Huawei FusionDC1000A Quick Manual
Huawei FusionDC1000A Quick Manual

Huawei FusionDC1000A Quick Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionDC1000A:

Advertisement

Quick Links

FusionDC1000A Prefabricated All-in-One Data
Center
Quick Guide (2021, France,
Eutelsat)
Issue
01
Date
2021-04-30
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

loading

Summary of Contents for Huawei FusionDC1000A

  • Page 1 FusionDC1000A Prefabricated All-in-One Data Center Quick Guide (2021, France, Eutelsat) Issue Date 2021-04-30 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 4 Change History Changes between document issues are cumulative. The latest document issue contains all the changes made in earlier issues. Issue 01 (2021-04-30) This issue is the first official release. Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 5: Table Of Contents

    2 Installation Guide........................3 2.1 Lowering a Fan (Applicable To Downflow Units)......................3 3 Installation Drawings......................6 4 Removing Transport Protection Materials................ 7 5 Initial Configuration Parameters..................8 A Common Torque Selection Table..................9 Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 6: Quick Guide Usage

    This chapter describes the notes for using the quick guide. ● Before the installation, check whether the materials are intact according to the packing list. If there is any problem, contact Huawei technical support. ● This document provides only the initial configuration parameters required for data center commissioning and O&M as well as the drawings and parameters...
  • Page 7 Table 1-1 Reference Documentation Item Document Name UPS5000-E-(350 kVA-800 kVA) User Manual (50 kVA Power Modules) Smart NetCol8000-A(045, 055, 060, 090, 120) In-room Air Cooled Smart cooling Cooling Product User Manual product Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 8: Installation Guide

    Procedure Step 1 Remove two beams. Figure 2-1 Removing beams Step 2 Rotate the fan upward by 30 degrees, and pull the rotating shaft of the fan to the outermost side. Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 9 Exercise caution when handling the fan to avoid body injury. Figure 2-3 Turning a fan to 90 degrees Step 4 After the fan rotates to 150 degrees, push the fan back to the horizontal position. Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 10 Step 5 Use a torque wrench to secure the two beams, and interconnect the fan cables using the interconnection terminal reserved in the cabinet. Figure 2-5 Securing the fan beams ----End Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 11: Installation Drawings

    FusionDC1000A Prefabricated All-in-One Data Center Quick Guide (2021, France, Eutelsat) 3 Installation Drawings Installation Drawings Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 12 Checklist of Devices Installed Onsite Installation Sequence Subcategory Item Diagram ID Diagram Name Removing the Sealing Plates at the Bottom of Pre-fab. Pe-fab. Module Bottom Sealing Plate NO.S001 Modules Removal Position Diagram Determining the Pre-fab. Module Installation Position Installing Pre-fab. Modules (Concrete Platform Solution) Installing Pre-fab.
  • Page 13 No.S001 Container Bottom Sealing Plate Removal Position Diagram Removing eight tapping screws from the sealing plate Procedure: Use a Phillips screwdriver to remove the tapping screws (GB15856_1-2002_ST4_8X16) from the bottom sealing plates of the container (internal and external) in sequence, and then remove the sealing plates. Note: There are 4 places outside the container and 1 place inside the container.
  • Page 14 No.S002 Pre-fab. Module Instalation Position Diagram cement pier Enlarged at 10:1 2 mm leveling washer 5 mm leveling washer L-shaped part 2899 2997 2997 2899 Note: 1. The total weight of a single container is about 20,000 kg. The strength of the concrete Enlarged at 10:1 support podium must meet the requirements of stacking two layers (the contact area of a single support point is about 150 cm...
  • Page 15 No.S003 Pre-fab. Module Grounding Position Diagram 1374 A part Enlarged at 10:1 Bolt assembly M12X30 Container ground point Note: Four external ground points are set for each container and are set at the bottom of the rear wall. You can select a ground point based on the site requirements and connect the ground point to the ground grid.
  • Page 16 No.S007 Awning Installation Position Diagram Container Fireproof door eave eave 1 PCS at the front and 1 PCS at the rear of each container DKBA61562694 Rain and snow cover DKBA68688294 Container eave Drawing No./Code Item Remarks...
  • Page 17 No.S004 Pre-fab. Module Pipe Installation Position Diagram Cross-sectional view of air conditioner outdoor pipes and cables Winding tape Outdoor unit signal cable Liquid A/Ccooling copper pipe pipe - liquid pipe Signal cable for the electric heater controller Power probe of water supply and drainage Signal cable cable A/C water refill pipe (PPR)
  • Page 18 No.P006 Lithium Battery Module Installation Diagram 1. Single-cabinet product structure 2. Battery module /PCS Lithium Battery Cabinet No. Module Qty Li Batt.-A1 Li Batt.-A2 Li Batt.-A3 Li Batt.-A4 Li Batt.-A5 Total: 5 (one master and four slave) Total : 80...
  • Page 19 No.P007 Lithium Battery Cabinet Battery Module and Cable Installation Diagram 1 Step 3: Remove the front covesr of the battery modules Step 1: Pull out the battery control unit and install the battery baffle panels. for about 10 cm. Step 2: Install the battery modules and covers.
  • Page 20 No.P007 Lithium Battery Cabinet Battery Module and Cable Installation Diagram 2 Step 6: Install the battery module cover. Step 5: Install battery copper bars and power cables. 1. Open the terminal protective cover, install the copper bars between Note: Place the cables at the notches and ensure that the covers do battery modules, and close the terminal protective cover.
  • Page 21 No.P008 UPS5000-E-800K-FM Power Module Installation Position Diagram Power module UPS5000-E-800K-FM /PCS Module Qty UPS5000E-A1 Total: Total: 8...
  • Page 22 No.P003 Outdoor Unit Power Cable Wiring Diagram 12192.0 Bottom of BBB-1250A-B1 BBB-1250A-B2 POWER DB-1 entry SMDB-A1 SMDB-B1 UPS5000E-A1 800K UPS5000E-B1 800K 1250A 1250A Li Batt.-B7 Li Batt.-B8 Power Power Bypass Bypass Power Power Bypass Bypass 80AH 40AH Bottom of Bottom of cabinet cabinet cabinet...
  • Page 23 The access control system is the customer Access Controller-1 interface and needs to be installed and connected onsite. We have reserved components and cables for Huawei's access control solution. The customer's access control device can be installed after being removed on site.
  • Page 24 No.M005 Monitoring Onsite Wiring Diagram LS-1 WATER FTP CAT5E*8 FTP CAT5E*9 BBB-1250A BBB-1250A POWER Bottom of DB-1 entry Bottom of Bottom of UPS5000E-A1 UPS5000E-B1 Li Batt.- Li Batt.- SMDB-A1 SMDB-B1 entry entry 800K 800K 1250A 1250A Power Power Bypass Bypass Power Power Bypass...
  • Page 25 No.F006 Fire Extinguishing Device Onsite Wiring Diagram BBB-1250A BBB-1250A POWER Bottom of DB-1 entry Bottom of Bottom of UPS5000E-A1 UPS5000E-B1 Li Batt.- Li Batt.- SMDB-A1 SMDB-B1 entry entry 800K 800K 1250A 1250A Power Power Bypass Bypass Power Power Bypass Bypass 80AH 40AH Bottom of...
  • Page 26 No.F004 Fire Extinguishing Device Installation Position Diagram Step 1 Determine the fire cylinder installation position based on the fire cylinder installation position diagram. Step 2 Move the fire cylinder using a pallet truck to a position near the pre-fab. module door closest to the installation position.
  • Page 27 No.P009 UPS Bottom Incoming Cable Wiring Diagram 1 Structural diagram Removing the cable cover from the bottom and drilling holes Battery input wiring terminal M16 Mains input wiring terminal M16 Output wiring terminal Bypass input wiring terminal M16 Port Recommended Terminal Mains input Bypass input Ouput...
  • Page 28 No.P009 UPS Bottom Incoming Cable Wiring Diagram 2 (3) Grounding Connecting bypass input power cables Connecting mains input power cables...
  • Page 29 No.P011 External Cables-UPS Wiring Diagram 12192.0 800.0 Bottom of BBB-1250A-B1 BBB-1250A-B2 POWER DB-1 entry Bottom of SMDB-A1 SMDB-B1 UPS5000E-A1 800K UPS5000E-B1 800K entry 1250A 1250A Li Batt.-B7 Li Batt.-B8 Power Power Bypass Bypass Power Power Bypass Bypass 80AH 40AH Bottom of Bottom of cabinet cabinet...
  • Page 30 No.P012 External Cables-PDF Wiring Diagram 12192.0 800.0 Bottom of BBB-1250A-B1 BBB-1250A-B2 POWER DB-1 entry Bottom of SMDB-A1 SMDB-B1 UPS5000E-A1 800K UPS5000E-B1 800K entry 1250A 1250A Li Batt.-B7 Li Batt.-B8 Power Power Bypass Bypass Power Power Bypass Bypass 80AH 40AH Bottom of Bottom of cabinet cabinet...
  • Page 31: Removing Transport Protection Materials

    Securing tape and red cover Horn strobe Securing tape Fire alarm bell Securing tape Emergency light Securing tape T/H sensor Securing tape Camera Securing tape Emergency door release Plastic cover button Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 32: Initial Configuration Parameters

    FusionDC1000A Prefabricated All-in-One Data Center Quick Guide (2021, France, Eutelsat) 5 Initial Configuration Parameters Initial Configuration Parameters Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 33 List of Initial Configuration Parameters Detailed Initial Configuration Category Diagram ID Diagram Name Parameters NO.P001 Power Supply and Distribution Device Layout Diagram NO.P002 Power Supply and Distribution System Diagram Initial Configurations for the Power Supply UPS5000-E-(350 kVA–800 kVA) Initial and Distribution System Configuration Parameters Table 1 Initial Configuration Parameters for Power Supply and Distribution Devices...
  • Page 34 No.P001 Power Supply and Distribution Devi ce Layout Diagram 12192.0 800.0 Sealing plate Sealing plate POWER BBB-1250A-B1 BBB-1250A-B2 Bottom of DB-1 entry Bottom of Bottom of SMDB-A1 SMDB-B1 UPS5000E-A1 800K UPS5000E-B1 800K entry entry 1250A 1250A Li Batt.-B7 Li Batt.-B8 Power Power Bypass...
  • Page 35 No.P002 Power Supply and Distribution System Diagram HUAWEI SCOPE UPS5000E-A1 UPS5000E-B1 800K 800K BBB-1250A-A1 BBB-1250A-B1 Module 1 400kVA Extensible 600kVA Module 1 400kVA Extensible 600kVA 50kVA 50kVA 50kVA 50kVA 50kVA 50kVA 50kVA 50kVA 50kVA 50kVA 50kVA 50kVA BBB-1250A-A2 BBB-1250A-B2 50kVA...
  • Page 36 Table 1 Initial Configuration Parameters for Power Supply and Distribution Devices Device Name Project Configuration Quantity Power Distribution Device Name Remarks 11D ATS ■Involved □Not involved 8D ATS ■Involved □Not involved 3D ATS ■Involved □Not involved SMU05A ■Involved □Not involved UPS5000-A ■Involved □Not involved UPS2000-G...
  • Page 37 Component UPS5000E-A1 UPS5000-E-(350 kVA–800 kVA) Initial Configuration Parameters Category Parameter Default Value Value Range Setting Remarks Advanced Param. System capacity 1.0.0.0– IP address 192.168.0.10 Default value 223.255.255.255 0.0.0.0– Subnet mask 255.255.255.0 Default value 255.255.255.255 IP settings 1.0.0.0– Gateway 192.168.0.1 Default value 223.255.255.255 MAC address Address...
  • Page 38 Category Parameter Default Value Value Range Setting Remarks Single/Parallel Single Single, Parallel Default value Requisite modules Redundant 0–19 modules Normal mode Working Mode Normal mode ECO mode, Self-aging Normal mode mode, Converter mode ±5%, ±6%, ECO voltage range ±5% ±5% ±7%, ±8%, BSC mode Non-BSC...
  • Page 39 Category Parameter Default Value Value Range Setting Remarks Output voltage level(V) 400 V 380 V, 400 V, 415 V 400 V 380 V: 209.0– The default value is 220.0, 230.0, 231.0 Output volt. and 240.0 when the voltage level 400 V: 218.5– adjustment(V)...
  • Page 40 Category Parameter Default Value Value Range Setting Remarks Dis. cur. 0.1CEOD (V/cell) 1.8–1.9 Dis. cur. 0.3CEOD (V/cell) 1.8–1.9 Dis. cur. 0.5CEOD (V/cell) 1.75 1.75–1.85 1.75 Dis. cur. 1.0CEOD (V/cell) 1.6–1.75 Sched. shallow dis. test Disable Enable/Disable Disable Battery Settings 00:00-06:00, 06:00-12:00, Sched.
  • Page 41 Component Li Batt.-A1/2/3/4/5 SmartLi Initial Configuration Parameters Category Parameter Default Value Value Range Setting Remarks IP address Automatic Automatic, Manual Default value 1.0.0.0– Subnet mask 192.168.0.10 Default value 223.255.255.255 IP Setting 0.0.0.0– Gateway 255.255.255.0 Default value 255.255.255.255 1.0.0.0– MAC address 192.168.0.1 Default value 223.255.255.255...
  • Page 42 Category Parameter Default Value Value Range Setting Remarks None/Critical alarm/Minor alarm/Fire control started/Battery temp. Set this parameter based DO_1 Fire control started abnormal/Battery EOD/Battery on the site requirements. undervoltage DO_1 Action Close Close/Open Default value Dry Contact Set None/Critical alarm/Minor alarm/Fire control started/Battery temp.
  • Page 43 No.C001 Cooling Device Layout Diagram Sealing plate Sealing plate BBB-1250A BBB-1250A POWER Bottom of DB-1 entry Bottom of Bottom of UPS5000E-A1 UPS5000E-B1 Li Batt.- Li Batt.- SMDB-A1 SMDB-B1 entry entry 800K 800K 1250A 1250A Power Power Bypass Bypass Power Power Bypass Bypass 80AH...
  • Page 44 No.C002 Air Conditioner Pipe Routing Diagram Sealing plate Sealing plate BBB-1250A BBB-1250A POWER Bottom of DB-1 entry Bottom of Bottom of UPS5000E-A1 UPS5000E-B1 Li Batt.- Li Batt.- SMDB-A1 SMDB-B1 entry entry 800K 800K 1250A 1250A Power Power Bypass Bypass Power Power Bypass Bypass...
  • Page 45 No.C003 Air Conditioner Teamwork Relationship Diagram Sealing plate Sealing plate POWER BBB-1250A BBB-1250A Bottom of DB-1 entry Bottom of Bottom of UPS5000E-A1 UPS5000E-B1 Li Batt.- Li Batt.- SMDB-A1 SMDB-B1 entry entry 800K 800K 1250A 1250A Power Power Bypass Bypass Power Power Bypass Bypass...
  • Page 46 Table 2 Initial Configurations for Cooling Devices Initial Teamwork Configuration Parameters for 55 kW Air Cooled Smart Cooling Products Number Number of Enable smart running Teamwork Teamwork Teamwork Networking cooling smart Rotation Rotation Rotation Forced Requirement Cascade conditioner Room conditioner group No.
  • Page 47 Initial Temperature and Humidity Configuration Parameters for 55 kW Air Cooled Smart Cooling Products Temperature and Temperature control mode Temperature setpoint Humidity setpoint Room Air conditioner humidity control type CRAC-1 Return air Average value CRAC-2 Return air Average value Note: You are advised not to modify other parameters.
  • Page 48 Air conditioner pipe electric heater DIXELL XR02CX thermostat initial configuration parameters Category Setting Item Default Value Setting Threshold Factory Setting Remarks Set Point -55 - 99 C14°C 40°C Differential 2.0°C 0.1 - 25 °C 5°C Anti-short cycle delay 0 - 50 min Adjusting Parameters Compressor ON time faulty probe 0 - 99 min...
  • Page 49 Ventilation window electric heater DIXELL XR02CX thermostat initial configuration parameters Category Setting Item Default Value Setting Threshold Factory Setting Remarks Set Point -55 - 99 °C 25°C Differential 2.0°C 0.1 - 25 °C 20°C Anti-short cycle delay 0 - 50 min Adjusting Parameters Compressor ON time faulty probe 0 - 99 min...
  • Page 50 No.M001 Monitoring Device Layout Diagram LS-1 WATER POWER BBB-1250A BBB-1250A Bottom of DB-1 entry Bottom of Bottom of UPS5000E-A1 UPS5000E-B1 Li Batt.- Li Batt.- SMDB-A1 SMDB-B1 entry entry 800K 800K 1250A 1250A Power Power Bypass Bypass Power Power Bypass Bypass 80AH 40AH Bottom of...
  • Page 51 Table 3 Initial Configuration Parameters for the Management System Device IP Device WebUI User LCD User Name Upper-Level Upper-Level Module Data Type Device Code Device Name Device Model Alarm Type Local Port Remarks Address Address Name and and Password Device Device Port User name: admin Preset IP address:...
  • Page 52 Device IP Device WebUI User LCD User Name Upper-Level Upper-Level Module Data Type Device Code Device Name Device Model Alarm Type Local Port Remarks Address Address Name and and Password Device Device Port Normal: closed AI/DI 33010352 LS-1 WLDS900 RJ45 Alarm: open Extinguishant Control Normal: open...
  • Page 53 No.F001 Fire Extinguishing Device Layout Diagram BBB-1250A BBB-1250A POWER Bottom of DB-1 entry Bottom of Bottom of UPS5000E-A1 UPS5000E-B1 Li Batt.- Li Batt.- SMDB-A1 SMDB-B1 entry entry 800K 800K 1250A 1250A Power Power Bypass Bypass Power Power Bypass Bypass 80AH 40AH Bottom of Bottom of...
  • Page 54 No.F002 Fire Extinguishing System Conceptual Diagram 1 Horn Strobe-1 Horn Strobe-1 Terminal Resistor Warning Signs-1 Terminal Resistor Terminal Resistor 6.8K 6.8K SILENCE SILENCE COMM+ LEV1 LEV2 2WIRE COMM+LEV1 LEV2 2WIRE Status Indicator-1 Terminal Resistor Pneumatic Switch-1 Extinguishing System Status Terminal Smoke Detector-2 Heat Detector-2 Fire Alarm Bell-1...
  • Page 55 No.F002 Fire Extinguishing System Conceptual Diagram 2 Smoke Detector-1 Smoke Detector-2 L1 IN L1 IN Terminal Resistor(6.8K) L1 OUT L1 OUT black black Heat Detector-1 Heat Detector-2 L1 IN L1 IN Terminal Resistor(6.8K) L1 OUT L1 OUT black black To Monitoring system brown &...
  • Page 56 No.F002 Fire Extinguishing System Conceptual Diagram 3 POWER DB-1 POWER DB-1 -24VDC TX2_20 QF13 TX2_19 +24VDC black black ROV SIL FLT RST DATA POWER ZONE 1 ZONE 2 ZONE 3 MODE HOLD EXTING EXTRACT FAULT LOCAL FIRE REMOTE SELECT RELEASE DH1ESS DH1ESS RELAY...
  • Page 57 No.F005 Fire Extinguishing Pipe Layout Diagram BBB-1250A BBB-1250A POWER Bottom of DB-1 entry Bottom of Bottom of UPS5000E-A1 UPS5000E-B1 Li Batt.- Li Batt.- SMDB-A1 SMDB-B1 entry entry 800K 800K 1250A 1250A Power Power Bypass Bypass Power Power Bypass Bypass 80AH 40AH Bottom of Bottom of...
  • Page 58 No.L001 Lighting Devi ce Layout Diagram 12192.0 800.0 POWER BBB-1250A-B1 BBB-1250A-B2 Bottom of DB-1 entry Bottom of Bottom of SMDB-A1 SMDB-B1 UPS5000E-A1 800K UPS5000E-B1 800K entry entry 1250A 1250A Li Batt.-B7 Li Batt.-B8 Power Power Bypass Bypass Power Power Bypass Bypass 80AH 40AH...
  • Page 59 No.F003 Escape Route Diagram BBB-1250A BBB-1250A POWER Bottom of DB-1 entry Bottom of Bottom of UPS5000E-A1 UPS5000E-B1 Li Batt.- Li Batt.- SMDB-A1 SMDB-B1 entry entry 800K 800K 1250A 1250A Power Power Bypass Bypass Power Power Bypass Bypass 80AH 40AH Bottom of Bottom of cabinet cabinet...
  • Page 60: A Common Torque Selection Table

    Block Battery (Commo Wiring n Steel Terminal Connecto Cross Electric recessed screwdriv small pan head screw assembly Cross Electric recessed screwdriv counters unk head screw; cross recessed pan head screw assembly Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 61 Cross Pneumati recessed counters screwdriv unk head screw Hexagon Torque head wrench screw assembly Hexagon Torque head wrench screw assembly Common Torque 1600 1200 bolt wrench Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 62 50 (for recessed checking, hexagon screwdriv not for flange tightenin self- drilling tapping screw G1/2'' 1/2'' pipe Torque connecto wrench G3/4'' 3/4'' pipe Torque connecto wrench G1'' 1'' pipe Torque connecto wrench Issue 01 (2021-04-30) Copyright © Huawei Technologies Co., Ltd.