FusionModule1000A40 Prefabricated All-in-One
Data Center
V200R003
Commissioning Guide
Issue
04
Date
2020-01-17
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei FusionModule1000A40

  • Page 1 FusionModule1000A40 Prefabricated All-in-One Data Center V200R003 Commissioning Guide Issue Date 2020-01-17 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 4 Issue 03 (2019-12-20) Updated the safety information. Issue 02 (2019-12-16)  Updated the USB description.  Updated the password change description. Issue 01 (2018-03-01) This issue is the first official release. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 5: Table Of Contents

    7.1.2 Commissioning the Logic Load Disconnection (Powering-Off) of the Power Supply System Under Normal Temperature ..................................31 7.2 Commissioning the Cooling System ........................... 32 7.3 The Management System Commissioning ......................... 33 Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 6 8.4 Commissioning Fire Extinguishing Devices ....................... 71 8.4.1 Commissioning the Extinguishant Control Panel (CE) ................... 71 8.4.2 Commissioning the Emergency Light (CE) ......................72 8.4.3 (Optional) Commissioning the VESDA ........................74 A Acronyms and Abbreviations ....................76 Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 7: Safety Information

    The"NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
  • Page 8  Keep irrelevant people away from the equipment. Only operators are allowed to access the equipment.  Use insulated tools or tools with insulated handles, as shown in the following figure. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 9  To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits to telecommunication network voltage (TNV) circuits. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 10: Personnel Requirements

    Do not power on the equipment before it is installed or confirmed by professionals. 1.2 Personnel Requirements  Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations.
  • Page 11 When selecting, connecting, and routing cables, follow local safety regulations and rules. The static electricity generated by human bodies may damage the electrostatic-sensitive components on boards, for example, the large-scale integrated (LSI) circuits. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 12: Installation Environment Requirements

     Ensure that the equipment room provides good heat insulation, and the walls and floor are dampproof.  Install a rat guard at the door of the equipment room. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 13: Mechanical Safety

    Before hoisting objects, ensure that hoisting tools are firmly secured onto a load-bearing object or wall.  Ensure that the angle formed by two hoisting cables is no more than 90 degrees, as shown in the following figure. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 14 Do not climb higher than the fourth rung of the ladder from the top.  Ensure that your body's center of gravity does not shift outside the legs of the ladder. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 15 Metal shavings from drilling may short-circuit boards inside the equipment.  Obtain the consent from the customer, subcontractor, and Huawei before drilling.  Wear goggles and protective gloves when drilling holes. ...
  • Page 16: Cooling System Safety

    1.7 Pre-fab. Module Safety  Ensure that the installation environment meets the following requirements: − The ground must be solid without spongy or soft soil, and is not prone to subsidence. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 17: Battery Safety

    If a battery is disposed of improperly, it may explode.  The site must be equipped with qualified fire extinguishing facilities, such as firefighting sands and powder fire extinguishers. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 18 Commissioning Guide 1 Safety Information To ensure battery safety and battery management accuracy, use batteries provided with the UPS by Huawei. Huawei is not responsible for any battery faults caused by batteries not provided by Huawei. Battery Installation Before installing batteries, observe the following safety precautions: ...
  • Page 19: Others

    UPS output voltage level or frequency. Doing so may affect the power supply to equipment.  Exercise caution when setting battery parameters. Incorrect settings will affect the power supply and battery lifespan. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 20: Precautions For Power-On Commissioning

    Operations marked as optional in chapters, sections, or procedures can be performed depending on the actual situation.  Huawei assumes no liability for any loss caused by unauthorized changes to the initial configuration parameters. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 21: General Power-On Commissioning Process

    FusionModule1000A40 Prefabricated All-in-One Data Center Commissioning Guide 3 General power-on commissioning process General power-on commissioning process Figure 3-1 shows the general power-on commissioning process. Figure 3-1 General power-on commissioning process Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 22: Preparations For Power-On Commissioning

    Table 4-1 Tools Tools Phillips screwdriver Flat-head screwdriver Utility knife Multimeter Electroprobe Network cable tester Cable tie Insulation tape Marker ESD gloves Step ladder (2 m) ESD wrist strap Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 23 This table may not list some tools required at specific sites. Onsite installation personnel and technical support personnel should prepare tools based on site requirements.  Some dedicated tools and installation materials provided with the equipment may not be listed in this table. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 24: Reference Documentation

    4 Preparations for Power-On Commissioning 4.2 Reference Documentation Table 4-2 Required documentation Item Document Name Prefabricated FusionModule1000A40 Prefabricated All-in-One Data Center all-in-one data center V200R003 Initial Configuration Parameter Manual UPS5000-E-(50 kVA–125 kVA) User Manual (Integrated UPS Integrated UPS 3.0) UPS5000-E-(20 kVA–80 kVA) User Manual (Integrated UPS,...
  • Page 25: Preparing For The Power Supply And Distribution System Power-On Commissioning

    Step 3 Understand the initial configurations of the power supply and distribution system by referring to the power supply and distribution device initial configuration table. ----End Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 26: Preparing For The Cooling System Power-On Commissioning

    If σ is greater than 1250 μS/cm, the humidifier service life is affected.  b: If the water hardness exceeds 100 mg/L (CaCO ), a water softener should be installed. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 27: Preparing For The Management System Power-On Commissioning

    Step 3 Understand the initial configurations of the management system by referring to the management system initial configuration table. The passwords and parameters must be the same as those in the initial configuration parameter manual for the solution in use. ----End Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 28: Preparing For The Fire Extinguishing System Power-On Commissioning

    Step 1 Understand the layout of fire extinguishing devices by referring to the fire extinguishing device layout diagram. Step 2 Understand the running of the fire extinguishing system by referring to the fire extinguishing system conceptual diagram. ----End Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 29: Check Before Power-On

    The motor operation mechanism is distribution set to system Power cable Measure the insulation of the There is no electricity leakage in the insulation power cables using an insulation power supply and distribution system. megohmmeter. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 30 Outdoor unit Check the outdoor unit air intake Outdoor unit air intake and exhaust air intake and and exhaust vents. vents are not blocked. exhaust vents Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 31  Lighting Component Check the lighting device Devices are installed in positions system installation and installation and connection. shown in the lighting device layout connection diagram.  Cables are correctly connected. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 32: Power-On Commissioning

    FusionModule1000 level by level. For equipment with dual power inputs, circuit breakers of both power inputs must be switched on. Step 3 Verify that the power-on process is normal. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 33 The indicator on the power module is green. AI/DI module The PWR and RUN indicators are Smart ETH gateway The PWR and RUN indicators are The PWR, RUN, and RF_Z AC actuator indicators are on. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 34 Pneumatic switch Electrical actuator Horn strobe Warning sign (Optional) VESDA VESDA power box VESDA power-on The VESDA power indicator is on, commissioning and there is no alarm in the management system. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 35 Initial configurations must be verified before the first power-on after installation or restart after a long power-off period.  Equipment with initial configurations can be powered on only after the initial configurations are verified. ----End Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 36: System Commissioning

    Step 2 Remove one power plug for the server or switch off the corresponding rPDU input circuit breaker in the PDC. Step 3 Power on the server 30s later. Check that the server works properly and does not restart or break down. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 37: Commissioning The Logic Load Disconnection (Powering-Off) Of The Power Supply System Under Normal Temperature

    Switch off circuit breakers level by level to power off devices by referring to the power supply and distribution system diagram. Switch off the external input power circuit breaker of the FusionModule1000. Step 2 Verify whether the system and devices are intact and working properly. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 38: Commissioning The Cooling System

    If the error is about 1° C, the cooling product is working properly. Step 3 Change the temperature setting back to the initial setting specified in the cooling device initial configuration table. ----End Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 39: The Management System Commissioning

    The FusionModule1000 is powered on, commissioned, and working properly. During the commissioning, if any alarm is raised, clear the alarm before continuing the commissioning. Preparations Tool: network cable tester Documents: monitoring device layout diagram, management system initial configuration table Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 40: Optional) Configuring The Ip Address For An Outdoor Camera

    Verify that all devices in the initial configuration table communicate with the management system properly. Check that the views and videos in the management system are consistent with the running status of the data center. If any inconsistency is found, contact Huawei technical support. ----End 7.3.3 (Optional) Configuring the IP Address for an Outdoor...
  • Page 41 Choose Settings > System Configuration > Storage Management. The Storage Management page is displayed. Format the SD card. Figure 7-2 Formatting the SD card Set the camera stream type and primary stream parameters. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 42 Frame Rate I-frame Minimum Supported Protocol Interval Required Video Bit Rate Storage Duration H.265 1080P H.264 1080P H.265 720P 0.8M H.264 720P H.265 720P 0.6M H.264 720P 0.8M Set motion detection parameters. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 43 7 System Commissioning Figure 7-4 Setting motion detection parameters Set the deployment policy. Figure 7-5 Setting the deployment policy Set the alarm linkage policy. Figure 7-6 Setting the alarm linkage policy ----End Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 44: Fire Extinguishing System Commissioning (Ce)

    Step 3 Switch on the input circuit breaker of the extinguishant control panel, and connect the battery cables to the extinguishant control panel. Step 4 Flip the key leftward to Auto & Manual, and set the extinguishant control panel to Auto & Manual. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 45 A smoke detector loop alarm is triggered, and the loop 1 fire alarm indicator on the extinguishant control panel is steady on. The fire alarm bell rings.  Do not clear the alarm and proceed to the alarm simulation for the smoke detector. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 46 A heat detector loop alarm is triggered, and the loop 2 fire alarm indicator on the extinguishant control panel is steady on. The horn strobe is triggered, and the warning sign blinks. The Release Imminent indicator on the extinguishant panel turns on, and the release countdown starts. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 47 The extinguishant control panel generates a LOCAL FIRE alarm, and Extinguishant Release indicator turns on. The warning sign is steady on.  LOCAL FIRE terminal generates a LOCAL FIRE alarm signal. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 48 Hold the smoke detector, and rotate it counterclockwise to remove it from the base. The extinguishant control panel reports a loop 1 FAULT RELAY, and the loop 1 FAULT RELAY indicator turns on. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 49 Figure 7-16 Loop 2 FAULT RELAY indicator on Hold the heat detector, and rotate it clockwise to install it to the base. Step 12 (Optional) Check whether the fire alarm signals are reported to the management system. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 50 Step 13 Flip the Enable Control key rightwards, reset the extinguishant control panel by pressing Reset on it, and then flip the Enable Control key leftwards to reset the key. ----End Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 51: Commissioning Core Components

    This step applies only to the 40 ft N+X scenario. Step 2 Switch on the general input circuit breaker and the input power circuit breaker of the integrated UPS to power on the integrated UPS. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 52 UPS.  During the UPS power-on commissioning, you are not allowed to modify the UPS initial configurations if not authorized by onsite Huawei engineers.  UPSs can work in single or parallel mode. Check that the initial configurations are consistent with the configurations in the initial configuration table for the solution in use.
  • Page 53 100 Ah/12 V 32 batteries Two battery 32 x 6 = 192 100 Ah + 100 connected in strings Ah = 200 Ah series connected in parallel to the Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 54: Commissioning The Mdu

    Skill requirement: power distribution engineer Context Figure 8-3 shows the front view of the MDU. The MDU allows you to set integrated UPS parameters, view the running status and alarms, and upgrade software. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 55 A warning has been generated for the integrated UPS, or the Green system is running properly. The LCD of the integrated UPS has experienced a power failure. Figure 8-4 shows the MDU ports. Table 8-3 describes the ports. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 56 NOTE Only Huawei service engineers or authorized service engineers are allowed to use the WiFi module. To ensure security, remove the WiFi module immediately after use. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 57: Commissioning Air Cooled Smart Cooling Products

    During the MDU power-on commissioning, you are not allowed to modify the MDU initial configurations unless you are authorized by onsite Huawei engineers. Step 3 Enter a user name and password to access the MDU, set the user name, password, time, and language, and check that the initial parameter settings are correct.
  • Page 58 Before power-on, clear dust, dirt, and foreign matter from the cabinet; otherwise, the water pump may be blocked, resulting in drainage failure or serious equipment malfunction. Step 3 Verify the initial configuration of the air cooled smart cooling product. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 59: Initial Dip Switch Configuration For T/H Sensors

    Huawei engineers. Step 4 Tap Indicates on the main screen, and tap Confirm on the dialog box that appears. If the start succeeds, the system prompts that the command is successfully executed.
  • Page 60: Initial Dip Configuration For The Main Control Board

    You need to set the DIP switch on the main control board of a smart cooling product before starting the cooling product. Figure 8-6 shows ports on the main control board of a smart cooling product. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 61 DIP switch configuration table for the main control board of the air-cooled smart cooling product. Step 2 If any DIP switch setting is inconsistent with the initial setting, change it to the initial setting. ----End Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 62: Teamwork Initial Configuration

    1 on the LCD is the master, which collects, processes, and delivers data. Figure 8-8 shows the teamwork topology for air-cooled smart cooling products. Figure 8-8 Teamwork topology Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 63 Background color: Red background color indicates that an emergency alarm red/bright gray/dark is generated, gray as shown in Bright gray background color indicates that no emergency alarm is generated, Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 64 Network, Total number of units, Number of running units, Standby mode rotation, Rotation period, Rotation time, Forced rotation, Requirement control, and Cascade. However, a slave device only supports parameters like Teamwork unit no., Teamwork unit address, and Teamwork function. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 65 FusionModule1000A40 Prefabricated All-in-One Data Center Commissioning Guide 8 Commissioning Core Components Figure 8-9 Teamwork setting screen 1 Figure 8-10 Teamwork setting screen 2 Figure 8-11 Teamwork settings screen 3 Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 66 If the heat load varies greatly, it is recommended that you enable the iCooling mode. The Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 67 Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 68 The smaller the module and the higher the load power, the greater the temperature rise rate is. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 69 Check whether the number of online devices in the topology is the same as the actual number of devices. − If yes, the check is complete. − If no, check the cable connection and the teamwork settings. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 70: Initial Configuration Of Temperature And Humidity

     You need to obtain permission before changing system settings. Only trained and qualified personnel can change settings excluding the control type and set point of the T/H sensor. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 71 EMS to start or shut down the smart cooling product. Figure 8-14 System control screen Step 3 Tap Settings > System Settings > T/H Sensor on the home screen to enter the screen shown Figure 8-15. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 72: Commissioning Monitoring Components

    ECC800. Table 8-6 Default IP addresses for the WAN and LAN ports on the ECC800 Port Default IP Address WAN_1 192.168.1.10 WAN_2 192.168.0.10 LAN_1 and LAN_2 192.168.248.10 Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 73 Click the Advanced tab and select Use TLS1.1 and Use TLS1.2. (Optional) Click the Connections tab and select LAN settings. (Optional) On Proxy server, clear Use a proxy server for your LAN. Click OK. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 74 WebUI. Choose Tools > Compatibility View, and add the web access address to the compatibility view. Add the ECC800 IP address to the list of trusted sites. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 75 When switching between different versions of the ECC800 on your PC, you are advised to clear the historical Internet Explorer cache. Failing to do so may cause some information missed or exception after login. The following provides the details: Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 76: Commissioning Access Control Components

    After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
  • Page 77: Commissioning Fire Extinguishing Devices

    8.4 Commissioning Fire Extinguishing Devices 8.4.1 Commissioning the Extinguishant Control Panel (CE) Context Initial configuration parameters have been set for the extinguishant control panel before delivery and do not need to be set onsite. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 78: Commissioning The Emergency Light (Ce)

    Skill requirement: fire engineer For the diagrams, see the initial configuration parameter manual for the solution in use. Procedure Step 1 Turn off the upstream switch of the emergency light power cable. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 79 The emergency light turns off, and the power indicator turns on. Step 6 Press the red button of the emergency light. The emergency light turns on. When you release the red button, the emergency light turns off. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 80: Optional) Commissioning The Vesda

    Step 3 Release smoke in the protected area using the smoke pistol. Verify that the VESDA alarm indicator lights up, and that an alarm is generated in the management system. Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 81 FusionModule1000A40 Prefabricated All-in-One Data Center Commissioning Guide 8 Commissioning Core Components After the operation is complete, press the reset button to reset the VESDA. ----End Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.
  • Page 82: A Acronyms And Abbreviations

    Acronyms and Abbreviations automatic transfer switch Conformite Europende power distribution cabinet power distribution unit rPDU rack power distribution unit uninterruptible power system video cloud node VESDA very early smoke detection apparatus Issue 04 (2020-01-17) Copyright © Huawei Technologies Co., Ltd.