hit counter script

Installing The Chassis In A Four-Post Rack - Cisco Nexus 9336PQ Hardware Installation Manual

Aci-mode switch
Hide thumbs Also See for Nexus 9336PQ:
Table of Contents

Advertisement

Installing the Chassis
Before you begin
• You must have the following tools and equipment:
Step 1
Align the two holes in one side of one of two front-mount brackets to two holes on the left or right side of the chassis
(see the following figure).
Be sure that the other side of the bracket is facing toward the front (port end) of the chassis.
1
Front-mount bracket with two screw holes aligned to
two screw holes in the chassis and one screw hole
facing the front (port side) of the chassis.
Step 2
Use two M4 x 6 mm screws to attach the bracket to the chassis. Tighten each screw to 11 to 15 in-lb (1.2 to 1.7 N·m).
Step 3
Repeat Steps 1 and 2 to attach the second center-mount bracket to the other side of the chassis.
What to do next
You are ready to mount the chassis to the four-post rack.

Installing the Chassis in a Four-Post Rack

You need to slide the chassis onto the bottom-support rails so that the power supply end locks onto the chassis
stops at the end of the rails and so that the front-mount brackets on the chassis come into contact with the
front-mount rails on the rack.
Warning
Statement 1074 Comply with Local and National Electrical Codes
To reduce risk of electric shock or fire, installation of the equipment must comply with local and national
electrical codes.
• Manual Phillips-head torque screwdriver
• Front-mount brackets (2) and screws (4) (found inside the switch accessory kit)
2
Two M4 x 6 mm screws used to fasten the bracket to
the chassis.
Cisco Nexus 9336PQ ACI-Mode Switch Hardware Installation Guide
Installing the Chassis in a Four-Post Rack
19

Advertisement

Table of Contents
loading

Table of Contents