Installation Guidelines
Installation Guidelines
When determining where to install the device, verify that these guidelines are met:
• Clearance to the device's front and rear panel meets these conditions:
• Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent lighting
• Make sure that power supply modules are securely inserted into the chassis before moving the switch.
• Airflow around the switch and through the vents is unrestricted.
• Temperature around the unit does not exceed 104°F (40°C). If the switch is installed in a closed or
• Humidity around the switch does not exceed 90 percent.
• Altitude at the installation site is not greater than 5,000 feet (1524 meters).
• For 10/100/1000 fixed ports, the cable length from the Cisco Catalyst PON Series ONT to a connected
• Cooling mechanisms, such as fans and blowers in the device, can draw dust and other particles causing
Installing an OLT
The following sections provide information about the various tasks that comprise the Cisco Catalyst PON
Series OLT installation.
Mounting the OLT on a Table or Shelf
Procedure
Step 1
Locate the adhesive strip with the rubber feet in the mounting-kit envelope.
Step 2
Attach the four rubber feet to the four circular etches on the bottom of the OLT.
Step 3
Place the OLT on a table or shelf near an AC power source.
Cisco Catalyst PON Series Switches Hardware Installation Guide
22
• Front-panel LEDs can be easily read.
• Access to ports is sufficient for unrestricted cabling.
• AC power cord can reach from the AC power outlet to the connector on the device rear panel.
fixtures. Make sure that the cabling is safely away from other devices that might damage the cables.
multirack assembly, the temperature around it might be greater than normal room temperature.
device cannot exceed 328 feet (100 meters).
contaminant buildup inside the device, which might result in system malfunction. You must install this
equipment in an environment as free from dust and foreign conductive material (such as metal flakes
from construction activities) as is possible.
Installation