hit counter script
Download Print this page
NEC Express5800 A2040d Initial Operation Verification Manual
NEC Express5800 A2040d Initial Operation Verification Manual

NEC Express5800 A2040d Initial Operation Verification Manual

Hide thumbs Also See for Express5800 A2040d:

Advertisement

Quick Links

SAP HANA Appliance
Express5800 A2040d
Initial Operation Verification Guide
rd
23
of January 2017
NEC SAP Global Competence Center

Advertisement

loading

Summary of Contents for NEC Express5800 A2040d

  • Page 1 SAP HANA Appliance Express5800 A2040d Initial Operation Verification Guide of January 2017 NEC SAP Global Competence Center...
  • Page 2 Please connect the external storage to the 2 RAID controller. The RAID controller is mounted in PCI slot 12. Please connect its port “A” to port “0” of the JBOD. Please connect two power cables to the external storage as well. © NEC Corporation 2017...
  • Page 3: Start The Server

    Do not connect or disconnect USB device while POST is running. In addition, do not connect or disconnect remote media. Wait for the server to finish the boot operation. Once it has completed you will be presented the following login screen. Please login to the OS. © NEC Corporation 2017...
  • Page 4: Additional Information

    Power off the server Power off the server. Use the following command on terminal: shutdown –h now 4. Additional information For additional information about the hardware please review the “User’s guide” for A2040d available at www.58support.nec.co.jp/global/download © NEC Corporation 2017...