Precautions / 遵守所有安全注意事项
To ensure safety of humans and the equipment, pay attention to the safety symbols on the equipment and all the safety
instructions in this document. The "NOTE", "CAUTION", and "WARNING" marks in this document do not represent all
the safety instructions. They are only supplements to the safety instructions. When operating Huawei equipment, in
addition to following the general precautions in this document, follow the specific safety instructions given by Huawei.
Huawei will not be liable for any consequences that are caused by the violation of safety regulations and design,
production, and usage standards.
为保障人身和设备安全,在安装、操作、维护设备时,请遵循设备上标识及手册中说明的所有安全注意事项。手册中的
"安全警告"、"注意"、"说明"事项,并不代表所应遵守的所有安全事项,只作为所有安全注意事项的补充。在进行
本公司产品、设备的各项操作时,必须严格遵守由华为公司提供的相关设备注意事项和特殊安全指示。手册中列出的"安
全警告"仅代表了华为公司知道的部分,华为公司不承担任何因违反通用安全操作要求或违反设计、生产和使用设备安全
标准而造成损失的责任。
Local Safety Regulations / 遵守当地法规和规范
When operating the equipment, you must follow the local laws and regulations.
操作设备时,应遵守当地法规和规范。
Personnel Requirements / 人员要求
Only trained and qualified personnel are allowed to install, operate, and maintain Huawei equipment.
负责安装维护华为设备的人员,必须先经严格培训,掌握正确的操作方法及安全注意事项后,方可安装、操作和维护设备。
Before installation, get familiar with the following documents:
安装开始前,确保已经学习并掌握了除本文档以外的以下文档信息:
Parts documents / 随货的其它部件资料
Human Safety / 人身安全
To ensure human safety, connect the ground cable first when connecting cables.
配电柜接线时,需按照本指南指导的接线顺序,首先安装地线以确保人身安全。
Only trained and qualified personnel are allowed to install, operate, and maintain Huawei equipment, and they must
understand basic safety precautions to avoid hazards.
系统接线的操作人员必须具备基本的安全操作知识,需经过培训,掌握正确的操作方法,并具有相应作业资格。
To prevent electric shocks, get tools insulated and wear electrostatic discharge (ESD) gloves when connecting cables.
进行接线操作时,操作人员需对工具进行绝缘处理,佩戴绝缘手套,避免触电。
After the installation and commissioning, do not open the rear door or side panel. Otherwise, electric shocks may occur.
安装调测完成后,请勿擅自打开后门和侧板,否则会有触电的危险。
Model Description / 设备型号说明
The following figure shows the model naming conventions for a transformer PDC.
变压器配电柜的设备型号说明如下所示:
PDU8000–XXXX AC XX TC XXXX
Shenzhen 518129
People's Republic of China
www.huawei.com
华为技术有限公司
深圳市龙岗区坂田华为总部办公楼
邮编:518129
www.huawei.com
4008302118
Copyright © Huawei Technologies Co., Ltd. 2017. All rights reserved
.
版权所有 © 华为技术有限公司2017。保留一切权利。
Serial number / 流水码
Transformer power distribution cabinet / 变压器配电柜
V4: Rated 380 V to 415 V / V4: 额定380V~415V
V5: Rated 480 V / V5: 额定480V
V7: Rated 200 V to 220 V / V7: 额定200V~220V
AC power supply / 交流电
Power distribution capacity / 配电容量
Power distribution cabinet / 配电柜
Data center power distribution product / 数据中心配电产品
1

Advertisement

loading

Summary of Contents for Huawei PDU8000

  • Page 1 Huawei. Huawei will not be liable for any consequences that are caused by the violation of safety regulations and design, production, and usage standards.
  • Page 2 If components or fittings are damaged during transportation or NOTE / 说明 Phillips/Flat-head do not comply with the order contract, make records onsite and contact the local Huawei regional office or Hammer drill Adjustable wrench...