GE SPS-48V Quick Start Manual
GE SPS-48V Quick Start Manual

GE SPS-48V Quick Start Manual

Slimline power shelf

Advertisement

Quick Links

Document xxxxxxxxxx R01 2017 August
GE
Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure
No vertical spacing is required, allow a minimum 2", inch clearance at back of shelf for rectifier airflow.

Tools required:

Wire cutters and strippers
Cable crimpers
Step 1 - Mount Shelf
1. Reposition mounting ears as required - 3 screws each. (Reverse ears for 5" setback.)
Torque to 10 in-lb. (1.2 Nm) - Phillips screwdriver.
2. Attach shelf to the frame using a minimum of four screws (two on each side) - 12-24 (provided).
Torque to 35 in-lb. (4 Nm) - 5/16" socket.
Step 2 - Connect Chassis Ground and DC Reference (CO) Ground
Lug Landings: #10 double-hole on 5/8-inch center (lugs not provided)
Some applications may rely on frame mounting screws for chassis ground, omitting the chassis ground wire.
Some applications may use the Chassis Ground strap, using a single wire for both chassis ground and DC
reference ground.
Minimum 10 AWG wire is recommended.
Torque 10-32 screws to 30 in-lb. (3.4 Nm) - 5/16" socket.
SPS –48V Slimline Power Shelf

Quick Start Guide

Torque wrench - 0-65 in-lb (0-10 Nm)
Sockets - 5/16", 7/16, etc.
SPS J200703 L005 – Quick Start Guide
Document 850052515 r02 2019 April
Screwdrivers - Philips #1 and #2, Flat
small
1

Advertisement

Table of Contents
loading

Summary of Contents for GE SPS-48V

  • Page 1 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide No vertical spacing is required, allow a minimum 2”, inch clearance at back of shelf for rectifier airflow. Tools required: Screwdrivers - Philips #1 and #2, Flat Wire cutters and strippers...
  • Page 2 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide Connections - L005 shown Step 3 - Connect AC Input Connect AC cords - 1 C13 cord (L005), 2 C13 cords (L005A), or 1 C19 cord (L005C) Secure cords with the furnished AC retention clamps.
  • Page 3 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide Step 5 - Install Breakers and Fuses Install breakers into positions as specified in Site Engineering Instructions.
  • Page 4 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide Step 12 - Configure Controller per Galaxy Pulsar Edge Controller Quick Start Guide The shelf is equipped with a 100A, 50mV battery shunt and Low Voltage Battery Disconnect (LVBD0. 1.
  • Page 5 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide Information Alarm Connections See the Slimline Power System Brochure for details. Alarm connections are on the rear of the shelf – J1 is the Alarm Outputs and J2 is Alarm Inputs Change alarm descriptions via LAN port (Web pages) Connector J1 –...
  • Page 6 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide Safety Statements • Do not install this equipment over combustible surfaces. • Rules and Regulations - Follow all national and local rules and regulations when making field connections. •...
  • Page 7 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide • Taille exigée par le National Electric Code (NEC) et/ou les codes locaux. • Limites de sécurité testées-référez-vous aux cotes de l’équipement pour assurer que le courant ne dépasse pas: Charge continue (Liste 1)-60% de la note de protection Charge maximale (liste 2-typiquement fin de décharge)-80% du degré...
  • Page 8 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide Precautions • Install, service, and operate equipment only by professional, skilled and qualified personnel who have the necessary knowledge and practical experience with electrical equipment and who understand the hazards that can arise when working on this type of equipment.
  • Page 9 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide Précautions • Installer, mettre en service et utiliser l’équipement uniquement par du personnel professionnel, compétent et qualifié possédant les connaissances et l’expérience pratique nécessaires en matière d’équipement électrique et qui comprennent les dangers qui peuvent survenir lors de l’utilisation de ce type d’équipement .
  • Page 10 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide Notes: SPS J200703 L005 – Quick Start Guide Document 850052515 r02 2019 April...
  • Page 11 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide Notes: SPS J200703 L005 – Quick Start Guide Document 850052515 r02 2019 April...
  • Page 12 Document xxxxxxxxxx R01 2017 August SPS –48V Slimline Power Shelf Models: J2007003L005 - alpha suffixes per Slimline Power System Brochure Critical Power Quick Start Guide Notes: SPS J200703 L005 – Quick Start Guide Document 850052515 r02 2019 April...

Table of Contents