Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Installation Flow Start Page 1 Precautions Preparation installation Page 2 Tools for Installation Pages Introduction to the 1U- height Chassis Introduction to the 2U- Page 5 height Chassis Introduction to the Page 6 APM30H Cabinet Cabinet Sharing Page 7 Installing the NE Equipment in the APM30H Page 8 Separate Outdoor...
Page 4
Precautions NOTE This document provides simple and distinctive guidelines for quick hardware installation of the NE05E&NE08E(NE05E-S2/SE/SF/SG/SH/SI/SQ&NE08E-S6/S6E). Based on the height of a device, the NE05E-S2/SE/SF/SG/SH/SI/SQ are considered 1 U devices, and the NE08E-S6/S6E are considered 2 U devices. 1 U = 44.45 mm (1.75 in.) As the installation methods are similar, the fixed NE05E-SF is used as an example for the 1 U device, and the card-inserted NE08E-S6 is used as an example for the 2 U device.
Page 6
Introduction to the 1U-height Chassis NE05E-S2 NM interface Power supply interface PGND point Antistatic jack interface (Console interface) Clock and time interface FE/GE optical Alarm interface GE optical interface interface SHDSL interface FE/GE electrical interface T1 interface NE05E-SE/NE05E-SF PGND point 10GE optical interface Power supply interface NM interface...
Page 7
NE05E-SG/NE05E-SH/NE05E-SI/NE05E-SQ NM interface Power supply interface PGND point GE optical interface (Console interface) FE/GE optical interface Clock interface Alarm interface Time interface Electrical interface E1 interface Antistatic jack interface Clock interface NM interface Power supply interface (Console interface) 10GE optical interface FE/GE optical interface Alarm interface FE/GE electrical interface...
Page 8
Introduction to the 2U-height Chassis NE08E-S6 Power supply interface Antistatic jack interface NM interface Clock interface (Console interface) Time interface Alarm interface GE optical interface PGND point E1 interface Electrical interface NE08E-S6E Power supply interface Antistatic jack interface NM interface Clock interface (Console interface) Time interface...
Page 9
Introduction to the APM30H Cabinet APM30H机柜介绍 View of the APM30H Cabinet Technical Specifications •Dimensions: 700 (H) x 600 (W) x 480 (D) •Ambient temperature: -40°C to +50°C •Sunshine radiation: 1120±10%W/m •Allowable heat dissipation:≤700 W The Internal Structure of the APM30H Cabinets Fan board (internal circulating) CMUA board PSU module...
Page 10
Installation Scenarios of NE Equipment Cabinet Sharing Installing NE equipment in the APM30H cabinet together with BBU 2U-height chassis 1U-height chassis Fan unit Fan unit SLPU SLPU Power supply Power supply system system ATN 950B NE05E-SF NE08E-S6 Heater Heater NOTE By default, the heater (optional) is installed in the lowest part of the cabinet.
Page 11
Installing the Assemblies Installing the NE Equipment in the APM30H Cabinet Fixing the Floating Nuts Use a marker to mark the location Floating nut where a floating nut is required. Ensure Installation hole that floating nuts are installed on the right locations.
Page 12
In the case of more than 12 E1 signals, the UFLP board needs to be removed and replaced with the UELP board. The removed UFLP board needs to be returned to the local representative office of Huawei.
Page 13
Installing the SOU in the APM30H Cabinets (Optional) Specification of the SOU American standard European standard Multi-purpose UK standard NOTE •The SOU provides the transit function for the AC equipment of a customer and is an optional component. •Configured with the four outlet types, the cabinets support different SOU types of different countries. •The SOU is preferably installed in the bottom 1U space of the cabinet.
Page 14
Installing the Heater in the APM30H Cabinets (Optional) Install the heater. The heater is preferably installed in the bottom If both the SOU and the heater are installed in the 1U space of the cabinet. cabinet, the heater is installed above the SOU. NOTE When the temperature inside the cabinet is lower than 0°C, the heater starts working.
Connecting and Routing Cables Common Cables for the Chassis PGND cable AC power cable DC power cable Fiber Shielded network cable E1 cable (120-ohm ) E1 cable (75-ohm ) Connecting the PGND Cables Grounding Grounding PGND cable PGND cable of the SLPU PGND of the SLPU PGND...
Connecting the Power Cables Connecting the AC Power Cables NE05E-SI ATN 910 I AC The peer terminal of the power cable, whose model is M4, is connected to the power distribution box on the left side of the cabinet. The OT terminal must be assembled on site.
Connecting the DC Power Cables ATN 950B Cable bridge Binding strap -48V NOTE •For methods of Assembling the Easy Power Receptacle (Pressfit Type) Connector, see Appendix 2. •When routing power cables, make sure that the power cables are far from the E1 cable, fiber, and network cable.
Connecting the Service Cables for the Equipment Connecting E1 Cables Determine the number of plugs to be connected to the SLPU for this end of the E1 cable as required, and insert the plugs to the INSIDE interfaces. If the E1 cable is led out of the cabinet, an SLPU must be installed.
Connecting fibers WARNING Laser When handling optical fibers, do not stand close to or look into the optical fiber outlet directly with naked eyes. Fiber binding strap These fiber are led to an ODF FE 0 FE 1 FE 0 FE 1 UFLP IN SID E...
Installation Checklist 安装检查 Item The cabinet is neat and clean. And the cabinet meets the dustfree requirement. The paint on the surface of the cabinet is intact. All the bolts are tightened, especially for electrical connections. The flat washers and spring washers are installed completely and properly.
Powering On the Equipment Powering On the Equipment Check the voltage and the fuse capacity of the external power supply NOTE For running an AC NE05E-SQ, you must turn on the switches of both AC power modules operating in 1+1 backup mode. Standard Voltage of the Input Power Supply Allowed Voltage Range for Equipment...
Page 22
Check the power-on status Use the NE05E-SI as an example for an AC device: The board hardware is faulty Indicator State Description State Description Indicator On and green The power supply is normal. The power supply fails. STAT On and green The board is working normally.
Page 23
Checking Tail Fiber Connection External cable Fiber jumper connected to the OUT port Optical power Optical power meter meter NOTE •To check tail fiber connection, you need to check the deviation of the optical power between an optical interface on the board and the peer interface on the ODF.
Page 24
Appendixes Layout of the Cable Holes Layout of the cable holes at the right Layout of the cable holes at the left bottom of the cabinet: bottom of the cabinet: Cable Name Cable Hole Cable Hole Code Input power cable of the cabinet Cable hole on the left Any of the three Input power cable of the heater...
Page 25
Assembling the Easy Power Receptacle (Pressfit Type) Connector 1. Material: easy power receptacle (pressfit type) connector, contact terminal, heat-shrinkable tube, and cable 2. Procedure for assembling the easy power receptacle (pressfit type) connector Strip the jacket off the cable according to the scale Push the sliding block by using a screwdriver until on the equipment.
Page 26
Assembling OT Terminals Material: OT terminals (ring terminals) , heat-shrinkable tube and cable. Press the end of the contact terminal on the Strip a part of the jacket off the cable to expose the conductor by using the crimping tool. conductor with a length of L1.
Page 27
Paint Repair 1. Codes of Color Samples Object Color Name Huawei Color Code International Color Code Cabinets (including the APM30H) RAL7035 YB026 RAL7035 Base 3010 light grey YB030 Pontone 422U 2. Operation Instructions Polishing If a damaged area is stained or the materials are rusty, polish the damaged area or the rusty materials by using a piece of fine sand paper to remove the stain or rust.
Page 28
Applying Grease to the Required Positions Install the cable frame in the APM30H cabinet. Before installing the rubber blocks for leading out the cables, apply the grease to evenly cover the surface and gaps of the blocks, and then insert the three rubber blocks into the cable frame. Grease Insert the rubber caps into the cable module after covering the caps with grease, cover the jackets of the cables with...
Page 29
HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base Bantian Longgang Shenzhen 518129 People’s Republic of China www.huawei.com...