Chapter 2
Replacing Cards in the Cisco 3230 ISR Rugged Enclosure
Inserting the Card Stack into the Extrusion
Step 1
Step 2
Step 3
Step 4
OL-15983-01
Get user manuals:
See SafeManuals.com
To insert the card stack into the extrusion, follow these steps:
Make sure that the LED cable is connected to the FESMIC.
Route the FESMIC LED cable over the top of the stack.
Align each card's Wedge Loks so that the angles on the Wedge Loks match the angle of the Wedge Lok
rail.
Figure 2-9
shows proper Wedge Lok alignment.
Figure 2-9
Wedge Lok Alignment
1
Wedge Lok alignment
Place the extrusion on a sturdy, flat surface with the I/O end cap side facing up.
1
2
1
2
Wedge Lok rail
Cisco 3200 Series Router Hardware Upgrade Guide
Card Replacement Process
2-11