Installing
3.1
Procedure for installing the frequency inverter
Preconditions for installation
Check that the following preconditions are fulfilled before installing:
● Are the required components, tools and small parts available?
● Are the ambient conditions permissible? See Technical data (Page 263).
Installation sequence
You will find details on the installation in the Internet: Hardware Installation Manual
(http://support.automation.siemens.com/WW/view/en/30563173/133300).
You can start to commission the converter once installation has been completed.
Inverter with CU240B-2 and CU240E-2 Control Units
Operating Instructions, 01/2011, FW 4.4, A5E02299792B AB
①
Installing reactors and filters (Page 28)
②
Installing the Power Module (Page 30)
③
Installing Control Unit (Page 42)
3
27