MOUNTING/DISMOUNTING
Before Installation
IMPORTANT
To allow the evaporation of any condensation resulting from low shipping / storage temperatures, keep the controller at
room temperature for at least 24 h before applying power.
US requirement, only: This device must be installed in a UL-listed enclosure offering adequate space to maintain the
segregation of line voltage field wiring and Class 2 field wiring.
In the case of vertical mounting on DIN rails, the EAGLE controller should be secured in place using a commercially-available
stopper
See also the EAGLE Mounting Instructions (MU1Z-0970GE51).
Dimensions
1
2
Fig. 16. EAGLE Controller (shown here with two MVC-80-AC1 covers in place), dimensions (in mm)
NOTE: Use of the MVC-80-AC1 will obstruct access to the ETHERNET and USB 2.0 Device Interfaces
EAGLE CONTROLLER – INSTALLATION & COMMISSIONING INSTRUCTIONS
215.5
24 25 26
27 28 29 30 31 32
33 34 35 36 37
5
6
7
8
9 10
11 12 13 14 15 16 17 18
Fig. 15. EAGLE Controller, dimensions (in mm)
215.5
38 39
40 41 42 43 44 45 46 47
L1 L2 Tx Rx
!
19 20 21 22
23
9
57.5
49.5
55.5
45
52
57.5
55.5
52
EN1Z-0970GE51 R1112