hit counter script
Download Print this page
Cisco UCS S3260 Service Note
Cisco UCS S3260 Service Note

Cisco UCS S3260 Service Note

Pcba disassembly for commission regulation (eu) 2019/424
Hide thumbs Also See for UCS S3260:

Advertisement

Quick Links

Cisco UCS S3260 Storage Server PCBA Disassembly For Commission
Regulation (EU) 2019/424 Service Note
First Published: 2020-02-24
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883

Advertisement

loading

Summary of Contents for Cisco UCS S3260

  • Page 1 Cisco UCS S3260 Storage Server PCBA Disassembly For Commission Regulation (EU) 2019/424 Service Note First Published: 2020-02-24 Americas Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 http://www.cisco.com Tel: 408 526-4000 800 553-NETS (6387) Fax: 408 527-0883...
  • Page 2 © 2020 Cisco Systems, Inc. All rights reserved.
  • Page 3 Considerations for Battery Replacement Considerations for Battery Recycling C H A P T E R 3 Recycling the PCB Assembly (PCBA) Recycling the PCB Assembly (PCBA) Cisco UCS S3260 Storage Server PCBA Disassembly For Commission Regulation (EU) 2019/424 Service Note...
  • Page 4 Contents Cisco UCS S3260 Storage Server PCBA Disassembly For Commission Regulation (EU) 2019/424 Service Note...
  • Page 5: Overview

    This document provides information to recyclers about how to disaasemble the UCS S3260 Storage Server printed circuit board assembly (PCBA) to comply with ewaste and eco design requiements for Commission Regulation (EU) 2019/424. This document is an addendum to the Cisco UCS S3260 Storage Server Chassis Installation and Service https://www.cisco.com/c/dam/en/us/td/docs/unified_computing/ucs/s/hw/S3260/installb/S3260.pdf Guide which contains additional hardware installation and maintenance procedures for the Cisco UCS S3260 Storage Server.
  • Page 6 Overview Overview Cisco UCS S3260 Storage Server PCBA Disassembly For Commission Regulation (EU) 2019/424 Service Note...
  • Page 7: Considerations For Battery Replacement

    Cisco UCS S3260 Storage Server. For inforamtion about the RTC battery and battery installation and replacement procedures, see "Replacing an RTC Battery Inside the Server Node" in the Cisco UCS S3260 Storage Server Chassis Installation and Service Guide. Go to https://www.cisco.com/c/dam/en/us/td/docs/unified_computing/ucs/s/hw/S3260/installb/...
  • Page 8 Considerations for Battery Replacement Considerations for Battery Recycling Cisco UCS S3260 Storage Server PCBA Disassembly For Commission Regulation (EU) 2019/424 Service Note...
  • Page 9: Recycling The Pcb Assembly (Pcba)

    System" in the Cisco UCS S3260 Storage Server Chassis Installation and Service Guide. Go to https://www.cisco.com/c/dam/en/us/td/docs/unified_computing/ucs/s/hw/S3260/installb/S3260.pdf. • The server must be removed from the equipment rack. • The server's top cover must be removed. See in the Cisco UCS S3260 Storage Server Chassis Installation and Service Guide. Go to https://www.cisco.com/c/dam/en/us/td/docs/unified_computing/ucs/s/hw/S3260/ installb/S3260.pdf.
  • Page 10 Reach down to grasp the SSD backplane cable connectors, then disconnect the cables from the SSD backplane and Midplane assembly. d) Cut the cable tie that secures the SSD backplane cables to the chassis. Cisco UCS S3260 Storage Server PCBA Disassembly For Commission Regulation (EU) 2019/424 Service Note...
  • Page 11 Lift the Midplane assembly straight up to disconnect it from its sockets and remove it from the chassis. The following image shows the locations of these components. Cisco UCS S3260 Storage Server PCBA Disassembly For Commission Regulation (EU) 2019/424 Service Note...
  • Page 12 Figure 5: Location of Mounting Screws, Bus Bar Modules, Midplane Bracket, and Midplane PCBA (Top Down View) Step 6 Remove the drive cage mounting screws from the front of the chassis. The following illustration shows these screws. Cisco UCS S3260 Storage Server PCBA Disassembly For Commission Regulation (EU) 2019/424 Service Note...
  • Page 13 If the ribbon cables for the FPC connectors cause resistance when you lift the drive cage, pull the cables to detach them from the drive cage. The following image shows the screws and components. Cisco UCS S3260 Storage Server PCBA Disassembly For Commission Regulation (EU) 2019/424 Service Note...
  • Page 14 The following image shows the location of the screws. Figure 8: Location of Mounting Screws for Motherboard Step 10 Dispose of the motherboard, PCBA, and all other removed components properly. Cisco UCS S3260 Storage Server PCBA Disassembly For Commission Regulation (EU) 2019/424 Service Note...