hit counter script

Installing The Chassis Installation Handles - Cisco RF Gateway 10 Quick Start Manual

Cisco systems rf gateway quick start guide
Hide thumbs Also See for RF Gateway 10:
Table of Contents

Advertisement

Figure 3
Chassis Installation Bracket
Chassis
installation
bracket
After the chassis is installed and secured to the rack, the chassis installation brackets can be removed from the rack.
Note
The brackets are not needed for supporting the chassis when all the rack-mount screws are installed.

Installing the Chassis Installation Handles

This section explains how to attach the chassis installation handles to the chassis.
Before installing the chassis in the rack, it is recommended that you install a chassis lifting handle to each side of the chassis to
aid in lifting the chassis onto the rack.
It is recommended to install the two side chassis installation handles while unpacking to aid in moving the chassis off
Note
the palette.
Chassis installation handles should not be installed if the chassis is to be mid mounted.
Note
To install the chassis installation handles on a Cisco RFGW-10 UEQAM, complete the following steps:
Locate the two M5 threaded holes on the upper center of each side of the chassis that align with the handle captive
Step 1
screws.
Install the two chassis installation handles on either side of the chassis and tighten the captive screws.
Step 2
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rfgw-10

Table of Contents

Save PDF