Installing the Switch
Verifying the Switch Chassis Installation

Step 3

Turn on the power supply switches to power up the system. During the power-up sequence, the system performs
a series of bootup diagnostic tests.
What to do next
Additional system diagnostic tests are also available. These tests allow you to perform a complete sanity check
on the system prior to inserting the system into your network and to monitor the health of the system while
the system is running.

Tip

When prestaging systems in a nonproduction environment, we recommend that you run all the diagnostic
tests, including the disruptive tests, to prescreen the systems for failures, if any.