Figure 1
A
B
C
D
E
F
Turn off the power supply to the LTC Plus
satellite. Remove the cabinet's front cover to
access the internal components. Disconnect
all cables labeled A through F from the timing
mechanism and the front distribution board.
Retain cables B, D, E and F for installation.
Cables A and C will no longer be required for
the conversion and should be sent back to Toro
for proper recycling or disposal procedures. See
Figure 1.
Figure 4
Disconnect the flex cable that connects the
distribution board to the pump/common
module on the front side of the cabinet. Detach
the pump/common module by removing the
three retaining screws and washers. Retain the
flex cable, screws, washers and pump/common
module for installation. See Figure 4.
Network LTC Plus-to-Network VP/VP
Conversion Kit Installation Instructions
Figure 2
Open the cabinet's top cover to access the
timing mechanism (TM). Remove the four
retaining screws from the TM and lift it out of
the cabinet. Remove the modem from the back
of the TM and retain it for installation. The
LTC Plus TM will no longer be required for the
conversion and should be sent back to Toro for
proper recycling or disposal procedures.
See Figure 2.
Figure 5
Remove the three retaining screws from the
distribution board and detach it from the
backplate. Retain the screws for installation.
The LTC Plus distribution board will no longer
be required for the conversion and should
be sent back to Toro for proper recycling or
disposal procedures. See Figure 5.
Only the front distribution board is
NOTE
being replaced with a Network VP conversion
board. The rear distribution board (If
equipped) will communicate directly to the
Network VP conversion board.
Figure 3
Disconnect the flex cables from the distribution
board on the front side of the cabinet. Detach
the output boards by removing the two retaining
screws. Retain all flex cables, screws and output
boards for installation. See Figure 3.
Figure 6
Install the Network VP/VP
conversion board
E
onto the backplate. Use the three retaining
screws removed from the old distribution board
to secure. See Figure 6.
E