hit counter script

Cisco N540-FH-CSR-SYS Install Manual page 30

Hide thumbs Also See for N540-FH-CSR-SYS:
Table of Contents

Advertisement

Install the AC Power Cables
Figure 32: Ground Lug
2. Attach one end of the shelf ground cable (#6 AWG cable) to the ground point on the rear of the chassis
using the specified dual-hole lug connector.
Install the AC Power Cables
Refer Chapter 6: Replace Power Supply for more information about AC power cables installation.
To install the AC power cables in the power supply slots:
1. Plug the power supply cord in the power supply module.
2. Insert the power supply cord into the tie [1, 3] and tighten the tie around the power supply cord as shown
in [2, 4] in the figure below.
Install the Device
30
• Use a wire-stripping tool to remove approximately 0.75 inches (19 mm) of the covering from the
end of the grounding cable.
• Insert the stripped end of the grounding cable into the open end of the grounding lug.
• Use the crimping tool to secure the grounding cable in the grounding lug.
• Remove the adhesive label from the grounding pad on the chassis.
• Place the grounding lug against the grounding pad so that there is solid metal-to-metal contact, and
insert the two M4 screws with washers through the holes in the grounding lug and into the grounding
pad.
• Ensure that the lug and cable do not interfere with other equipment.
• Prepare the other end of the grounding cable and connect it to an appropriate grounding point in your
site to ensure adequate earth ground.
Install the Device

Advertisement

Table of Contents
loading

This manual is also suitable for:

N540

Table of Contents