Page 1
FusionModule500 Smart Mini Data Center User Manual (ECC800e) Issue Date 2019-12-20 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
About This Document Purpose This document describes the FusionModule500 Smart Mini Data Center (smart module for short) in terms of its installation, commissioning, operation, and maintenance. The user interface (UI) snapshots in this document correspond to the software version V100R002C00.
Page 4
FusionModule500 Smart Mini Data Center User Manual (ECC800e) About This Document Symbol Description injury. Supplements the important information in the main text. NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. Change History Changes between document issues are cumulative.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) Contents Contents About This Document ........................ii 1 Safety Information ........................1 1.1 General Safety ................................1 1.2 Personnel Requirements ............................... 4 1.3 Electrical Safety ................................4 1.4 Installation Environment Requirements ........................6 1.5 Mechanical Safety ................................
Page 7
FusionModule500 Smart Mini Data Center User Manual (ECC800e) Contents 2.2.7.4 (Optional) Installing the Infrared Remote Control Module .................. 54 2.2.7.5 (Optional) Installing the Pad ..........................54 2.2.7.6 (Optional) Installing the Micro SD Card ......................57 2.2.7.7 (Optional) Installing the WiFi Converter ......................57 2.2.7.8 (Optional) Installing a SIM Card ..........................
Page 8
FusionModule500 Smart Mini Data Center User Manual (ECC800e) Contents 3.2 Power-on Commissioning for the Monitoring System ..................... 103 3.2.1 Preparations and WebUI Login ..........................103 3.2.2 Preparations and App Login........................... 105 3.2.3 Setting the Cabinet Type ............................106 3.2.4 Setting the Date and Time ............................106 3.2.5 (Optional) Setting Independent Deployment AI/DI Unit Parameters ..............
Page 9
FusionModule500 Smart Mini Data Center User Manual (ECC800e) Contents 4.5.2.4 Replacing the Transformer Fan Fuse ........................171 4.5.2.5 Replacing the Transformer ..........................172 4.5.2.6 Replacing the Circuit Breaker on PDU5000 ....................... 174 4.5.2.7 Replacing a PDU5000 ............................175 4.5.2.8 Replacing a Battery Switch Trip Board ......................177 4.5.2.9 Replacing a Battery Switch Tripper ........................
The "NOTICE", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
Page 11
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 1 Safety Information Before installing, operating, or maintaining the equipment, remove any conductive objects such as watches or metal jewelry like bracelets, bangles, and rings to avoid electric shock. When installing, operating, or maintaining the equipment, wear dedicated protective gears such as insulation gloves, goggles, and safety clothing, helmet, and shoes, as shown in the following figure.
Page 12
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 1 Safety Information All cable holes should be sealed. Seal the used cable holes with firestop putty. Seal the unused cable holes with the caps delivered with the cabinet. The following figure shows the criteria for correct sealing with firestop putty.
Do not power on the equipment before it is installed or confirmed by professionals. 1.2 Personnel Requirements Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations.
Page 14
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 1 Safety Information Do not connect or disconnect power cables with power on. Transient contact between the core of the power cable and the conductor will generate electric arcs or sparks, which may cause fire or personal injury.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 1 Safety Information Wear ESD gloves or a well-grounded ESD wrist strap when touching the device or handling boards or application-specific integrated circuits (ASICs). When holding a board, hold its edge without touching any components. Do not touch the components with your bare hands.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 1 Safety Information Installation at Heights Working at heights refers to operations that are performed at least 2 meters above the ground. Do not work at heights if the steel pipes are wet or other potential danger exists. After the preceding conditions no longer exist, the safety director and relevant technical personnel need to check the involved equipment.
Page 17
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 1 Safety Information Do not drag steel ropes and hoisting tools or bump hoisted objects against hard objects during hoisting. Using Ladders Use wooden or fiberglass ladders when you need to perform live working at heights.
Page 18
Metal shavings from drilling may short-circuit boards inside the equipment. Obtain the consent from the customer, subcontractor, and Huawei before drilling. Wear goggles and protective gloves when drilling holes. ...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 1 Safety Information 1.6 Cooling System Safety Welding At least two persons are required on a welding site. A welder must have a work permit. A welding site must be free from inflammables.
The site must be equipped with qualified fire extinguishing facilities, such as firefighting sands and powder fire extinguishers. To ensure battery safety and battery management accuracy, use batteries provided with the UPS by Huawei. Huawei is not responsible for any battery faults caused by batteries not provided by Huawei. Battery Installation Before installing batteries, observe the following safety precautions: ...
Page 21
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 1 Safety Information Note the polarities when installing batteries. Do not short-circuit the positive and negative poles of the same battery or battery string. Otherwise, the battery may be short-circuited. ...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 1 Safety Information Lithium Battery The safety precautions for lithium batteries are similar to those for lead-acid batteries except that you also need to note the precautions described in this section. There is a risk of explosion if a battery is replaced with an incorrect model.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Installation 2.1 Installation Preparations 2.1.1 Tools and Instruments Prepare the tools and instruments required for installation. Table 2-1 General tools and instruments Name, Specifications, and Appearance Protective gloves Marker Measuring tape (5 m)
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Check Item Specifications Check Result module, the room temperature should be in the range of 18° C to 27° C. □ Passed □ Failed Operating humidity 5–95% RH □ Passed □ Failed...
C Bearing Capacity Assessment. If any of the requirements is not met, contact Huawei technical support. 2.1.3 Site Equipment Preparation All cabinets and devices have been delivered to the site and checked against the delivery list.
Only trained and qualified personnel who fully understand basic safety precautions are allowed to install and operate a modular data center. Huawei will not be liable for any consequence caused by the violation of this document. The requirements are as follows: ...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation 2.2 Installing Components 2.2.1 Installation Scenario (Single-Phase 220 V Power System) 24 U Single Cabinet Scenario Figure 2-1 24 U single cabinet scenario Table 2-3 Components in the 24 U single cabinet scenario...
Page 29
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Name Installed Onsite Cables Connected Onsite sensor Water sensor Required Required Smoke sensor Not required Not required ECC800e Not required Not required Power distribution Not required Not required unit 2000 (rPDU for short) The 24 U cabinet does not allow for the installation of the pad.
Page 30
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-2 42 U single cabinet scenario Table 2-4 Components in the 42 U single cabinet scenario Component Installed Onsite Cables Connected Onsite Door status sensor Not required Not required...
Page 31
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Component Installed Onsite Cables Connected Onsite an example) (10) Water sensor Required Required (11) ECC800e Not required Not required (12) Smoke sensor Not required Not required 42 U multi-cabinet scenario Two, three, and four cabinets are included in the 42 U multi-cabinet scenario.
Page 32
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Table 2-5 Components in the 42 U four-cabinet scenario Component Installed Onsite Cables Connected Onsite (Optional) Camera Required Required (Optional) T/H Required Required sensor NOTE For an 800 mm...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation 2.2.2 Installation Scenario (Dual-Live Wire 208 V Power System) 42 U Single Cabinet Scenario Figure 2-4 shows the components in the 42 U single cabinet scenario. Figure 2-4 42 U Single Cabinet Scenario...
Page 34
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Component Installed Onsite Cables Connected Onsite (Optional) Camera Required Required T/H sensor Not required Not required (Optional) LAN Required Required switch (Optional) Server Required Required VCN (optional, the (10) Required...
Page 35
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-5 42 U four-cabinet scenario (front view) For details on the converged cabinet, see the single cabinet scenario. In the two-cabinet scenario (one converged cabinet and one battery cabinet), a standalone AI/DI module can be installed in the 42 U position on the top of rear side of the battery cabinet.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Component Installed Onsite Cables Connected Onsite network cabinet. (Optional) Door Required Required status sensor NOTE Install the door status sensor (optional) on the rear side of the cabinet in the position...
Page 37
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-6 Removing the cabinet from the shipment pallet At least three or four persons are required to move a battery pack as it is very heavy. Place the two casters at the same side panel to the ground, avoid single casters to support the whole cabinet, and then remove the shipment pallet from the back of the ground panel.
Page 38
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Do not remove anchor bolts. Otherwise, you need to rework them for use. You can use a wrench, socket, or screwdriver to adjust anchor bolts. Rotate anchor bolts clockwise to raise the cabinet and rotate them counterclockwise to lower the cabinet.
Page 39
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-8 Inserting rubber plugs Step 6 (Optional) Combine cabinets. Level adjacent cabinets. Adjust the anchor bolts of other cabinets based on a leveled cabinet and ensure that adjacent cabinets are of the same height.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-9 Combining cabinets Install other cabinets at a time in the same way. ----End 2.2.3.2 Installing the Cabinet on an ESD Floor Context A support is required when the cabinet is installed on an ESD floor. The support height depends on the height between the ground and the ESD floor.
Page 41
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-10 Leveling and fixing bolts (1) Anchor bolt (2) Fixing bolt (3) Level Step 4 (Optional) Combine cabinets. Level adjacent cabinets. Remove the screws that securing connecting kits from the cabinet, take off the connecting kits, and properly store the removed screws.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation 2.2.4 Installing the Cabinet (with an Antiseismic Kit) Context Figure 2-12 Cabinet rear door (1) Door head (2) Side panel (3) Door sill (4) Door status sensor (5) Rear door...
Page 45
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-14 Mounting holes for a 42 U cabinet Step 2 Use a hammer drill to drill six holes for installing expansion bolts and then install six expansion bolts in the holes.
Page 46
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Knock the expansion bolts into the holes until the expansion tube completely fits into the hole. The expansion sleeves must be completely buried under the ground to facilitate subsequent installation.
Page 47
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-17 Installing L-shaped ground fasteners Step 6 Install angle stiffeners on the top of the cabinet front and rear. Remove the door head from the top of the cabinet.
Page 48
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-18 Installing stiffeners on the top of the cabinet Install captive plates on the cabinet front and rear. Figure 2-19 Installing captive plates Step 7 Install angle stiffeners at the bottom of the cabinet front and rear.
Page 49
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-20 Installing stiffeners at the bottom of the cabinet Install a new door sill at the bottom of the cabinet. Step 8 Install oblique beams as well as the beams in the front and rear and on the left and right based on requirements.
Page 50
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-21 Front and right sides of the cabinet Each beam on the left and right is secured using eight tapping screws, among which the four in the middle are tightened from the cabinet interior.
Page 51
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-22 Cabinet rear Step 9 Reinstall the ground cables, front and rear doors, side panels, and door status sensor. Step 10 (Optional) If multiple cabinets are installed, combine the cabinets.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-23 Combining cabinets Install other cabinets at a time in the same way. ----End 2.2.5 (Optional) Installing a Battery Pack Context For a 24 U cabinet, install battery packs at the 2 U or higher positions above the cabinet bottom.
Page 53
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation If only one battery pack is configured, install the battery pack in the 3 U space below the UPS. In the transportation scenario, the battery pack must be transported without boards.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Putting the guide rail between the notches on the rack rail facilitates locating the installation position. Step 4 Push the battery back onto the guide rails, and secure the battery pack to the cabinet rack rails...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-27 Installing an rPDU Step 3 Close the cabinet rear door. ----End 2.2.6.2 (Optional) Installing a Full-Height rPDU Vertically Context If the Converged Cabinet is configured with a full-height rPDU that needs to be vertically installed, install the rPDU onsite.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-28 Installing an rPDU Step 3 Close the cabinet rear door. ----End 2.2.6.3 (Optional) Installing a Half-Height rPDU Vertically Context If the Converged Cabinet is configured with a Half-height rPDU that needs to be vertically installed, install the rPDU onsite.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-31 Equipment layout in the network cabinet 2.2.7.2 Installing a Water Sensor Procedure Step 1 Remove the rodent-proof mesh from the bottom of the cabinet and tailor the mesh.
Page 59
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-32 Removing front and inner covers Gently insert the SD card into the SD card slot, as shown in Figure 2-33. Figure 2-33 Installing an SD card Step 2 Align the mounting holes in the dome camera base with those in the mounting plate, and...
Page 60
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-34 Installing a Camera This camera model provides triple-axis adjustment design. Connect the auxiliary video cable delivered with the camera to a display device such as the monitor. Rotate the camera 0–355 degrees horizontally, 0–75 degrees vertically, or 0-355 degrees in the revolving direction to achieve an appropriate angle.
Page 61
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-36 Installing a camera mounting plate Step 4 Connect the camera monitoring cable. Connect one end of the network cable to the RJ45 port on the camera and the other end to the RJ45 port on the LAN switch.
Page 62
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-37 Installing an inner cover Step 6 Install the front cover of the camera in the direction shown in Figure 2-38, and tighten the screws on the front cover.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation 2.2.7.4 (Optional) Installing the Infrared Remote Control Module Procedure Step 1 Attach the infrared remote control module to the top of the Converged Cabinet. Adjust the installation position of the infrared remote control module depending on the actual condition to ensure that the smart cooling product and infrared remote control module can receive signals normally.
Page 64
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-40 Installing a pad support fastener Step 3 Adjust the width of the pad mounting support to match the pad size. Figure 2-41 Adjustment screws (1) Adjustment screws Step 4 Remove the nut from the pad mounting support, mount the support onto the mounting hole in the front door of the cabinet, and then secure the support to the mounting hole using the nut.
Page 65
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-42 Removing the nut Step 5 Route the pad power cable to the cable hole in the pad mounting support and connect the cable to the pad. Step 6 Adjust the feet on the top of the pad mounting support and clamp the pad to the pad mounting support.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Step 7 Connect the pad charging cable to the USB4 port on the ECC800e. Figure 2-44 Route of a pad charging cable ----End 2.2.7.6 (Optional) Installing the Micro SD Card Procedure Step 1 Insert the Micro SD (SD for short) card into the slot in the ECC800e.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation 2.2.7.8 (Optional) Installing a SIM Card Context If a GSM modem is configured, a SIM card (GSM or WCDMA) should be installed in the GSM modem. Install the SIM card, and you do not have to tailor it.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Step 3 Install the mounting ears delivered with the LAN switch and secure the LAN switch to the rack rails in the front of the cabinet, as shown in Figure 2-46.
Page 69
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-47 Installing guide rails Place the guide rails horizontally at the installation position in the cabinet, as shown by (1) in Figure 2-47. Fix the guide rails using rubber plugs, as shown by (2) in Figure 2-47.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-48 Installing a server Step 4 Connect the server power cables to the rPDU. Figure 2-49 Connecting power cables for the server ----End 2.2.7.11 (Optional) Installing a VCN500 Procedure Step 1 Install guide rails by referring to 2.2.5 (Optional) Installing a Battery...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-50 Placing a VCN500 Step 3 Tighten the captive screws in the ears using a Phillips screwdriver to close the mounting ear buttons, as shown in Figure 2-51. Figure 2-51 Installing a VCN500 Step 4 Connect the VCN500 power cable to the appropriate rPDU.
Page 72
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation the slots where disks are not installed, because removing the filler panels will affect the heat dissipation of fans and generate some noises. Procedure Step 1 Install a hard drive.
Page 73
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-53 Installing the floating nuts (1) Guide rail (2) Floating nut installation position Step 3 Use four screws to configure one mounting ear on the left of the front panel and the same way to configure the other ones on the right side.
Page 74
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-55 Placing a VCN540 Step 5 Put two M6 screws through the slotted holes of one mounting ear and use a Phillips screwdriver to fasten the screws to secure the device to the rack rail at front of the network cabinet.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation 2.2.7.13 (Optional) Installing an Independent Deployment AI/DI Unit Procedure Step 1 Determine the mounting holes for the independent deployment AI/DI unit based on the cabinet layout. Engage floating nuts into appropriate mounting holes in the rack rail of the cabinet using a floating nut mounting bar.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-59 Setting an address ----End 2.2.7.14 (Optional) Installing a Door Status Sensor Procedure Step 1 Open the front and rear cabinet doors. Step 2 Install the door status sensors on the top of the rear door and the left side of the front door of the cabinet.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-60 Installing a door status sensor ----End 2.2.7.15 (Optional) Installing a T/H Sensor 2.2.7.15.1 Installing a T/H Sensor (in the Scenario with 600 mm Wide Network Cabinet) Procedure Step 1 Install a T/H sensor.
Page 78
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-61 Installing a T/H sensor Step 2 Set the toggle switch 2 on the T/H sensor to on. Figure 2-62 DIP switch on a T/H sensor ----End Issue 07 (2019-12-20)
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation 2.2.7.15.2 Installing a T/H Sensor (in the Scenario with 800 mm Wide Network Cabinet) Context From the cabinet front, install the T/H sensor with its network port facing upwards. Figure 2-63 Installation position of the T/H sensor...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Step 2 Set the toggle switch 2 on the T/H sensor to on. Figure 2-64 Setting the DIP switch on a T/H sensor ----End 2.2.7.16 (Optional) Installing BIMs and CIMs...
Page 81
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation In the figure, the circuit breaker panel of the battery cabinet has been removed. After removing the circuit breaker panel, knock off the cover on the CIM indicator hole on the panel.
Page 82
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Use an insulated torque wrench during battery installation. The terminal torque depends on battery specifications. M6: 4–6 N· m. M8: 13–15 N· m. M10: 15–20 N· m...
Page 83
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation After connecting all power cables to the system, connect the cable to the BIM. Figure 2-69 Connecting a BIM Step 2 Install the CIM, as shown in Figure 2-70 Figure 2-71.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Ensure that the attaching area is clean. Ensure that the fastener is firmly attached with even strength. Clamp the CIM to the fastener. Figure 2-71 Installing a CIM ----End 2.3 Installing Cables...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-72 Cables routes from the top of cabinets (unit: mm) (1) Signal cable (2) Power cable 2.3.2 Cable Connections to the Power Supply and Distribution System 2.3.2.1 Connecting Ground Cables ...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-75 PDU5000 ground bar (1) Ground bar 2.3.2.2 Connecting the Mains Power Cable (Single-Phase 220 V Power System) Procedure Step 1 Connect the mains power cable to the terminal on the back of the PDU5000.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-77 Connecting the mains power cable ----End 2.3.2.4 (Optional) Connecting an rPDU Power Cable Procedure Step 1 Connect the power cable for the rPDU in the network cabinet. Connect the cord end terminal of the power cable for the rPDU in the network cabinet to the QF3 circuit breaker on the PDU5000 in the Converged Cabinet.
Page 89
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-78 Connecting an rPDU power cable Reinstall the front panel on the rPDU. Step 2 (Optional) Connect the power cable for the rPDU in the Converged Cabinet. rPDUs can be installed horizontally or vertically. The power cables for both types of rPDUs are connected in the same way.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-79 Connecting an rPDU power cable Reinstall the front panel on the rPDU. ----End 2.3.2.5 (Optional) Installing Battery Strings This topic describes the procedure and precautions for installing batteries and battery cables.
Page 91
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation As flammable gases (hydrogen) are released during battery charge and discharge, install batteries in a place that has proper ventilation and is at least 1 meter away from heat and ignition sources, such as switches and fuses.
Page 92
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-80 Battery cabinet components (1) Circuit breaker (2) BIM (3) Batteries (4) BIB (5) CIM Procedure Step 1 Loosen the captive screws on the circuit breaker panel, and remove the circuit breaker panel,...
Page 93
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-81 Loosening the captive screws on the circuit breaker panel Step 2 Install cables for batteries with different configurations as follows. Place batteries at the bottom layer of the battery cabinet based on battery configurations.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-82 Wiring diagram for the batteries and the circuit breaker (1) To a UPS (2) To a battery string (3) To a ground point The figure above is for reference only. If the neutral wire is configured for the battery cabinet, the neutral wire does not need to be connected.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-83 Connecting cables between the UPS and battery packs 2.3.3 Cable Connections to the Monitoring System For details about the monitoring component cable routing diagram, see the materials delivered with the product.
Page 96
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Name Port Type Access Equipment Equipment DIP Address USB2 Reserved USB3 Connects to a GSM modem (optional). USB4 Connects to a Pad (optional). Connects to a FE port LAN Switch (optional).
Page 97
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Name Port Type Access Equipment Equipment DIP Address temperature and T/H sensor humidity (T/H) (optional) in sensor the network (optional) of the cabinet: 2 network cabinet or the power cabinet to the COM3 port.
Page 98
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Name Port Type Access Equipment Equipment DIP Address the AI/DI_5 port on the ECC800e. Scenario 2: number of cabinets > 2 Connects the door status switch of the converged...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Name Port Type Access Equipment Equipment DIP Address door status switch of the network cabinet or battery cabinet. Scenario 2: number of cabinets > 2 Reserved DO port Connects to a CIM (optional).
Page 100
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Procedure Step 1 Remove the front door cover from the door status sensor. Step 2 Remove the cable cover from the middle of the door status sensor cover. Step 3 Route the tin-plated end on the delivered cable through the cable hole in the door status sensor base.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Scenario Device Ports status sensor ECC800e Network cabinet door status AI/DI_1 port on the sensor standalone AI/DI module Battery cabinet 1 door status AI/DI_2 port on the sensor standalone AI/DI module...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Figure 2-87 T/H sensor cable route ----End 2.3.3.4 (Optional) Connecting the Infrared Remote Control Module Cable Prerequisites The T/H sensor in the Converged Cabinet has connected to the ECC800e. Procedure Step 1 Connect the RJ45 (8-pin) end of the cable to the infrared remote control module and the non-RJ45 (6-pin) end to COM_OUT port on the T/H sensor in the Converged Cabinet.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Description configured. 3: Connects to the CIM1 when two battery cabinets are configured. 4: Connects to the CIM2 when two battery cabinets are configured. 21: (Optional) Connects to the server.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation The figure uses the VCN500 as an example. Step 3 Connect one end of the power cable to the power input port (as shown by (4) in Figure 2-90) on the power module and the other end to the PDU2000 in the cabinet.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Table 2-12 Port mapping between the CIM and the BIB Mapping Between the BCB_1 Ports on the CIM and the Signal Ports on the BIB OL_5 STA_6 DRV_7 GND_8 Step 3 Connect the CIM communications cable.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation Check That mounting ears are tightened to avoid incidents due to vibration. 2.4.2 Checking Installation Environment Table 2-14 Checking installation environment Check That The cabinet surface is clean and free of dirt and fingerprints.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 2 Installation 2.4.4 Checking Cable Installation Table 2-16 Checking cable installation Check That Cables are routed properly and meet engineering requirements. All cable joints are secured properly, especially the cable joints between network cables and at the cabinet bottom.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Commissioning Guide 3.1 Power-On Commissioning for the Power Supply and Distribution System Prerequisites You have completed the 2.4 Checking After Installation. Configure an upstream protective device that meets the overload and short-circuit protection requirements for the Converged Cabinet.
Page 111
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Figure 3-1 Circuit breakers (1) Maintenance bypass circuit breaker (2) UPS input circuit breaker (3) UPS output circuit breaker (4) Branch switch (5) SPD circuit breaker (6) SPD Procedure Step 1 Switch on all SPD circuit breakers.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Parameter Default Value Setting Value kVA/10 kVA UPS) Battery capacity 3 kVA/6 kVA UPS: Set as required 40 Ah Battery capacity = Capacity of a 10 kVA UPS: 65 Ah...
Page 113
After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
Procedure Step 1 Download and obtain the app installation package using any of the following three methods: Log in to HUAWEI App Store or Google Play, search for FusionModule, and tap Download. Log in to the ECC800 WebUI using a PC. Choose Maintenance > APP Download, and click Download APP.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide If you have set a password when enabling WiFi for the first time, you do not need to set the password again. Enter the password currently used for logging in to the WebUI and click Submit.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Procedure Step 1 Choose System Settings > Device Management. Step 2 Choose Faraway_AI/DI from the Device type drop-down list box and set device parameters. Table 3-4 Setting parameters for adding an independent deployment AI/DI unit...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide 3.2.6.2 Commissioning a Smoke Sensor Procedure Step 1 Check functions of the smoke sensor. Table 3-6 Commissioning the smoke sensor Check Method Normal Connection Status Simulate a smoky environment A smoke alarm is displayed on the active alarm page of under the smoke sensor.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide 3.2.6.4 Commissioning a T/H Sensor Procedure Step 1 (Optional) Add the T/H sensor to the ECC800. In the multi-cabinet scenario, this operation should be performed for the T/H sensor on the network cabinet.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide 3.2.7 (Optional) Commissioning an Infrared Remote Control Module 3.2.7.1 Adding an Infrared Remote Control Module Prerequisites The infrared remote control module has connected to the ECC800e, and the infrared remote control module and ECC800e are powered on.
Page 120
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide You have obtained the IP address of the ECC800e as well as the user name and password used for WebUI login. A PC with an IP address in the same network segment as that of the ECC800e is prepared, and the PC has connected to port WAN on the ECC800e.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Press the SW button once quickly and the infrared remote control module enters the waiting state for learning. Direct the smart cooling product remote control to the infrared receiving place on the infrared remote control module, and press the power button once.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Parameters Description Remarks the planned codes for CIMs in the range of 1 to 4. and battery strings. ----End 3.2.8.2 CIM and BIM Networking Prerequisites Before networking, ensure that all the CIMs and BIMs have no network parameters, that is, the RF_Z indicator on the CIM is steady green and the RUN/ALM indicator on the BIM is steady red.
Page 123
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Figure 3-2 CIM (1) Networking switch (2) ALM indicator (3) RF_Z indicator Step 2 Hold down the networking switch on the BIM for 2 seconds. When the RUN/ALM indicator turns from steady red to blinking green at super short intervals, and finally to blinking green at long intervals, the BIM connects to the CIM network.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide After the networking is complete, if the ALM indicator on the CIM is steady on, the number of devices online is smaller than the value of BIM number. Check that BIM number is set to a correct value and that the BIM is successfully networked.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide If you want to set the password for the switch during operations, perform procedures as instructed by the PuTTY tool. Step 3 Set ports 1-4 on the LAN switch to vLAN 2.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Procedure Step 1 Choose System Setting > Event Notification. Click Add in the Alarm Notification User Settings area. Step 2 Set Alarm Notification Language, enter Mobile number, and set Alarm Severity. Click ----End 3.2.10 Commissioning a Camera and a VCN...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Figure 3-6 Setting secondary stream 1 parameters ----End Follow-up Procedure Commission other cameras by referring to the procedure described in this section. 3.2.10.2 Commissioning a Camera (with an SD Card) Context If the VCN is not configured and an SD card is chosen, perform the following procedure.
Page 129
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Step 2 For details about how to commission the camera and set parameters, see the documents delivered with the device or the documents obtained by referring to the "Preparing Documentation"...
Page 130
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Figure 3-9 Setting audio and video parameters If longer-time video storage is required, set camera parameters according to the following table. Table 3-11 Camera configuration parameters Condition Result Encoding...
After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
Page 132
OMU Portal system. (Optional) Deploying IVS in Stack Mode. For details, log in to the https://e.huawei.com/, search for the VCN product documentation, open the documentation, and see the section (Optional) Deploying IVS in Stack Mode. Issue 07 (2019-12-20)
(Optional) Deploying MPUs in Cluster Mode. For details, log in to the https://e.huawei.com/, search for the VCN product documentation, open the documentation, and see the section (Optional) Deploying MPUs in Cluster Mode. For the VCN500, search for VCN500 Product Documentation. For the VCN540, search for VCN510&VCN520&VCN540 Product Documentation.
Page 134
After the first login, change the password in time to ensure account security and prevent unauthorized network attacks, such as data tampering. Huawei will not be liable for any security issues caused by your failure to change the preset password in time or password loss after changing.
Page 135
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 3 Commissioning Guide Click Next to complete the recording plan setting. When is displayed in the status bar, the recording plan has been set successfully. Click Finish. Step 4 Create a user.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance 4.1 O&M Precautions When performing high-voltage and AC operations, use dedicated tools and wear protective equipment. Before replacing a component which is not hot swappable, you must switch off the upstream circuit breaker or fuse, and verify that the component to be replaced is powered off.
Page 137
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Troubleshooting Result OFF, switch it Transformer fan Check whether The transformer 4.5.2.4 Replacing abnormal noise is fan rotates the Transformer Fan generated when the normally without...
Page 138
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Troubleshooting Result 1. Identify the Battery operating The ambient cause of an temperature battery abnormal battery temperature is operating 25± 5° C. temperature. ...
Page 139
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Troubleshooting Result ECC800e AC input Input voltage: If the input voltage 100–240 V AC is abnormal, check the power grid and Frequency: 50 input cable Hz/60 Hz connection.
Page 140
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Troubleshooting Result Cable connections The cable Secure loose cables. connections are secure. Cables are not Replace damaged damaged. cables. Camera Camera availability On the camera...
Page 141
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Quarterly preventive maintenance table Table 4-2 Quarterly preventive maintenance table Maintenance area Item Operation Expected Result Troubleshooting Power Distribution Surge protection Check the surge The surge If the surge...
Page 142
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting meets requirements. Power cables and The insulation Replace the terminals (between layer of cables is cables. the UPS and the intact and ...
Page 143
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting number of and the battery battery cells. input terminals at the UPS side Float charging is greater than voltage: 2.25 1% of the V/cell ±...
Page 144
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting V/cell ± 0.02 and float V/cell. charging voltage of a battery are Float charging normal. voltage: 2.25 2. If the charging V/cell ± 0.02 voltage of a V/cell.
Page 145
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting blinking green. 4.4.2 Troubleshooting the Monitoring System to rectify the fault. Network interface The green Check the network indicator indicator is steady cable connection.
Page 146
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting generated. Cleanliness Wipe the battery Remove dust from surface using a the battery surface. piece of white paper and the paper does not turn black.
Page 147
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting abnormal noise is fan rotates the Transformer generated when the normally without Fan Fuse transformer fan is abnormal noise. rotating. Dust inside the...
Page 148
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting loop after power-off using an insulation greater than or poor, check and tester. equal to 2 maintain the signal megohms. cable, emergency fan, and smart ETH gateway.
Page 149
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting clean and tidy appearance is without stains. abnormal, contact Huawei technical 2. The battery support. terminals are intact. 3. Batteries are free from damage and cracks.
Page 150
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting small. 2. Check whether the equalized charging voltage and float charging voltage are correctly set for the UPS. 3. If the fault persists, contact...
Page 151
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting battery, and check again whether the voltage is normal. 3. If the fault persists, contact Huawei technical support. 1. Locate the cause Shallow discharge...
Page 152
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting requirements of the battery manufacturer. After checking that the battery screws meet requirements, mark the screws for later check. Input voltage: If the input voltage...
Page 153
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting sensor, and smoke sensor from the monitoring system. View the historical alarms generated in this quarter and select the most common five ones.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Maintenance area Item Operation Expected Result Troubleshooting water sensor sensor into the sensor comes into replace the water water and check contact with sensor. whether a water water, a water...
Page 155
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Name Alarm Possible Cause Solution Severity installed certificate is within the validity period. Micro-Module Warning The network security Apply for a new network security certificate certificate has expired. security certificate...
Page 156
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Name Alarm Possible Cause Solution Severity AI/DI_2 Low Alarm Minor The same as those for the The same as those for the related alarm for AI/DI_1. related alarm for AI/DI_1.
Page 157
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Name Alarm Possible Cause Solution Severity not match the specified types on the WebUI type. match the actual sensor types. AI/DI_2 Wiring Major The same as those for the...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Name Alarm Possible Cause Solution Severity AI/DI_5 Wiring Major The same as those for the The same as those for the Error Alarm related alarm for AI/DI_1. related alarm for AI/DI_1.
Page 159
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Solution mains recovers. Abnormal Minor The mains frequency is not in Check the mains input mains the range of 40 Hz to 70 Hz. frequency. If the mains input volt.
Page 160
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Solution 50° C). charge/discharge current by reducing loads. 2. The battery charge/discharge current exceeds the upper threshold. 1. The configured number of 1. Check battery parameter Batt.
Page 161
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Solution 1. The ambient temperature 1. Decrease the ambient UPS inter Minor exceeds 40° C. temperature. overtemp. 2. The air channel is blocked. 2. Keep the air intake and exhaust vents of the UPS 3.
Page 162
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Solution Rectifier Critical The hardware is damaged. Contact Huawei technical fault support for repair. (Reason Rectifier Critical fault (Reason 1. The ambient temperature 1. Decrease the ambient...
Page 163
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Solution Internal Critical The NTC is not connected or Contact Huawei technical fault is damaged. support for repair. (Reason Internal Self-load cable connections Critical Reconnect the cables.
Page 164
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Solution ble ver. (Reason Incompati Critical ble ver. (Reason Incompati Critical ble ver. (Reason Charger Critical The charger capacitor is faulty. Contact Huawei technical alarm support for repair.
Page 165
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Solution timeout (Reason Power Minor The load exceeds the rated Reduce the load or replace the segment loading capacity. UPS with a large-capacity (Reason UPS. 1. Check the battery voltage.
Page 166
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Solution alarm damaged. connected. (Reason 2. Replace the parallel cable. 3. Contact Huawei technical support for repair. Paral. Minor cable alarm (Reason Critical The EPO button is pressed.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Solution undertemp the UPS equipment room is temperature in the UPS erature below the alarm threshold equipment room. (default value: 0° C). 2. Replace the T/H 2.
Page 168
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Measure Communication Critical The network cable is Rectify any network Failure loose or the cable connection encryption fault and ensure that certificate is the certificate is incorrect.
Page 169
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Measure version version fails to be package again and upgraded to the perform another target version. upgrade. Board Fault (BIM1 Major The BIM is Check whether the to BIM40) damaged.
Page 170
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Measure 1. The battery 1. Manually charge Lagging (BIM1 to Major discharge voltage batteries in BIM40) is below the equalized mode. lower threshold. Then perform a capacity test after 2.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Alarm Severity Possible Cause Measure 1. The batteries 1. Manually charge Hibernation Voltage Minor have different batteries in Exception (BIM1 to SOC values. equalized mode. BIM40) Then perform a 2. The batteries...
Page 172
UPS again. Otherwise, the fault may be extended, or the UPS may be damaged. If the fault is not rectified, contact Huawei technical support. Table 4-5 Troubleshooting Power Supply and Distribution Faults Symptom Possible Cause...
Page 173
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Symptom Possible Cause Measure not securely connected. Add the UPS on the ECC800e WebUI. The UPS is deleted on the ECC800e WebUI. The UPS does not report The output power cable is...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Symptom Possible Cause Measure activate the LCD password. If you forget the LCD password and feature code, contact your local Huawei technical support. The transformer experiences Keep the load power UPS EPO overtemperature.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Symptom Possible Cause Measure persists, replace the PSU. If multiple PSUs are locked out, remove all PSUs and reinstall them one by one to locate the faulty ones. Then replace faulty PSUs.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Procedure Step 1 Remove the cover from the door status sensor. Step 2 Remove the communications cable using a Phillips screwdriver and insulate the cable. When removing cables, label the cables with corresponding terminal ports for later connection.
Page 177
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance The vertical rPDU and horizontal rPDU are available. This section describes how to replace a vertical rPDU. Procedure Step 1 Open the rear door of the cabinet. Step 2 Turn off the output circuit breaker of the power distribution subrack corresponding to the rPDU, and remove the power cable from the terminal block at the top of the rPDU.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance 4.5.2.2 Replacing a Surge Protection Module Prerequisites Do not replace a surge protection module during a thunderstorm. Before replacing a surge protection module, wear protective insulation gloves. ...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Figure 4-3 Replacing a surge protection module Step 5 Install a new surge protection module. Step 6 Reinstall the protective panel of the SPD and switch the SPD circuit breaker to ON.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Wrap the exposed cable with insulation tape. Step 6 Unscrew the UPS front cover and pull out the UPS. Step 7 Install the new UPS and screw it to the cabinet.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Figure 4-4 Removing the fan fuse Step 2 Install the new fan fuse. ----End 4.5.2.5 Replacing the Transformer Prerequisites Tools: electroprobe, insulation gloves, Phillips screwdriver, multimeter Materials: spare functional transformer of the same model ...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Step 6 Install the new transformer and secure it to the cabinet using screws. Step 7 Connect the cables of the transformer in sequence. Check whether the cable labels are consistent with the marks on the wiring terminals and whether all cables are connected.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Figure 4-7 Removing the copper bar Step 6 Remove the faulty circuit breaker using a screwdriver. Step 7 Replacing the faulty circuit breaker on PDU5000 with a new one. Step 8 (Optional) Insert the removed copper bar into the circuit breaker and secure it with screws.
Page 185
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance The upstream switch for the cabinets must be turned off. Ensure that the input is disconnected during replacement. Procedure Step 1 Replace the PDU. Turn off the battery switch. Open the front and rear doors of the Converged Cabinet. Remove the input power cable, UPS input and output power cables, smart cooling product power cable, IT cabinet power cable, and signal cable from the rear of the PDU.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Connect the UPS input and output power cables, smart cooling product power cable, IT cabinet power cable, signal cable, and general input power cable in sequence. Check whether the cable labels are consistent with the marks on the wiring terminals and whether all cables are connected.
Page 187
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Figure 4-9 Loosening the captive screws on the circuit breaker panel Step 3 Switch a multimeter to the DC voltage mode to measure the voltage between positive and negative copper bars at the upper part of the battery switch. If the voltage is lower than 36 V...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Figure 4-10 Removing a battery switch trip board Step 4 Remove the four screws from the BIB board using a Phillips screwdriver, and remove the faulty BIB board, as shown by (2) in Figure 4-10.
Page 189
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Procedure Step 1 Determine the position of the faulty battery switch tripper, and open the corresponding cabinet door. Step 2 Remove the front panel of the battery cabinet circuit breaker using a Phillips screwdriver, as...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance 4.5.2.10 Replacing a Battery Switch Auxiliary Contact Prerequisites The battery switch of the battery cabinet must be disconnected. When there are multiple battery strings connected in parallel, all battery switches need to be disconnected. Ensure that all battery switches are disconnected during replacement.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance The battery switch of the battery cabinet must be disconnected. When there are multiple battery strings connected in parallel, all battery switches need to be disconnected. Ensure that all battery switches are disconnected during replacement.
Page 192
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance The battery switch of the battery cabinet must be disconnected. When there are multiple battery strings connected in parallel, all battery switches need to be disconnected. Ensure that all battery switches are disconnected during replacement.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance When removing cables, remove the battery cable below the battery MCB first. After removing cables, insulate the cable terminals. When removing cables, label the cables with corresponding terminal ports for later connection.
Page 194
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance The battery switch of the battery cabinet must be disconnected. When there are multiple battery strings connected in parallel, all battery switches need to be disconnected. Ensure that all battery switches are disconnected during replacement.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance After removing cables, insulate the cable terminals. When removing cables, label the cables with corresponding terminal ports for later connection. Figure 4-14 Removing a battery current sensor Step 5 Unplug the battery current sensor, cut off the cable ties, and remove the faulty battery current...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance For devices connected to the RS485 port on the ECC800e, set parameters by referring to 3.2.6.4 Commissioning a T/H Sensor after the device is replaced by a new one.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance If multiple CIMs are cascaded, remove all cables and label them. Disconnect the cable from the HALL current monitoring port. Step 3 Remove the CIM. Remove the CIM from the fastener, as shown in Figure 4-15.
Page 198
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Figure 4-16 Removing a BIM Step 3 Clamp the BIM whose network parameters are cleared to the fastener. Step 4 Connect one end of the BIM cable to the pin port on the BIM.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Step 8 Press the CIM networking switch for 2 seconds. When the RF_Z indicator on the CIM turns from blinking green at super short intervals to blinking green at long intervals, the replacement is complete.
Page 200
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Figure 4-19 Removing the inner cover In the scenario with a SD card, remove the SD card and install to a new camera. Step 3 Remove the screws securing the camera base from the camera mounting plate, as shown in Figure 4-20.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Follow-up Procedure Check whether the new camera works properly and adjust the camera angle. If video images are properly displayed on the video screen of the management system client, the new camera works properly.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance 4.5.3.7 Replacing a Pad Prerequisites Tools: ESD wrist strap, ESD gloves, labels, and marker Materials: a reserved undamaged and undeformed pad of the appropriate model Procedure Step 1 Install the APP on the reserved pad and connect the pad to the network over the WiFi hotspot of the data center.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance 4.5.3.10 Replacing a VCN500 Prerequisites Recommended tools: Phillips screwdriver, flat-head screwdriver A VCN500 needs to be replaced. A spare VCN500 of the same model is available and functional.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Figure 4-22 Installing a VCN500 Step 5 Reconnect the cables to the new VCN500. ----End 4.5.3.11 Replacing a VCN540 Prerequisites Tools: Phillips screwdriver A spare VCN540 of the same model is available and functional.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Figure 4-23 Securing a VCN540 Step 4 Reconnect the cables to the new VCN540. Step 5 Turn on the power switch of the VCN540. Step 6 On the WebUI of the ECC800, choose Monitoring > System > ECC800 > Controls >...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Before removing a T/H sensor, remember the DIP switch setting on it. When you install a new T/H sensor, you need to set the same DIP switch setting for the new one.
ECC800e, the new smoke sensor works properly. 4.5.4 (Optional) Replacing a Fan Assembly Context For a customized FusionModule500, replace a fan assembly by performing the operations in this section if a fan assembly is installed at the top of the cabinet. Preparations...
Page 208
FusionModule500 Smart Mini Data Center User Manual (ECC800e) 4 Maintenance Figure 4-25 Removing a fan assembly Step 5 Install the new fan assembly at the 42 U position in the rear of the cabinet. Step 6 Reconnect the power cable to the rPDU.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) A FAQ A.1 Battery Shallow Discharge Test To facilitate operation and maintenance, a battery shallow discharge test can be configured in the PLC function. Prerequisites Only the UPS2000-G-(6 kVA–10 kVA) and UPS2000-G-3 kVA (dual live wires) support a battery shallow discharge test on the ECC800e.
FusionModule500 Smart Mini Data Center User Manual (ECC800e) B Cable List Cable List Configure the following cables based on the purchased devices. Table B-1 System cable list Description Start Remarks Number 04093635-01 Signal cable GATE MUE06A-AI/D from the door status sensor in...
Page 212
FusionModule500 Smart Mini Data Center User Manual (ECC800e) B Cable List Description Start Remarks Number AI/DI unit 04093635-05 Signal cable TEM-HUM MUE06A-CO from the T/H M_OUT sensor in the network cabinet to the independent deployment AI/DI unit 04093636-01 Signal cable...
Page 213
FusionModule500 Smart Mini Data Center User Manual (ECC800e) B Cable List Description Start Remarks Number from the video camera to the LAN switch 04070005 Signal cable ECC: WAN LAN switch: Length: 2.2 m from the ECC to the LAN switch...
FusionModule500 Smart Mini Data Center User Manual (ECC800e) C Bearing Capacity Assessment Bearing Capacity Assessment Measures for Assessing the Bearing Capacity of an Equipment Room The bearing capacity of equipment room is measured in uniformly distributed load (UDL). It indicates the capacity of the equipment room to bear loads, such as communications equipment, batteries, cables, and operators, while operating properly.
Page 215
FusionModule500 Smart Mini Data Center User Manual (ECC800e) C Bearing Capacity Assessment q = P/A A = (W + c/2 + d/2) x (D + e/2 + f/2) Where q is the equivalent UDL (kg/m ) of the cabinet where all devices are installed.
Page 216
FusionModule500 Smart Mini Data Center User Manual (ECC800e) C Bearing Capacity Assessment Measures for Improving the Bearing Capacity of an Equipment Room If the bearing capacity of the equipment room or raised floor is insufficient, arrange the cabinet layout or enhance the equipment room. Assess the bearing capacity of the equipment room.
Page 217
FusionModule500 Smart Mini Data Center User Manual (ECC800e) C Bearing Capacity Assessment Figure C-4 Placing the cabinet on the spandrel girder or near the bearing wall (1) Correct location (2) Spandrel girder (3) Bearing wall (4) Incorrect location If the static load bearing capacity of the raised floor is insufficient, install bases under the raised floor whose height ranges from 200 mm to 1200 mm.