satellites can be retrofitted with the newly designed distribution board bracket that allows for the distribution board to be vertically installed. With the
E
distribution board vertically installed, the risk of equipment damage from moisture and debris accumulation over the distribution board is reduced.
Removal and Installation of the Distribution
Figure 1
Remove Distribution Board
(Bracket Only Kit)
Step 1 – Remove the satellite's front and rear door to access the distribution board.
Step 2 – Turn the satellite's power off.
Step 3 – If the satellite is equipped, remove the Maxon radio assembly and/or Turf Guard repeater.
Step 4 – Locate the distribution board and remove by pressing the retaining tabs to release the board.
Step 5 – Unplug all cables from it. Note the location of the cables for reassembly. See Figure 1.
Step 6 – (For Bracket Only Kit) Install the distribution board onto the bracket as shown on Figure 2. Place rubber washer between the distribution board and the
screw nut. Place spacers on the threaded post between the distribution board and the bracket.
Step 7 – Install the bracket and board assembly inside the satellite using the provided screw holes above the center back plate. Make sure to align and insert the
bracket's bottom tabs into the center back plate.
See Figure 3.
Step 8 – Reinstall the cables to the distribution board.
Step 9 – Return power to the satellite and check for proper function.
Page 1
VP and VP Bracket Retrofit Kits Installation Instructions Introduction The VP and VP satellites can be retrofitted with the newly designed distribution board bracket that allows for the distribution board to be vertically installed. With the distribution board vertically installed, the risk of equipment damage from moisture and debris accumulation over the distribution board is reduced. Removal and Installation of the Distribution Figure 1 Figure 2...