ECC800 Data Center Controller V100R001C41 User Manual Issue Date 2020-03-16 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
About This Document About This Document Purpose This document describes the ECC800 data center controller (ECC800 for short) in terms of features, devices, user interfaces (UIs), and power-on commissioning, as well as frequently asked questions (FAQ) and troubleshooting measures. This document describes all the functions of the ECC800. Certain functions are implemented by hardware such as the UPS and PDU, and may be unavailable if the hardware is not connected to the ECC800.
Page 4
Updated the air conditioner name to smart cooling product. Issue 03 (2018-04-21) Updated the maximum numbers of NetCol5000-A025 and NetCol5000-A011 units that can be connected in Devices Connected to the ECC800. Issue 02 (2018-01-08) Updated certain UI fields. Updated the context in 9.1.13 How Can I Synchronize Device Parameters?.
Page 7
5.5.1 Commissioning a Multi-functional Sensor ......................113 5.5.2 Commissioning a Smoke Sensor ........................115 5.5.2.1 Commissioning a Smoke Sensor (connected to the AI/DI port on the ECC800) ..........115 5.5.2.2 Commissioning a Smoke Sensor (Connected to the AI/DI port on the skylight actuator) ......... 116 5.5.3 Commissioning a Water Sensor ........................
Page 8
9.1.4 How to Install a Network Security Certificate? ....................189 9.1.5 How Can I Install a Device Access Certificate? ....................190 9.1.6 How Can I Change the ECC800 IP Address on the WebUI? ................191 9.1.7 How Should I Configure Alarm Parameters? ....................191 9.1.8 How Can I View Real-Time Monitoring Data, Active Alarms, Historical Alarms, Access Event, and Operation...
Page 9
9.1.15 How to Associate an Alarm Severity with a DO Output?................. 196 9.1.16 How Can I Handle DO Association Failure? ....................197 9.1.17 What Do I Do If the ECC800 WebUI Display Language Changes from Chinese to English During Use? ..197 9.1.18 How Can I Rectify Camera Access Restriction?....................198 9.1.19 How Should I Add the Devices Accessed Through a Smart ETH Gateway over Modbus-TCP to the ECC800...
The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
Do not power on the equipment before it is installed or confirmed by professionals. 1.2 Personnel Requirements Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations.
Metal shavings from drilling may short-circuit boards inside the equipment. Obtain the consent from the customer, subcontractor, and Huawei before drilling. Wear goggles and protective gloves when drilling holes. ...
Overview 2.1 Positioning The ECC800 is the core component for the smart module local management. It is intelligent, flexible in connection, easy to maintain, and reliable. It adopts the POE bus for expansion, and allows all intelligent monitoring devices to be flexibly laid out so that it can manage the devices in the smart module.
User Manual 3 Device Description Device Description 3.1 ECC800 The ECC800 consists of power supply units (PSUs) and an ECC800 main control module and monitors the equipment and environment in the smart module. Figure 3-1 ECC800 (front view) (1) PSU 1...
Page 24
ECC800 Data Center Controller User Manual 3 Device Description Table 3-2 ECC800 structural specifications Item Specifications Dimensions (L x W x H) 442 mm x 330 mm x 43.6 mm Color Black Installation Can be installed in a 1 U space in a standard...
Page 25
3G/4G Operation WCDMA BAND: 850 MHz–2100 Frequency GSM: 850 MHz–1900 MHz 3G/4G EIRP (max.) 36 dBm Software version V100 Indicators Table 3-5 Indicators on the ECC800 main control module Indicator Color Name Status Description Green Running status Steady on The power supply is normal, the...
Pin 2 Pin 3 Pin 4 Power Ports The ECC800 provides four power ports, including two AC input ports (AC_INPUT1 and AC_INPUT2) and two DC output ports (DC_OUTPUT1 and DC_OUTPUT2). Table 3-13 provides the power port pin definitions. Table 3-13 Power port pin definitions...
Blinking at The smart ETH gateway long successfully registers with intervals the ECC800 and the software runs properly (the indicator blinks at 0.5 Hz, on for 1s and then off for 1s). Blinking at The smart ETH gateway does...
Blinking at long The power distribution unit intervals has successfully registered with the ECC800 and the software runs properly (the indicator blinks at 0.5 Hz, on for 1s and then off for 1s). Blinking at The power distribution unit...
The access actuator is the control component for the aisle door in a smart module. It connects to the ECC800 controller over FE port, wireless networking (802.15.4). It opens the magnetic lock by detecting the card swiping information of the card reader, door open button information, and fire linkage information.
Page 42
Blinking at long intervals: The access actuator successfully registers with the ECC800 and the software runs properly (the indicator blinks at 0.5 Hz, on for 1s and then off for 1s). Blinking at short intervals: The...
Page 51
Blinking at The AC actuator successfully long intervals registers with the ECC800 and the software runs properly (the indicator blinks at 0.5 Hz, on for 1s and then off for 1s). Blinking at The communication is...
Page 54
Blinking at The skylight actuator long intervals successfully registers with the ECC800 and the software runs properly (the indicator blinks at 0.5 Hz, on for 1s and then off for 1s). Blinking at The communication fails or the...
Page 57
Module running Blinking at The multi-functional sensor status indicator long intervals successfully registers with the ECC800 and the software runs properly (the indicator blinks at 0.5 Hz, on for 1s and then off for 1s). Blinking at The multi-functional sensor...
Blinking at The WiFi converter long intervals status successfully registers with the indicator ECC800 and the software runs properly (the indicator blinks at 0.5 Hz, on for 1s and then off for 1s). Blinking at The WiFi converter fails to...
1s). Blinking at The communication fails or short the ETH converter fails to intervals register with the ECC800 (the indicator blinks at 4 Hz, on for 0.125s and then off for 0.125s). Blinking The indicator blinks at super short intervals for 0.5s...
Step 1 Connect a network cable between the PC network port and the WAN_1 port (protected by a security mechanism) on the ECC800. Table 4-1 Default IP addresses for the WAN and LAN ports on the ECC800 Port Default IP Address WAN_1 192.168.1.10...
Page 86
Step 3.3 Step 3.4. If the ECC800 connects to the Internet, and the PC in a LAN accesses the Internet over a proxy server, do not perform Step 3.3 Step 3.4. Otherwise, you will fail to access the ECC800.
Then set the security level of the trusted site to the lowest. When switching between different versions of the ECC800 on your PC, you are advised to clear the historical Internet Explorer cache. Failing to do so may cause some information missed or exception after login.
Page 90
Query and set device performance parameters. Configure multi-module settings to cascade up to three ECC800s. Maintenance Upgrade the software of the ECC800 and southbound devices and download the app. (App installation package 16.5 M) Query the version and e-labels. ...
Step 3 Choose Settings > Communication, and set IP address assign to Automatic(DHCP). Step 4 Tap to go back to the main menu screen. After setting parameters for the integrated UPS, the ECC800 discovers the access from the integrated UPS automatically. ----End 5.3.2 How to Set and Add a UPS2000-G?
Page 97
UPS2000-G based on the actual situation. Click Test Connect to check whether the UPS2000-G connects to the ECC800 properly. − If the UPS2000-G connects to the ECC800 properly, click Confirm. The connected devices are displayed in the Number of connected devices list.
The section describes how to add a UPS2000-G in a single UPS scenario. In a parallel UPS scenario, if the common communications address of the Modbus card is added to the ECC800, all UPS2000-Gs can be connected to the ECC800.
UPS5000-E based on the actual situation. Click Test Connect to check whether the UPS5000-E connects to the ECC800 properly. If the UPS5000-E connects to the ECC800 properly, click Confirm. The connected −...
Page 100
In this example, Device address is set to 2. During actual configuration, set the device address based on the actual situation. Click Test Connect to check whether the SUNRISE-SCU-20K connects to the ECC800 properly. − If the SUNRISE-SCU-20K connects to the ECC800 properly, click Confirm. The connected devices are displayed in the Number of connected devices list.
Choose Settings > Comm Settings > Modbus Settings, and set Connection mode to Server, Server encryption to Enable. After setting parameters for the NetCol5000-C030, the ECC800 discovers the access from the air conditioner automatically. The earlier version has Protocol setting on the screen. The actual screen prevails.
Page 102
In this example, Device address is set to 1. During actual configuration, set the device address for the NetCol5000-C030 based on the actual situation. Click Test Connect to check whether the NetCol5000-C030 connects to the ECC800 properly. − If the NetCol5000-C030 connects to the ECC800 properly, click Confirm. The connected devices are displayed in the Number of connected devices list.
Choose Settings > Comm Settings > Modbus Settings, and set Connection mode to Server and client, Server encryption to Enable. After the NetCol5000-A025 parameters are set, the ECC800 can automatically identify the automatic access of the NetCol5000-A025. Step 2 Set the running parameters and control parameters for the 25 kW smart cooling product on the ECC800 WebUI.
Choose Settings > Comm Settings > Modbus Settings, and set Connection mode to Server and client, Server encryption to Enable. After the NetCol5000-A042 parameters are set, the ECC800 can automatically identify the automatic access of the NetCol5000-A042. Step 2 Set the running parameters and control parameters for the 42 kW smart cooling product on the ECC800 WebUI.
Comm address based on site requirements. The earlier version has Protocol setting on the screen. The actual screen prevails. Step 2 Set the running parameters and control parameters for the NetCol5000-A035 on the ECC800 WebUI. The NetCol5000-A035 connects to the smart ETH gateway through the ETH converter to communicate with the ECC800.
ECC800 Data Center Controller User Manual 5 Power-On Commissioning Context The method of connecting the PDU8000 to the ECC800 is the same as that for the integrated PDU. Connecting the integrated PDU to the ECC800 by following the instructions in this section. Procedure Step 1 Set the PDU8000 monitoring parameters.
Page 107
If the PDU8000 connects to the ECC800 properly, click Confirm. The connected devices are displayed in the Number of connected devices list. − If the PDU8000 does not connect to the ECC800 properly, check whether the cable between the PDU8000 and the ECC800 is connected properly, whether the Issue 07 (2020-03-16)
One end of the straight-through cable has been connected to the COM 1 or COM 2 port on the PDU2000, and the other end has been connected to the COM port on the ECC800 collector, rack environment unit, or ETH converter.
Page 110
Number of connected devices list. − If the PDU2000 does not connect to the ECC800 properly, check whether the cable between the PDU2000 and the ECC800 is connected properly, whether the PDU2000 and ECC800 are running properly, and whether the input parameters are consistent with the PDU2000 parameters.
If the smart busway is used, general input units and power distribution units communicate with the ECC800 using the Modbus-MAC protocol. After the general input units and power distribution units properly connect to the ECC800, the ECC800 automatically identifies the units.
5.3.14 How to Set and Add an ATS? Prerequisites One end of the straight-through cable has been connected to the COM port on the ATS, and the other end has been connected to the COM port on the ECC800 collector, rack environment unit, or ETH converter. Context The ATS (ABB) model is OMD800.
Prerequisites One end of the straight-through cable has been connected to the RS485 port on the PMAC615 AC meter, and the other end has been connected to the COM port on the ECC800. Context The model of the single-phase AC meter for the lighting control box is PMAC615.
Prerequisites One end of the straight-through cable has been connected to the RS485 port on the PDC DC meter, and the other end has been connected to the COM port on the ECC800. Context The model of the PDC is PDU8000-0630DCV5-HVA002 and the BOM number is 02403121.
Number of connected devices list. − If the PDC DC meter does not connect to the ECC800 properly, check whether the cable between the PDC DC meter and the ECC800 is connected properly, whether the PDC DC meter and ECC800 are running properly, and whether the input parameters are consistent with the PDC DC meter parameters.
----End 5.3.19 Adding a IP Device Prerequisites A IP device is connected to the ECC800 over a switch. The device and ECC800 have been powered on. You have obtained the IP address of the IP device. Issue 07 (2020-03-16)
IP devices, such as ATMs, are devices with IP attributes in an equipment room or site. By adding a IP device, you connect the device to the ECC800 in the same network so that the ECC800 monitors the device status. If the IP device is offline, the ECC800 will report a disconnection alarm on its WebUI.
Page 121
That is, the RF_Z indicators on the ECC800 and AC actuator are both steady green. If the RF_Z indicator on the ECC800 is not steady green, hold down the SW button on the ECC800 for more than 6 seconds to make the ECC800 enter non-networking status. ...
Procedure Step 1 Set smoke sensor parameters. In this example, the smoke sensor is connected to the AI/DI_3 port on the ECC800. Log in to the ECC800 WebUI as an administrator. Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed.
5 Power-On Commissioning On the query result tab page, set the new signal name of AI/DI_3 to Smoke and click Submit. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_3 Port Settings. Set Smoke sensor to Enable and click Submit.
Step 1 Set water sensor parameters. In this example, the water sensor is connected to the AI/DI_1 port on the ECC800. The default alarm severity of the AI/DI port is Minor. If you want to change the alarm severity, see How Should I Configure Alarm Parameters.
Step 1 The default communications address 1 of the water sensor is used for connecting to the ECC800. Step 2 Add a water sensor. In this example, the water sensor is connected to the COM1 port on the ECC800. Log in to the ECC800 WebUI as an administrator. Add the water sensor.
Procedure Step 1 Set water sensor parameters. In this example, the water sensor is connected to the AI/DI_3 port on the ECC800. Log in to the ECC800 WebUI as an administrator. Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed.
In this example, the door status sensor is connected to the AI/DI_1 port on the independent deployment AI_DI 1. Log in to the ECC800 WebUI as an administrator. Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed.
In this example, the door status sensor is connected to the AI/DI_1 port on the rack environment unit 1. Log in to the ECC800 WebUI as an administrator. Choose Monitoring > IT Cabinet > IT Cabinet 1 > Cabinet Collector1 > Running Parameters >...
Procedure Step 1 Set temperature sensor parameters. In this example, the temperature sensor is connected to the AI/DI_2 port on the ECC800. Log in to the ECC800 WebUI as the administrator. Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed.
Go to the LCD screen of the T/H sensor. Press SET to go to the ADD screen, and set the device address to 1 by pressing + or –. Step 2 Add a T/H sensor. Log in to the ECC800 WebUI as an administrator. Add a T/H sensor. Table 5-31 Adding a T/H sensor...
Number of connected devices list. − If the T/H sensor does not connect to the ECC800 properly, check whether the cable between the T/H sensor and the ECC800 is connected properly, whether the T/H sensor and ECC800 are running properly, and whether the input parameters are consistent with the T/H sensor parameters.
Page 134
Number of connected devices list. − If the T/H sensor does not connect to the ECC800 properly, check whether the cable between the T/H sensor and the ECC800 is connected properly, whether the T/H sensor and ECC800 are running properly, and whether the input parameters are consistent with the T/H sensor parameters.
Access Right Management page. The added or modified user accounts and rights are saved only in the ECC800 main control module. The modified rights take effect in the access control device only after you click Synchronize Permission on the Access Right Management page.
Page 138
If the access control system uses a Card and password reader, choose Monitoring > Aisle > Access Actuator Group > Access Actuator n on the ECC800 WebUI, click Running Parameters, and set Logical level configuration for reader removed of the corresponding card reader to High level alarm.
If CIMs and battery interface modules (BIMs) are installed, perform the following steps to commission. Procedure Step 1 Log in to the ECC800 WebUI as an administrator. Step 2 Choose Monitoring > Power Distribution > CIM > Running Parameters. Step 3 Set CIM single battery qty., Batt installation time, Battery string capacity, Current source, and Battery string No..
To ensure the normal operating of the ECC800, avoid high data traffic, such as the concurrent display of dynamic monitoring of cameras and VCN500 video playback. To ensure the normal operating of the ECC800, you can view the videos from a maximum of two IPC6325-WD-VR cameras concurrently. 5.7.1 Configuring the VCN500 Prerequisites For details about the VCN500 hardware description and installation, see the "Quick Start"...
Page 144
After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
(Dynamic Host Configuration Protocol). In the network, the IPC6325 camera automatically obtains an IP address in the same IP address segment as the ECC800 after the ECC800 and IPC6325 are powered on. Therefore, you need to reset the IPC6325 camera IP address before commissioning an IPC6325 camera.
Page 146
(Optional) In the scenario without the ring network of the smart ETH gateway, use a network cable to connect a PC to an idle POE port of the smart ETH gateway. Configure the PC IP address and IP address of the LAN port on the ECC800 in the same network segment.
After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
Page 154
After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
Hold down the BLINK button on a device for less than 1s to report the blinking status to the ECC800. The corresponding device icon in the WebUI plan view blinks. Drag a device in the WebUI plan view. The RUN indicator on the corresponding device blinks intermittently at super short intervals.
Page 164
Step 3 Hold down the BLINK button on a device such as a smart ETH gateway for less than 1s to report the blinking status to the ECC800. The corresponding device icon in the WebUI plan view blinks. Check that the device positions and types in the plan view are consistent with the actual situation by delivering the blinking command.
To implement alarm notification by email, the following conditions must be met: The ECC800 is connected to a network with n email server through a WAN port. Both the Internet and local area network (LAN) are supported. The ECC800 supports only SMS notification service but not data service by using the 3G module.
6.1.1 Linking the Smoke Alarm with the Alarm Beacon Prerequisites The alarm beacon is connected to the DO port on the ECC800. Context This section describes how to set an alarm linkage by linking output dry contact of the smoke alarm on the multi-functional sensor to the DO2 port.
Procedure Step 1 Choose System Settings > Alarm Parameter Settings > Alarm Linkage. Step 2 Select ECC800 for Device Type, select Device Type or Device for Linkage type, and click Confirm. Select ECC800 from the Device Name list if you have selected Device for Linkage type, and click Confirm.
Context A maximum of three ECC800s can be cascaded. After the IP addresses of other smart module ECC800s in the room are added to an ECC800, their active alarms and PUE data can be displayed and viewed. You can click links on the cascading management page of the master ECC800 to display the login pages of the other ECC800s.
Step 5 Choose Home > Multi-Module Monitoring. The information about the cascaded ECC800s is displayed. Figure 6-2 ECC800 cascading page Step 6 (Optional) Click the alarm bubble in the Active alarms area in a smart module to view the corresponding active alarm information.
Page 173
Smart cooling product should be placed face to face. − An integrated UPS, integrated PDC, or precision PDC is deployed inside the smart module. The ECC800 can collect statistics on IT branch power information for each IT cabinet and network cabinet. −...
In this case, the smart cooling product automatically exits the iCooling teamwork mode and enters the intelligent teamwork mode. When L1/L2 is enabled, the T/H threshold can only be set on the ECC800 WebUI. When L1/L2 is disabled, smart cooling products enter the intelligent teamwork control mode (teamwork controlof smart cooling products).
Step 4 Set the PUE configuration mode to Standard, and click Submit. Step 5 View the PUE. Choose Query > Performance Data and set Device to ECC800 from the drop-down list box. For other searching criteria such as Performance data, Statistics mode, Start time, and End time, select the item based on requirements and click Query.
Page 176
End time as required, and click Query. Record the increment in total electrical energy of system IT load output of the ECC800. Increment in total electrical energy of system IT load output = 56.0 kWh – 50.0 kWh = 6.0 kWh Figure 6-6 Querying the total electrical energy of system IT load output Calculate the PUE of the smart module.
Deletes a parameter setting for the total power consumption or IT power consumption. Procedure Step 1 Log in to the ECC800 WebUI as an administrator. Step 2 Choose System Settings > PUE Configuration. Step 3 Ensure that PUE function is set to Enable.
Page 178
IT load output) Performance data source: The ECC800 obtains total electricity energy of branches from the power distribution devices. Step 6 You can also view the PUE in the dashboard or PUE Chart on the home page.
Default 192.168.1.1 Set this parameter based on the default gateway gateway address assigned by the network administrator. Step 3 Click Submit. Step 4 Set NetEco communications parameters on the ECC800 WebUI. Table 7-2 NetEco parameters Path Parameter Default Setting Value Server IP 192.168.8.1...
Status, Start Time, End Time, and Information in the displayed Progress window. During binding of the ECC800 for the first time, the screen will be locked indefinitely when the progress bar reaches 30%, and displays Loading device profile. Please try it later. The actual operation results prevail.
SNMPv3 as an example. Procedure Step 1 Apply to the equipment room network administrator for a fixed IP address. Step 2 Set the IP address, subnet mask, and default gateway on the ECC800 WebUI. Table 7-4 IP parameters Path...
The cable connection is Secure loose cables. connection secure. Cables are not damaged. Replace damaged cables. Table 8-2 Routine maintenance for the main control module in the ECC800 Check Item Expected Result Troubleshooting Indicator The green indicator is steady If the indicator is off or any abnormal on or blinking.
Submit to synchronize the configuration parameters of the failure device to the reserved device. On the Monitoring > System > ECC800 > Controls tab page, select Delete device with communication failure and click Submit, add the reserved device to the smart module view.
Page 191
Path: Maintenance > Configuration File > Back Up Current Settings If the main control module is damaged, you may fail to log in to the ECC800. In this case, you cannot back up the settings.
8 Maintenance Figure 8-2 Installing the Micro SD and SIM card Step 7 Install the spare ECC800 main control module in the ECC800 subrack and tighten the screws on both sides of the ECC800 main control module. Step 8 Connect the communications cables, WiFi module, and antennas to the ECC800 main control module.
Tools: ESD wrist strap, ESD gloves Materials: Spare ECC800 antennas of the same model are available and functional. Procedure Step 1 Remove the 2.4G and 3G antenna cables connected to the ports on the ECC800, as shown in Figure 8-4. Figure 8-4 Removing antennas Step 2 Install the spare 2.4G antenna and 3G antenna in the original positions and connect them to...
Step 2 Loosen the screws on both sides of the ECC800 main control module. Step 3 Pull the handles on both sides of the ECC800 main control module, and to remove the main control module.
Page 195
Step 6 Install the ECC800 main control module in the card slot. Step 7 Tighten the screws on both sides of the ECC800 main control module. Step 8 Reconnect signal cables to the ECC800 main control module panel based on the recorded information.
Step 1 Log in to the ECC800 WebUI as an administrator. Step 2 Click in the upper right corner of the home page and view the ECC800 version information. Step 3 Choose Maintenance > Version Information and view the version information of ECC800 and connected device.
ECC800 WebUI. You need to apply to an organization authorized by the customer for a network security certificate and its key with the ECC800 IP address or domain name. This section describes how to import the certificate and key. Procedure Step 1 Log in to the ECC800 WebUI as an administrator.
You have obtained a device access certificate and the certificate key and have copied the certificate and key file to the PC. A preset certificate is provided for the ECC800 and its connected devices. If a higher security level is required, replace the certificate both on the ECC800 and the devices. ...
Step 2 Choose System Settings > Alarm Parameter Settings. Step 3 On the Basic Alm Para page, choose ECC800 from the Select a device type drop-down list box, choose the ECC800 to be set from the Device Name drop-down list box, and then click Confirm.
Step 5 On the Alarm Linkage page, set Device Type to ECC800, select Device Type or Device in the Linkage Type column, and click Confirm. Step 6 (Optional) If you select Device in the Linkage Type column, select the ECC800 to be set in the Device Name column.
Encryption Password. Procedure Step 1 Log in to the ECC800 WebUI as an administrator. Step 2 Select Query > Export Data. Step 3 (Optional) Select Encryption password for export and enter an encryption password.
----End 9.1.12 How Can I Export Fault Information? Procedure Step 1 Log in to the ECC800 WebUI as an administrator. Step 2 Choose Maintenance > Fault Information. Step 3 (Optional) Select Encryption password for export and enter an encryption password.
Figure 9-2 Monitoring Procedure Step 1 Log in to the ECC800 WebUI as an administrator. Step 2 Choose Maintenance > Parameter Sync. Step 3 Select a value from the Device type drop-down list box. Step 4 Specify source device and target device, click Submit.
Step 5 Choose Device type or Device from Linkage Type. Step 6 (Optional) Select ECC800 from Linked Device if you select Device for the Linkage Type. Step 7 Set DO1 or DO2 to Yes and click OK. Select a DO not used by other functions. Otherwise, the association setting fails.
You have obtained the IP address of the ECC800 as well as the user name and password used for WebUI login. A PC with an IP address in the same network segment as that of the ECC800 is prepared, and the PC has connected to port WAN_1 on the ECC800. Context ...
----End 9.1.18 How Can I Rectify Camera Access Restriction? Prerequisites If Huawei S12700 series switch is used, refer to this section to rectify the fault. For more information, consult network engineers. Context The camera is inaccessible after the MAC address and IP address are bound in network configuration.
9 FAQ Procedure Step 1 Ensure that the device communication mode has been set to DHCP. Step 2 Log in to the ECC800 WebUI as an administrator, and check whether the device exists on the Monitoring page. If the device exists, and communication status is normal, the device has accessed the ECC800 successfully.
Page 209
9 FAQ Figure 9-5 Network diagram Procedure Step 1 Log in to the ECC800 WebUI as an administrator, and check whether the device exists on the Monitoring page. The following is an example of confirming the access of a WiFi converter.
Communications address This section uses 1 as an example. Set this parameter based on site requirements. Step 2 Add the device to the ECC800 WebUI. Log in to the ECC800 WebUI as the administrator. Add the device. Issue 07 (2020-03-16)
----End Follow-up Procedure Choose Home > Plan View on the ECC800 WebUI, and drag the device to the corresponding position in the Smart Module View pane based on the actual device layout. 9.1.22 How Should I Add Devices Accessed Through the ECC800...
----End Follow-up Procedure Choose Home > Plan View on the ECC800 WebUI, and drag the device to the corresponding position in the Smart Module View pane based on the actual device layout. 9.1.23 How Should I Add Devices Accessed Through the ECC800...
----End Follow-up Procedure Choose Home > Plan View on the ECC800 WebUI, and drag the device to the corresponding position in the Smart Module View pane based on the actual device layout. 9.1.24 How Should I Open Doors Remotely over the ECC800...
ECC800 WebUI. Procedure Step 1 Log in to the ECC800 WebUI as an administrator. Step 2 Turn on or off aisle lights. Table 9-7 Operations for turning on or off aisle lights...
9.1.26 How Should I Opening Skylights Remotely over the ECC800 WebUI? Context You can open skylights over the ECC800 WebUI in emergencies. Procedure Step 1 Log in to the ECC800 WebUI as an administrator. Step 2 Open skylights. Table 9-8 Operations for opening skylights Path Setting Monitoring >...
9.1.27 How Should I Turn On or Off Smart Cooling Products over the ECC800 WebUI? Context You can turn on or off smart cooling products over the ECC800 WebUI in emergencies. Procedure Step 1 Log in to the ECC800 WebUI as an administrator.
When O&M personnel need to open a cabinet for maintenance, you can open the cabinet electronic lock over the ECC800 WebUI. Procedure Step 1 Log in to the ECC800 WebUI as an administrator. Step 2 Open the cabinet electronic lock. Table 9-10 Operations for opening a cabinet electronic lock...
The following describes how to modify the name of the smart ETH gateway. Procedure Step 1 Log in to the ECC800 WebUI as an administrator. Step 2 Modify the device name. Table 9-11 Operations for modifying a device name...
Procedure Step 1 Connecting to a WiFi network. Method 1: Insert a WiFi module into the USB port on the ECC800. Figure 9-16 Installing a WiFi module Method 2: Connect cables between the WiFi converter and a smart ETH gateway as well as between the smart ETH gateway and the ECC800.
You have obtained the IP address of the ECC800 as well as the user name and password used for WebUI login. A PC with an IP address in the same network segment as that of the ECC800 is prepared, and the PC has connected to port WAN_1 on the ECC800. Procedure Step 1 Download and obtain the app installation package using any of the following three methods: ...
Page 222
Install the HUAWEI App Store. If the downloaded file exists in the drop-down list box, tap the file to install the HUAWEI App Store. If the downloaded file does not exist in the drop-down list box, choose File > Local on the desktop, find the Download folder, and click the HUAWEI App Store installation package.
It is recommended that you use different user names to log in to both the ECC800 WebUI and app at the same time. If you use the same user name to log in to the WebUI and app at the same time, either of them will be forcibly logged out.
9 FAQ 9.2.4 How Can I Export and Import Data Procedure Step 1 Log in to the ECC800 mobile phone or pad app as an administrator. Step 2 Export data. Choose More > System Maintenance > Export Data. Select Local or USB from the Select export location drop-down list box.
Step 1 If you have obtained the user name and password used in the previous successful login, perform the following operations: Check that the mobile phone or pad connects to the ECC800 over WiFi properly. Use the obtained user name and password to log in to the app and exit.
10 PLC Introduction PLC Introduction The ECC800 provides the flexible programmable logic controller (PLC) linkage function. You can set logic rules and control the DO output signal by collecting the signal value. You can select signals (such as the AI/DI device status signals) and perform logic operations such as AND, OR, NOT, GREATER THAN, LESS THAN, DELAY, and FILTER.